Bid Publish Date
07-Aug-2026, 11:25 am
Bid End Date
24-Aug-2026, 10:00 am
EMD
₹16,40,000
Location
Progress
N/a has released a public tender for Smartphones (V3) (Q2), Active LED Video Wall, Standby Power Backup System with AMF, Uninterrupted Power Backup System, Managed Distribution Switches, Managed Uplink Switches in GUNTUR, ANDHRA PRADESH. Quantity: 2111. Submission Deadline: 24-08-2026 10: 00: 00. Download documents and apply online.
Quantity
2111
Category
Smartphones (V3)
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
410
OEM Avg. Turnover
1640
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Smartphones (V3) (Q2) , Active LED Video Wall , Standby Power Backup System with AMF , Uninterrupted Power Backup System , Managed Distribution Switches , Managed Uplink Switches
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
39
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Guntur
Delivery Pincodes
522503
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Gurugubelli Ravi Kiran | 522503,O/o DEPUTY INSPECTOR GENERAL OF POLICE (TECHNICAL SERVICES) , ANDHRA PRADESH POLICE TECH TOWERS, Andhra Pradesh , MANGALAGIRI | Guntur | Andhra Pradesh | 522503 | 2100 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Active LED Video Wall
Monitoring the command controloprations and MDTs movment
Standby Power Backup System with AMF
60 KVA generator and auto mains failure panel for uninterrupted emergency operations
Uninterrupted Power Backup System
40 KVA online UPS with battery backup for zero-downtime operations
Managed Distribution Switches
Layer 3 managed PoE switches for floor-wide network distribution
Managed Uplink Switches
Layer 2 Switches for sub-segment uplink connectivity
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Active LED Video Wall | Monitoring the command controloprations and MDTs movment | 1 | pieces | supdt.pcs | 45 | |
| 2 | Standby Power Backup System with AMF | 60 KVA generator and auto mains failure panel for uninterrupted emergency operations | 1 | pieces | supdt.pcs | 45 | |
| 3 | Uninterrupted Power Backup System | 40 KVA online UPS with battery backup for zero-downtime operations | 1 | pieces | supdt.pcs | 45 | |
| 4 | Managed Distribution Switches | Layer 3 managed PoE switches for floor-wide network distribution | 4 | pieces | supdt.pcs | 45 | |
| 5 | Managed Uplink Switches | Layer 2 Switches for sub-segment uplink connectivity | 4 | pieces | supdt.pcs | 45 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer