North Eastern Electric Power Corporation Limited Retrofitting 36 kV Vacuum Circuit Breaker Kameng Hydro West Kameng Arunachal Pradesh 2026

Bid Publish Date

31-Aug-2026, 6:40 pm

Bid End Date

21-Sep-2026, 7:00 pm

Progress

Issue31-Aug-2026, 6:40 pm
AwardPending

Tender Overview

Organization: North Eastern Electric Power Corporation Limited (NEEPCO) seeks to retrofit an existing 33 kV SF6 circuit breaker to a 36 kV Vacuum Circuit Breaker at the Kameng Hydro Power project, located in West Kameng, Arunachal Pradesh. The scope covers replacement at site, with the bid unit defined as a single LOT containing all material and quantities per BOQ. A site survey and approved site visit certificate are prerequisites for bidding, and the option clause allows quantity adjustments up to 25% during and after contract execution. The tender emphasizes detailed OEM credentials, ATC adherence, and post-award price breakups.

Technical Specifications & Requirements

  • Product/Service: Retrofitting of 33 kV SF6 CB to 36 kV Vacuum Circuit Breaker at Kameng Hydro Power
  • Location: Kameng Hydro Power, West Kameng, Arunachal Pradesh (790001)
  • Delivery scope: Site assessment, installation, erection as per bid documentation; price breakup to include basic price, GST, and other charges after award
  • Documentation: OEM credentials, site survey report, technical bid evidence of SBI Collect EMD payment, and ATC adherence
  • ATC/ATC-related references: Read detailed ATC sections in bid document; compliance with EMD, turnover, and LD terms as specified in ATC
  • Fiscal/contract terms: Quantity variation up to 25%, delivery period adjustments with minimum 30 days when options are exercised

Terms, Conditions & Eligibility

  • EMD and payment: Earnest Money via SBI Collect; detailed payment terms in ATC; price breakup after award
  • Site conditions: Mandatory site visit prior to bid submission; submit site survey certficate with bid
  • OEM credentials: Demonstrated OEM authorization and technical eligibility per Sections IV-A/IV-B and III-Contract terms
  • Bid packaging: One LOT per GeM unit; ensure compliance across all BOQ and specifications
  • Penalties and LD: Terms to be governed by detailed ATC; LD clauses apply per ATC and contract
  • Submission: Follow ATC guidance for technical and financial bid documents; queries to specified email addresses

Key Specifications

  • Product: 36 kV Vacuum Circuit Breaker retrofit replacing 33 kV SF6 CB

  • Location: Kameng Hydro Power project, West Kameng, Arunachal Pradesh

  • Delivery: Site survey, installation, erection per ATC terms

  • Standards/Compliance: OEM credentials and Section IV-A/IV-B technical specifications

  • Pricing: Item-wise price breakup to include basic price, GST, and other charges post award

  • Delivery window: Option: quantity adjustment up to 25% with minimum 30 days additional time

Terms & Conditions

  • EMD to be paid via SBI Collect and documented with bid submission

  • Mandatory site visit; submit site survey certificates with bid

  • One LOT bidding unit; adherence to detailed ATC and OEM credentials

  • Delivery period adjustable by option clause (up to 25%), minimum 30 days

  • Price breakup to be provided after contract award (basic price, GST, other charges)

Important Clauses

Payment Terms

EMD via SBI Collect; post-award payment terms as per ATC and contract; item-wise price breakup required

Delivery Schedule

Delivery period can be extended with the option clause; additional time = (increased quantity / original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Penalties/LD to be governed by detailed ATC terms; LD rates and schedules specified in contract sections

Bidder Eligibility

  • Demonstrated experience in retrofitting high-voltage circuit breakers (HV equipment)

  • OEM authorization from the original equipment manufacturer

  • Financial capacity to manage project costs and provide warranty/AMC as per ATC

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

150

OEM Avg. Turnover

1200

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Retrofitting of 36 kV Vacuum Circuit Breaker in place of existing 33 kV SF6 CB at Kameng Hydro Power

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

West Kameng

Delivery Pincodes

790114

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mrigendra Phukan790114,Kameng Hydro Power Station Kimi, West KamengWest KamengArunachal Pradesh7901141180-

Authority Records

MINISTRY OF POWERNORTH EASTERN ELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9827468.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Categories 10

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar retrofitting of high-voltage breakers

4

Financial statements and turnover proof (as per ATC)

5

EMD/Security deposit payment proof via SBI Collect

6

OEM authorization/credentials from the original equipment manufacturer

7

Technical bid documents and compliance certificates

8

Site visit report and certificate from site authorities

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid for retrofitting 36 kV vacuum breaker in Kameng Hydro tender in Arunachal Pradesh

Bidders must submit OEM credentials, site survey report, and EMD via SBI Collect. Ensure compliance with ATC sections IV-A/IV-B and III-Contract; provide item-wise price breakup after award, and confirm delivery as per the 25% quantity option with minimum 30 days extension.

What documents are required for the Kameng HV retrofit tender in 2026

Required documents include GST Certificate, PAN, OEM authorization, site visit certificate, experience certificates for HV retrofits, financial statements, EMD proof via SBI Collect, and technical bid documents showing compliance with IS/IEC standards as per ATC.

What are the technical specifications for the 36 kV vacuum breaker retrofit

Specification focuses on replacing a 33 kV SF6 CB with a 36 kV Vacuum CB at Kameng; OEM credentials and detailed technical sections IV-A/IV-B govern compliance; ensure proper erection and connection per General Conditions of Contract.

When is the delivery timeline for the Kameng Hydro retrofit project

Delivery extension is allowed under the option clause; additional time is calculated as (increased quantity/original quantity) × original delivery period, with a mandatory minimum of 30 days and subject to contract terms.

What are the EMD submission requirements for this tender in Arunachal

EMD must be paid via SBI Collect and documented in the bid; value and percentage will be specified in the ATC; ensure evidence is attached to the technical bid for eligibility.

What standards or OEM requirements are needed for eligibility

Bidders must provide OEM credentials and ensure compliance with the detailed ATC; adherence to Section IV-A/IV-B and General Terms; certifications for HV equipment and installation are required.

How is the price breakup to be submitted after award

The L1 bidder must submit a detailed item-wise price breakup including basic price, GST, and other charges after contract award per GeM guidelines and ATC requirements.

What is the scope of site survey and why is it mandatory

Site survey confirms technical feasibility and installation readiness; bidders must submit site survey certificates with the bid and conduct on-site assessment to participate in the tender.