TenderDekho Logo
Active GEM

Bhilai Steel Plant Continuous Emission Monitor Tender Durg Chhattisgarh 2026 IS Standards & 18-Month Warranty

Bid Publish Date

01-Sep-2026, 8:33 pm

Bid End Date

17-Sep-2026, 5:00 pm

Generate Docs

Progress

Issue01-Sep-2026, 8:33 pm
Corrigendum16-Sep-2026
AwardPending

Key Highlights

  • Preferred Make Manufacturers: Forbes Marshall, Durag Instrumentation, Emerson Process Management, AMETEK, GE India, Endress+Hauser
  • OEM authorization and backup guarantee required with offer
  • Single-source procurement for matching parts on overall L-1 basis
  • GeM order to be regularized through BSP SAP; post-order activities via SAP

Tender Overview

The Bhilai Steel Plant (BSP), a unit of the Steel Authority of India Limited, invites bids for the Supply, Installation, Testing and Commissioning of a Continuous Emission Monitor system under a BSP procurement process in Durg, Chhattisgarh. The scope includes equipment supply, on-site installation, and commissioning, with preferred manufacturers listed to ensure compatibility and quality. The contract emphasizes a single-source procurement for matching parts and imposes a structured warranty and post-order processes via BSP SAP. The estimated scope suggests a high-integrity emissions monitoring solution aligned to BSP environmental and process-control objectives, with a clear emphasis on post-order handling and acceptance criteria. A key differentiator is the restricted vendor pool and the requirement for manufacturer authorization and backup guarantees, ensuring genuine OEM supply. The tender also specifies SAP-based post-order activities for GRN, billing, and related processes, reinforcing integration with BSP’s ERP ecosystem.

Technical Specifications & Requirements

  • Scope: Supply, Installation, Testing and Commissioning of Continuous Emission Monitor system
  • Warranty: 18 months from supply or 12 months from commissioning, whichever is earlier
  • Authorized vendors: Forbes Marshall, Durag Instrumentation, Emerson Process Management, AMETEK, GE India, Endress+Hauser
  • Bidding condition: Single-source procurement for matching parts; manufacturer authorization required with a backup quality guarantee
  • Payment terms: Line item (10) 90% on GRN, 10% on commissioning; Line item (20) 100% on commissioning certificate
  • Order processing: GeM order to be regularized through BSP SAP; post-order activities via SAP
  • Documentation: Vendor registration and manufacturer authorization must be submitted with bids
  • BOQ: Not disclosed; total items listed as 0, indicating a specialized, turnkey solution

Terms & Eligibility

  • EMD: Not specified in data; bidders must review BSP terms for security deposit
  • Delivery: Not specified; likely tied to commissioning milestone
  • Warranty/Support: 18 months warranty; 12 months from commissioning
  • Party eligibility: Only listed manufacturers or their authorized representatives may bid; ensure OEM authorization with tender number
  • Documentation: Submit complete documents including authorization letters and backup guarantees
  • Acceptance: Acceptance and commissioning certification by Indenting Department required for final payment
  • Post-order: All GeM → SAP integration and GRN/Bill processing to BSP SAP system

Key Specifications

  • Product/service names: Continuous Emission Monitor system

  • Quantity/Scope: Turnkey supply, installation, testing and commissioning

  • EMD/Value: Not specified in data; review BSP terms

  • Experience: Authorized OEMs listed; back-up guarantees required

  • Quality/Compliance: OEM authorizations and post-order SAP integration

  • Delivery/Installation: On-site commissioning per BSP requirements

Terms & Conditions

  • Single-source procurement for matching parts; L-1 basis

  • OEM authorization with backup guarantee required

  • GeM orders processed through BSP SAP; post-order activities in SAP

Important Clauses

Payment Terms

Line item (10): 90% on GRN and 10% on commissioning; Line item (20): 100% on commissioning certificate

Delivery Schedule

No explicit delivery timeline provided; commissioning milestone governs payment release

Penalties/Liquidated Damages

Warranty enforcement and replacement conditions specified; no explicit LD percentage provided in data

Bidder Eligibility

  • Authorized representation of one of the listed manufacturers

  • Submit manufacturer authorization and backup quality guarantee

  • Register with SAIL BSP vendor system and complete due process

Tender Data

Bid Details

Quantity

2

Category

CONTINUOUS EMISSION MONITOR

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CONTINUOUS EMISSION MONITOR , SUPERVISION CHARGES

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Durg

Delivery Pincodes

490001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ravi Kumar490001,Room No. 302, 3rd Floor, Ispat Bhavan Bhilai Steel Plant Bhilai-490001DurgChhattisgarh490001190-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9831291.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bhilai Steel Plant

Office Name

Materials Management

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

16-Sep-2026

Extended Deadline

17-Sep-2026, 11:30 am

Opening Date

18-Sep-2026, 11:30 am

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Manufacturer authorization from preferred vendors

4

Backup quality guarantee from manufacturer

5

Tender-specific authorization letter referencing the bid number

6

Registration with SAIL Tenders / vendor registration form

7

Any prior experience certificates related to emission monitoring systems

8

Financial statements or turn-over evidence if requested

9

Technical bid documents demonstrating compliance with CEM systems

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for the CEM tender in Durg Bhilai Steel Plant

Bidders must be authorized by one of the listed manufacturers and submit OEM authorization with a backup guarantee. Include GeM/SAP registration, complete technical bid, and ensure compliance with BSP’s single-source parts policy. Payment terms hinge on GRN and commissioning certificates.

What documents are required for the BSP CEM tender

Submit GST, PAN, manufacturer authorization letters for preferred vendors, backup quality guarantee, tender-specific authorization referencing the bid number, vendor registration confirmation, and any prior emission-monitoring experience certificates to participate.

What are the payment terms for line items in this tender

Line item 10 pays 90% on GRN and 10% on commissioning; Line item 20 pays 100% on commissioning certificate. Final payment requires Indenting Department certification and SAP GRN completion.

Which manufacturers are preferred for this BSP tender in 2026

Preferred manufacturers include Forbes Marshall, Durag Instrumentation, Emerson Process Management, AMETEK, GE India, Endress+Hauser. Offer must be supported by manufacturer authorization and a back-up warranty from the OEM.

What is the warranty period for CEM equipment under this bid

Warranty is 18 months from the date of supply or 12 months from the date of commissioning, whichever occurs first. Replacement is at BSP stores’ cost if performance issues are found within the warranty period.

Is there a BOQ available for this BSP tender in Bhilai

No BOQ items are disclosed in the data; the procurement is structured as a turnkey supply, installation, testing and commissioning of a Continuous Emission Monitor system with matching parts from a single source.

How does SAP integration affect GeM orders for this BSP tender

GeM orders will be regularized through BSP SAP, with all post-order activities—material receipts, GRN, and billing—handled within the SAP system to ensure traceability and compliance with BSP processes.

What qualifies as eligible experience for this emission monitor bid

Eligibility centers on OEM authorization from listed manufacturers and demonstrated capability in delivering and commissioning CEM systems, along with a valid backup warranty and prior experience certificates in similar projects.