Progress
Hindustan Aeronautics Limited (HAL), Department of Defence Production, invites bids for civil works associated with the HELICOPTER IRON BIRD FACILITY—RIGS, DAC, CONTROL SYSTEM. The scope aligns with Annexure-I technical specifications and Annexure-II commercial terms. Site visits at RWR&DC HAL are available to bidders to understand on-site technical details. Delivery is constrained to a 22-24 month window from contract award, with option clauses for quantity adjustments up to 50% and extended timelines as defined. This procurement emphasizes compliance with technical parameters and structured commercial terms to meet project requirements.
Key differentiators include the mandatory site assessment, adherence to essential technical criteria, and the potential for procurement preference under state MSME policies. Bidders should prepare to demonstrate capability to fulfill long-period civil works tied to aircraft testing infrastructure.
Essential delivery window of 22-24 months from award
Mandatory site visit at HAL RWR&DC prior to quotation
Up to 50% quantity variation permitted at contracted rates
GST reimbursement will be as actuals or as per applicable rates (whichever is lower), subject to quoted GST percentage
Delivery window of 22-24 months from contract award; option for extended delivery based on quantity changes
Not explicitly stated in provided data; refer to Annexure ATC for LD provisions
Registered GSTIN and PAN with valid documentation
Capability to execute long-duration civil works tied to aviation infrastructure
MSME-based bidders from the state with Udyam registration (for purchase preference)
Quantity
2
Category
HELICOPTER IRON BIRD FACILITY - RIGS, DAC, CONTROL SYSTEM
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HELICOPTER IRON BIRD FACILITY - RIGS, DAC, CONTROL SYSTEM , HELICOPTER IRON BIRD FACILITY-CIVIL WORKS
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
60
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
720
Delivery Locations
1
Delivery Cities
BANGALORE CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | BANGALORE CITY | BANGALORE CITY | - | - | 1 | 720 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
30-Oct-2026, 11:30 am
Opening Date
31-Oct-2026, 11:30 am
Discover companies most likely to bid on this tender
PAN card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
GST compliance documentation as per terms
Vendor code creation documents
Any Annexure-I/II technical and commercial compliance certificates
Key insights about KARNATAKA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid. Compliance with Annexure-I technical specs and Annexure-II commercial terms is mandatory. Site visit to HAL RWR&DC is encouraged to understand project scope before quotation; delivery must meet 22-24 months from award.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, GST compliance statements, vendor code creation details, and technical/commercial certificates as per Annexure-I and Annexure-II. Ensure GST rates align with actuals or lower applicable rates.
The project requires delivery within 22 to 24 months from the contract award date. The schedule may adjust if quantity variations are exercised under the 50% option clause, with timelines recalculated accordingly.
State-based MSMEs with valid Udyam registration and online credential validation may receive purchase preference under the Public Procurement Policy for Micro and Small Enterprises, 2012, as applicable to HAL's bid inviting authority.
All technical parameters in Annexure-I are essential criteria with no relaxation; bidders must demonstrate full compliance for RIGS, DAC, and CONTROL SYSTEM civil works as described by HAL's specifications.
Yes, up to 50% of the bid quantity can be increased at contract rates during the currency, with delivery timelines adjusted by the option clause formula.
GST reimbursement is provided at actuals or as per applicable rates, whichever is lower, and subject to the quoted GST %. Bidders must document GST compliance accordingly.
Interested bidders may contact HAL representatives and visit the RWR&DC site to gain complete knowledge of technical details before final quotation submission. Arrange through the contact person listed in the ATC.