Indian Army Tender for UTP Cable Cat6, 24 Port Switch Digisol, IPC Accessories and Installation 2026
Indian Army
HOSHANGABAD, MADHYA PRADESH
Bid Publish Date
04-Jun-2026, 10:13 am
Bid End Date
22-Jun-2026, 3:00 pm
Value
₹5,16,25,000
Location
Progress
Quantity
278
Category
NDR IB Switch-Un-Managed
Bid Type
Two Packet Bid
Centre For Development Of Advanced Computing (CDAC), under the Department Of Electronics And Information Technology, invites bids for a package including NDR IB Switch-Un-Managed, Splitter cable, Twin port transceiver, Passive fibre cable, and related components along with installation commissioning testing at Bengaluru, Karnataka. Estimated value is ₹51,62,50,000. The scope includes compatibility with existing inventory per ATC and potential 25% quantity adjustments during contract execution. The delivery location is CDAC, Electronics City Phase 1, Bengaluru 560100. No specific technical specs are published in the tender data; however, the awards cover multiple hardware categories and installation work.
Product/service names: NDR IB Switch-Un-Managed; Splitter cable; Twin port transceiver; Passive fibre cable
Quantity/BOQ: 7 items listed; exact quantities not disclosed
Estimated value: ₹51,62,50,000
Delivery location: CDAC, Opp Welingkar Institute, Electronics City Phase 1, Bengaluru 560100
Compatibility: existing system compatibility is mandatory; include/attach hardware or software to ensure compatibility at no extra cost
Invoicing: invoice to be raised in consignee name with consignee GSTIN; GST payment proof required
Option clause allowing ±25% quantity change with corresponding delivery time logic
Delivery and installation to CDAC Bengaluru; last-date delivery timelines and extended period rules
Mandatory compliance: positive OEM net worth; non-liquidation certification; GST invoicing and payment proof
GST paid per actuals or applicable rate; invoice in consignee GSTIN; payment proof via GST portal
Delivery begins from last date of original delivery order; extended period calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not explicitly detailed; adherence to delivery/installation schedule implied by option clause ATC
Positive net worth of OEM as per last audited financial statement
Not under liquidation, court receivership, or bankruptcy
Ability to supply compatible hardware with existing CDAC inventory and provide necessary integration support at no extra cost
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
NDR IB Switch-Un-Managed , Splitter cable , Twin port transceiver , Passive fibre cable , Any other components , Any other charges , Installation commissioning testing etc
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
HOSHANGABAD, MADHYA PRADESH
Indian Army
Employees Provident Fund Organisation (epfo)
MUMBAI, MAHARASHTRA
Controller General Of Defence Accounts
HYDERABAD, TELANGANA
Ntpc Limited
NAGPUR, MAHARASHTRA
Tender Results
Loading results...
NDR IB Switch-Un-Managed
NDR InfiniBand Switch, 64 NDR ports, 32 OSFP ports, 2 Power Supplies (AC), Standard depth, Un-Managed, P2C airflow, Rail Kit
Splitter cable
NVIDIA or equivalent passive copper splitter cable, IB twin port
Twin port transceiver
NVIDIAor equivalent twin port transceive
Passive fibre cable
NVIDIA or equivalent passive fiber cable, MMF, MPO12 APC to MPO12 APC, 30 M
Any other components
Required to complete the solution
Any other charges
Required to complete the solution
Installation commissioning testing etc
Required at site
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | NDR IB Switch-Un-Managed | NDR InfiniBand Switch, 64 NDR ports, 32 OSFP ports, 2 Power Supplies (AC), Standard depth, Un-Managed, P2C airflow, Rail Kit | 5 | nos | vinayaks | 120 | |
| 2 | Splitter cable | NVIDIA or equivalent passive copper splitter cable, IB twin port | 80 | nos | vinayaks | 120 | |
| 3 | Twin port transceiver | NVIDIAor equivalent twin port transceive | 95 | nos | vinayaks | 120 | |
| 4 | Passive fibre cable | NVIDIA or equivalent passive fiber cable, MMF, MPO12 APC to MPO12 APC, 30 M | 95 | nos | vinayaks | 120 | |
| 5 | Any other components | Required to complete the solution | 1 | lot | vinayaks | 120 | |
| 6 | Any other charges | Required to complete the solution | 1 | job | vinayaks | 120 | |
| 7 | Installation commissioning testing etc | Required at site | 1 | job | vinayaks | 120 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates of similar deployments
Audited financial statements showing OEM net worth positive
OEM authorization letters (if applicable)
GST portal payment receipts or screenshots
Technical compliance certificates as per ATC
Bid submission undertaking of non-liquidation/bankruptcy
To bid, bidders must submit GST-registered details, PAN, experience certificates, financial statements, and an undertaking that the OEM has positive net worth. Include OEM authorizations if required and ensure invoices are raised to the consignee with GSTIN; GST payable as actual or lower applicable rate.
Submit GST certificate, PAN, last 3 years financial statements, OEM authorization (if applicable), project experience certificates, and GST portal payment receipts. Also provide technical compliance certificates per ATC and an undertaking confirming non-liquidation status.
Delivery and installation must be performed at CDAC, Opp Welingkar Institute, Electronics City Phase 1, 68 Electronics City, Bengaluru, Karnataka 560100. Ensure on-time delivery within the contracted period and coordinate with the CDAC site team for commissioning testing.
Payments align with GST norms; invoice must be GST-compliant and raised in the consignee GSTIN. GST reimbursement will be at actuals or lower applicable rates. The ATC requires GST portal confirmation of payment as part of submission.
The purchaser may increase or decrease quantity up to 25% at contract, with delivery time adjusted using a formula: (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Original and extended timelines govern scheduling.
OEMs must show positive net worth per last audited financials and provide undertaking against liquidation or bankruptcy. Compatibility with existing CDAC inventory is mandatory; if needed, provide extra hardware/software at no extra cost to ensure operability.
The tender lists general product categories; explicit IS/ISO standards are not specified in the data. Bidders should refer to ATC for any required certificates and ensure compliance with applicable government procurement norms and GST documentation.
Installation commissioning testing is included in the scope of supply as per tender terms. Ensure readiness for on-site testing at Bengaluru location after delivery, with all components verified for interoperability with existing CDAC systems.
Indian Navy
📍 ERNAKULAM, KERALA
Indian Institute Of Mass Communication (iimc)
📍 SOUTH DELHI, DELHI
Indian Army
📍 AMRITSAR, PUNJAB
Bharat Electronics Limited (bel)
📍 GHAZIABAD, UTTAR PRADESH
Indian Navy
Sign up now to access all documents
Main Document
BOQ
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS