Progress
Gujarat State Electricity Corporation Limited (GSECL), Vadodara, issues a tender for the complete bare pump assembly of the jacking oil pump for a 500 MW unit (Unit No. 6) from the supplier of Allweiler GmbH. The bid includes an EMD of ₹76,110 and allows quantity variation up to 25% both at the initial order and during contract execution. The ATC document and Schedule-B requirements govern material supply and technical alignment. No BOQ items are provided in the public data, emphasizing adherence to the bid terms and supplier compliance with the specific ATC clauses.
EMD amount and payment security as per ATC
Quantity variation up to 25% during execution
Delivery schedule governed by original period with potential extensions
EMD of ₹76,110; contract payment terms to follow ATC and Schedule-B
Delivery period adjustable with option clause; minimum extension 30 days
LD/penalties to be defined in ATC; not detailed in public data
Experience in supplying pump assemblies or OEM-specified equipment
Financial stability evidenced by statements
Ability to comply with Schedule-B and Allweiler OEM requirements
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LPP 2683 COMPLETE BARE PUMP ASSEMBLY OF JACKING OIL PUMP, MAKE: ALLWEILER GMBH FOR 500 MW UNIT NO. 6
Advisory Bank
Bank Of Baroda
ePBG Percentage
5%
ePBG Duration (Months)
7
Max Delivery Days
168
Delivery Locations
1
Delivery Cities
Tapi
Delivery Pincodes
394680
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pallavkumar Maganbhai Solanki | 394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPI | Tapi | Gujarat | 394680 | 1 | 168 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar pump assemblies
Financial statements or solvency proof
EMD submission proof (demand draft or online payment receipt)
Technical bid documents reflecting Allweiler pump compatibility
OEM authorization or dealer authorization for Allweiler GmbH
Schedule-B compliance statement and ATC view/download
Any additional technical compliance certificates per ATC
Key insights about GUJARAT tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD ₹76,110, and OEM authorizations. Ensure compliance with Schedule-B and ATC terms; verify Allweiler OEM compatibility and provide technical documentation detailing pump model, delivery schedule, and warranty expectations.
Required documents include GST certificate, PAN, experience certificates for similar pumps, financial statements, EMD proof, OEM authorization for Allweiler, and Schedule-B compliance. ATC may request technical compliance certificates and installation plans; ensure these are packaged with the bid.
Specifications focus on bare pump assembly for 500 MW unit No. 6, matching Allweiler design. Ensure OEM alignment, proper compatibility with jacking oil systems, and adherence to Schedule-B requirements; detailed performance metrics will be in ATC.
EMD is ₹76,110. Payment terms follow ATC; submit EMD via online or demand draft per tender rules. Ensure EMD validity spans the bid review period as specified in the ATC documentation.
Delivery is governed by the original delivery period. If quantity increases, extension time equals (additional quantity/original quantity) × original delivery period, with a minimum of 30 days; the purchaser may extend within contract limits per ATC.
Provide evidence of OEM authorization, prior experience with similar pump assemblies, financial solvency, GST and PAN, and Schedule-B compliance. ATC governs final eligibility; ensure all documents align with Schedule-B and ATC expectations.
Final standards are defined in the Buyer Added ATC and Schedule-B. Expect OEM alignment to Allweiler specifications, and any required certifications will be listed in ATC; ensure ISI/ISO where applicable per ATC.
Review Schedule-B in the ATC document; align your technical proposal to listed scope, material specifications, and delivery terms. Include detailed pump model data, OEM references, and installation/commissioning plans.