TenderDekho Logo
Active GEM

Invitation to Bid - L2 Managed Switch 24 x 10 obliq 100 obliq 1000 Baset 4 x 10G SFP Ports Managed Switch,Fiber Switch in SRINAGAR, JAMMU & KASHMIR

Bid Publish Date

21-Sep-2026, 12:40 pm

Bid End Date

12-Oct-2026, 1:00 pm

Location

SRINAGAR , JAMMU & KASHMIR

Progress

Issue21-Sep-2026, 12:40 pm
AwardPending

Indian Army invites bids for L2 Managed Switch 24 x 10 obliq 100 obliq 1000 Baset 4 x 10G SFP Ports Managed Switch, Fiber Switch L2 Aggregate 24 Port 10G with 25G Uplink, 10G Core Switch 24 x 10G SFP Ports and 4 x 25 G QSFP28 Ports Layer 3 Managed Switch, Firewall 100 User and HA Mode, 10G SFP Transceiver SR obliq LR Module, Computer Workstation Core i9 32 BG DDR5 RAM 1 TB SSD, SMF 24 Core OFC 24 Core, Solid Cable Cat 64 Pair UTP LSZH 305 Mtr, Patch Panel UTP Server End 12 Port, Patch Panel UTP Client End 12 Port, Fiber DP SMF 48 Port Server End Fiber Distribution Panel, Fiber DP SMF 6F Port Rack End Fiber Termination Panel, Patch Cord 1M SMF, Patch Cord 2M SMF, Patch Cord 3M SMF, IO Box Set, 6U Rack, PVC Conduit 38. 5 mm Backbone, PVC Conduit 12. 5 mm User End, Flex Conduit 38. 5 mm Stainless Steel, Flex Conduit 12. 5 mm Stainless Steel, PVC Tie obliq Clips PVC Routing Accessories, 2 Core 4 mm Wire Centralised Power Cable, PDU 3 Pin Socket Rack Mounted and Wall Mounted, AC 2 Ton Split Hot and Cold Dual inverter tech with Stablizer and installation, Biometric Device Air Face - Mars, UPS 1 KVA inbuilt Battery, UPS 10 KVA with Battery Bank, OFC 6 Core, Splicing Machine, RJ 45 Keystone Jack, Face Plate, RJ 45 Connector, LED Panel 75 inch with wall mount, 42 U Intelligent Smart Rack, Roof Fan Tray, Installation and Commissioning Work in SRINAGAR, JAMMU & KASHMIR. Quantity: 17931. Submission Deadline: 12-10-2026 13: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

17931

Category

L2 Managed Switch 24 x 10 obliq 100 obliq 1000 Baset 4 x 10G SFP Ports Managed Switch

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Warranty Period

5 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

L2 Managed Switch 24 x 10 obliq 100 obliq 1000 Baset 4 x 10G SFP Ports Managed Switch , Fiber Switch L2 Aggregate 24 Port 10G with 25G Uplink , 10G Core Switch 24 x 10G SFP Ports and 4 x 25 G QSFP28 Ports Layer 3 Managed Switch , Firewall 100 User and HA Mode , 10G SFP Transceiver SR obliq LR Module , Computer Workstation Core i9 32 BG DDR5 RAM 1 TB SSD , SMF 24 Core OFC 24 Core , Solid Cable Cat 64 Pair UTP LSZH 305 Mtr , Patch Panel UTP Server End 12 Port , Patch Panel UTP Client End 12 Port , Fiber DP SMF 48 Port Server End Fiber Distribution Panel , Fiber DP SMF 6F Port Rack End Fiber Termination Panel , Patch Cord 1M SMF , Patch Cord 2M SMF , Patch Cord 3M SMF , IO Box Set , 6U Rack , PVC Conduit 38.5 mm Backbone , PVC Conduit 12.5 mm User End , Flex Conduit 38.5 mm Stainless Steel , Flex Conduit 12.5 mm Stainless Steel , PVC Tie obliq Clips PVC Routing Accessories , 2 Core 4 mm Wire Centralised Power Cable , PDU 3 Pin Socket Rack Mounted and Wall Mounted , AC 2 Ton Split Hot and Cold Dual inverter tech with Stablizer and installation , Biometric Device Air Face - Mars , UPS 1 KVA inbuilt Battery , UPS 10 KVA with Battery Bank , OFC 6 Core , Splicing Machine , RJ 45 Keystone Jack , Face Plate , RJ 45 Connector , LED Panel 75 inch with wall mount , 42 U Intelligent Smart Rack , Roof Fan Tray , Installation and Commissioning Work

Advisory Bank

PUNJAB NATIONAL BANK

ePBG Percentage

3%

ePBG Duration (Months)

39

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Srinagar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SrinagarSrinagar--1245-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9800782.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 37 Items Sign in for GEM prices

#1

L2 Managed Switch 24 x 10 obliq 100 obliq 1000 Baset 4 x 10G SFP Ports Managed Switch

L2 Managed Switch 24 x 10 obliq 100 obliq 1000 Baset 4 x 10G SFP Ports Managed Switch

12 pieces Delivery: 45 days
#2

Fiber Switch L2 Aggregate 24 Port 10G with 25G Uplink

Fiber Switch L2 Aggregate 24 Port 10G with 25G Uplink

1 pieces Delivery: 45 days
#3

10G Core Switch 24 x 10G SFP Ports and 4 x 25 G QSFP28 Ports Layer 3 Managed Switch

10G Core Switch 24 x 10G SFP Ports and 4 x 25 G QSFP28 Ports Layer 3 Managed Switch

2 pieces Delivery: 45 days
#4

Firewall 100 User and HA Mode

Firewall 100 User and HA Mode

6 pieces Delivery: 45 days
#5

10G SFP Transceiver SR obliq LR Module

10G SFP Transceiver SR obliq LR Module

24 pieces Delivery: 45 days
#6

Computer Workstation Core i9 32 BG DDR5 RAM 1 TB SSD

Computer Workstation Core i9 32 BG DDR5 RAM 1 TB SSD

7 pieces Delivery: 45 days
#7

SMF 24 Core OFC 24 Core

SMF 24 Core OFC 24 Core

500 meter Delivery: 45 days
#8

Solid Cable Cat 64 Pair UTP LSZH 305 Mtr

Solid Cable Cat 64 Pair UTP LSZH 305 Mtr

4,000 meter Delivery: 45 days
#9

Patch Panel UTP Server End 12 Port

Patch Panel UTP Server End 12 Port

1 pieces Delivery: 45 days
#10

Patch Panel UTP Client End 12 Port

Patch Panel UTP Client End 12 Port

12 pieces Delivery: 45 days
#11

Fiber DP SMF 48 Port Server End Fiber Distribution Panel

Fiber DP SMF 48 Port Server End Fiber Distribution Panel

1 pieces Delivery: 45 days
#12

Fiber DP SMF 6F Port Rack End Fiber Termination Panel

Fiber DP SMF 6F Port Rack End Fiber Termination Panel

12 pieces Delivery: 45 days
#13

Patch Cord 1M SMF

Patch Cord 1M SMF

45 pieces Delivery: 45 days
#14

Patch Cord 2M SMF

Patch Cord 2M SMF

48 pieces Delivery: 45 days
#15

Patch Cord 3M SMF

Patch Cord 3M SMF

16 pieces Delivery: 45 days
#16

IO Box Set

IO Box Set

80 pieces Delivery: 45 days
#17

6U Rack

6U Rack

12 pieces Delivery: 45 days
#18

PVC Conduit 38.5 mm Backbone

PVC Conduit 38.5 mm Backbone

800 meter Delivery: 45 days
#19

PVC Conduit 12.5 mm User End

PVC Conduit 12.5 mm User End

1,500 meter Delivery: 45 days
#20

Flex Conduit 38.5 mm Stainless Steel

Flex Conduit 38.5 mm Stainless Steel

100 meter Delivery: 45 days
#21

Flex Conduit 12.5 mm Stainless Steel

Flex Conduit 12.5 mm Stainless Steel

50 meter Delivery: 45 days
#22

PVC Tie obliq Clips PVC Routing Accessories

PVC Tie obliq Clips PVC Routing Accessories

15 pieces Delivery: 45 days
#23

2 Core 4 mm Wire Centralised Power Cable

2 Core 4 mm Wire Centralised Power Cable

400 meter Delivery: 45 days
#24

PDU 3 Pin Socket Rack Mounted and Wall Mounted

PDU 3 Pin Socket Rack Mounted and Wall Mounted

13 pieces Delivery: 45 days
#25

AC 2 Ton Split Hot and Cold Dual inverter tech with Stablizer and installation

AC 2 Ton Split Hot and Cold Dual inverter tech with Stablizer and installation

2 pieces Delivery: 45 days
#26

Biometric Device Air Face - Mars

Biometric Device Air Face - Mars

4 pieces Delivery: 45 days
#27

UPS 1 KVA inbuilt Battery

UPS 1 KVA inbuilt Bty

12 pieces Delivery: 45 days
#28

UPS 10 KVA with Battery Bank

UPS 10 KVA with Battery Bank

1 pieces Delivery: 45 days
#29

OFC 6 Core

OFC 6 Core

4,000 meter Delivery: 45 days
#30

Splicing Machine

Splicing Machine

1 pieces Delivery: 45 days
#31

RJ 45 Keystone Jack

RJ 45 Keystone Jack

150 pieces Delivery: 45 days
#32

Face Plate

Face Plate

100 pieces Delivery: 45 days
#33

RJ 45 Connector

RJ 45 Connector

6,000 pieces Delivery: 45 days
#34

LED Panel 75 inch with wall mount

LED Panel 75 inch with wall mount

1 pieces Delivery: 45 days
#35

42 U Intelligent Smart Rack

42 U Intelligent Smart Rack

1 pieces Delivery: 45 days
#36

Roof Fan Tray

Roof Fan Tray

1 pieces Delivery: 45 days
#37

Installation and Commissioning Work

Installation and Commissioning Work

1 job Delivery: 45 days

Categories 63

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer