TenderDekho Logo
Closed GEM

Bids are Invited For PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finol in JAISALMER, RAJASTHAN

Bid Publish Date

10-Aug-2026, 2:35 pm

Bid End Date

25-Aug-2026, 3:00 pm

EMD

₹45,000

Progress

RA
Issue10-Aug-2026, 2:35 pm
Reverse Auction06-Sep-2026, 7:00 pm
AwardCompleted

Indian Army announces a tender for PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finol in JAISALMER, RAJASTHAN. Quantity: 6882. Submission Deadline: 25-08-2026 15: 00: 00. Last date to apply is approaching fast!

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
BALAJI TRADERS   Under PMA
-25-08-2026 11:01:14
2
HINDUSTAN ENGINEERING WORKS   Under PMA
-24-08-2026 13:26:26
3
MANISHA ASSOCIATES   Under PMA
-21-08-2026 17:51:00
4
PRABHAT TRADERS   Under PMA
-21-08-2026 21:07:29

Financial Results

Rank Seller Price Item
L1
MANISHA ASSOCIATES(MSE,MII)( MSE Social Category:SC )    Under PMA
Item Categories : PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finol
L2
PRABHAT TRADERS (MSE,MII)( MSE Social Category:SC )    Under PMA
Item Categories : PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finol
L3
HINDUSTAN ENGINEERING WORKS (MSE,MII)( MSE Social Category:SC )    Under PMA
Item Categories : PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finol

Reverse Auction Schedule

Completed

Start

06-Sep-2026, 7:00 pm

End

07-Sep-2026, 7:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

6882

Category

PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finolex comma Polycab

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

75

OEM Avg. Turnover

15

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

12

Pre-Bid & Qualification

Pre-Bid Date

18-08-2026 13:00:00

Pre-Bid Venue

EPO Office, 21 Engr Regt, TCP-2, Jaisalmer

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Jaisalmer

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JaisalmerJaisalmer--154045-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT
Advertisement

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9734036.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 75 Items Sign in for GEM prices

#1

PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finolex comma Polycab

PVC FRLS copper cable insulated multi strands 1 point 0 Sq mm Make Anchor comma Havells comma Finolex comma Polycab

1,540 rm Delivery: 45 days
#2

PVC FRLS copper cable insulated multi strands 1 point 5 Sq mm Make Anchor comma Havells comma Finolex comma Polycab

PVC FRLS copper cable insulated multi strands 1 point 5 Sq mm Make Anchor comma Havells comma Finolex comma Polycab

1,640 rm Delivery: 45 days
#3

PVC Armoured cable 16 sqmm 2 core Make Havells comma Finolex comma Polycab

PVC Armoured cable 16 sqmm 2 core Make Havells comma Finolex comma Polycab

250 rm Delivery: 45 days
#4

PVC FRLS copper cable insulated, multi strands 2 point 5 Sq mm Make Anchor comma Havells comma Finolex comma Polycab

PVC FRLS copper cable insulated, multi strands 2 point 5 Sq mm Make Anchor comma Havells comma Finolex comma Polycab

1,220 rm Delivery: 45 days
#5

LED Bulb 15 watt Make Philips comma Anchor comma Bajaj

LED Bulb 15 watt Make Philips comma Anchor comma Bajaj

140 nos Delivery: 45 days
#6

PVC capping comma casing 25 mm with accessories Make Bajaj comma Philips comma Siemens comma Anchor comma with Equivalent ISI Marked

PVC capping comma casing 25 mm with accessories Make Bajaj comma Philips comma Siemens comma Anchor comma with Equivalent ISI Marked

100 nos Delivery: 45 days
#7

PVC Insulation tape 15mmx10 Mtr make Steel grip comma Presto plast comma faxwel

PVC Insulation tape 15mmx10 Mtr make Steel grip comma Presto plast comma faxwel

46 roll Delivery: 45 days
#8

Electronic type fan regulator 1M fan Make Bajaj comma Crompton comma Philips comma Anchor

Electronic type fan regulator 1M fan Make Bajaj comma Crompton comma Philips comma Anchor

13 nos Delivery: 45 days
#9

Switch 5 Amp modular type Make Bajaj comma Philips comma Siemens comma Anchor comma with Equivalent ISI Marked

Switch 5 Amp modular type Make Bajaj comma Philips comma Siemens comma Anchor comma with Equivalent ISI Marked

106 nos Delivery: 45 days
#10

Socket 5 Amp modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked

Socket 5 Amp modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked

37 nos Delivery: 45 days
#11

PVC Gang Box with plate 3 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor comma with Equivalent ISI Marked as approved by consignee

PVC Gang Box with plate 3 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor comma with Equivalent ISI Marked as approved by consignee

31 nos Delivery: 45 days
#12

PVC Gang Box with plate 4 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked as approved by consignee

PVC Gang Box with plate 4 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked as approved by consignee

20 nos Delivery: 45 days
#13

PVC Gang Box with plate 5 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked as approved by consignee

PVC Gang Box with plate 5 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked as approved by consignee

30 nos Delivery: 45 days
#14

PVC Gang Box with plate 8 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked as approved by consignee

PVC Gang Box with plate 8 Way modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked as approved by consignee

26 nos Delivery: 45 days
#15

Earthing complete set as specification at para 8 of part II of specifiacation All required items to be provided as per the specification

Earthing complete set as specification at para 8 of part II of specifiacation All required items to be provided as per the specification

4 set Delivery: 45 days
#16

Lighthering coducter complete set with all accessories

Lighthering coducter complete set with all accessories

2 set Delivery: 45 days
#17

PVC Armoured cable 16 sqmm 4 core Make Havells comma Finolex comma Polycab

PVC Armoured cable 16 sqmm 4 core Make Havells comma Finolex comma Polycab

200 rm Delivery: 45 days
#18

MCB Box 8 way Make L and T comma Usha comma CG

MCB Box 8 way Make L and T comma Usha comma CG

14 nos Delivery: 45 days
#19

Recess Mounting Light 2 x 2 Make Bajaj comma Crompton comma Philips comma CG

Recess Mounting Light 2 x 2 Make Bajaj comma Crompton comma Philips comma CG

16 nos Delivery: 45 days
#20

Ceiling fan 1200 mm sweep Make Bajaj Usha comma CG comma Khaitan

Ceiling fan 1200 mm sweep Make Bajaj Usha comma CG comma Khaitan

46 nos Delivery: 45 days
#21

MS hook 12mm rod for fan

MS hook 12mm rod for fan

15 nos Delivery: 45 days
#22

LED Tube light 20 watt 4ft complete Make Bajaj comma Usha

LED Tube light 20 watt 4ft complete Make Bajaj comma Usha

122 nos Delivery: 45 days
#23

LED Bulb 10 watt Make Philips comma Anchor comma Bajaj

LED Bulb 10 watt Make Philips comma Anchor comma Bajaj

129 nos Delivery: 45 days
#24

Exhaust fan 300 mm Make Philips comma Anchor comma Bajaj

Exhaust fan 300 mm Make Philips comma Anchor comma Bajaj

22 nos Delivery: 45 days
#25

MCB 63 Amp Make Philips comma Anchor comma Bajaj

MCB 63 Amp Make Philips comma Anchor comma Bajaj

21 nos Delivery: 45 days
#26

MCB 40 Amp Make Philips comma Anchor comma Bajaj

MCB 40 Amp Make Philips comma Anchor comma Bajaj

13 nos Delivery: 45 days
#27

MCB 5 to 30 Amp Make Philips comma Anchor comma Bajaj

MCB 5 to 30 Amp Make Philips comma Anchor comma Bajaj

93 nos Delivery: 45 days
#28

MCB 16 Amp Make Philips comma Anchor comma Bajaj

MCB 16 Amp Make Philips comma Anchor comma Bajaj

22 nos Delivery: 45 days
#29

Cooler Motor 6100 RPM Desert Cooler 450 MM Make Philips comma Usha comma Bajaj

Cooler Motor 6100 RPM Desert Cooler 450 MM Make Philips comma Usha comma Bajaj

24 nos Delivery: 45 days
#30

Desert Cooler Motor Make Philips comma Usha comma Bajaj

Desert Cooler Motor Make Philips comma Usha comma Bajaj

21 nos Delivery: 45 days
#31

Desert Cooler Water Pump Make Philips comma Usha comma Bajaj

Desert Cooler Water Pump Make Philips comma Usha comma Bajaj

34 nos Delivery: 45 days
#32

Ceiling rose

Ceiling rose

30 nos Delivery: 45 days
#33

PVC Cable XLPE 25 sqmm 4 core Make Havells comma Finolex comma Polycab

PVC Cable XLPE 25 sqmm 4 core Make Havells comma Finolex comma Polycab

380 rm Delivery: 45 days
#34

LED Tube light fitting 10 watt 2ft complete Make Bajaj comma Usha

LED Tube light fitting 10 watt 2ft complete Make Bajaj comma Usha

20 nos Delivery: 45 days
#35

Switch socket combination 15 Amp Make Anchor comma Bajaj

Switch socket combination 15 Amp Make Anchor comma Bajaj

36 nos Delivery: 45 days
#36

Switch socket combination 5 Amp Make Anchor comma Bajaj

Switch socket combination 5 Amp Make Anchor comma Bajaj

32 nos Delivery: 45 days
#37

Desert Cooler 6100RPM Make Philips comma Usha comma Bajaj

Desert Cooler 6100RPM Make Philips comma Usha comma Bajaj

6 nos Delivery: 45 days
#38

Switch 15 Amp modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked

Switch 15 Amp modular type Make Bajaj comma Philips comma Siemens comma Anchor with Equivalent ISI Marked

13 nos Delivery: 45 days
#39

Bulk head fitting Make Philips comma Bajaj

Bulk head fitting Make Philips comma Bajaj

4 nos Delivery: 45 days
#40

PVC Swithc board 7 inch x 4 inch Make Anchor comma Bajaj

PVC Swithc board 7 inch x 4 inch Make Anchor comma Bajaj

16 nos Delivery: 45 days
#41

PVC Swithc board 10 inch x 4 inch Make Anchor comma Bajaj

PVC Swithc board 10 inch x 4 inch Make Anchor comma Bajaj

30 nos Delivery: 45 days
#42

Socket 15 Amp Make Anchor comma Bajaj

Socket 15 Amp Make Anchor comma Bajaj

13 nos Delivery: 45 days
#43

Flood light 100W Make Philips comma Bajaj

Flood light 100W Make Philips comma Bajaj

11 nos Delivery: 45 days
#44

Security light 100W Make Philips comma Bajaj

Security light 100W Make Philips comma Bajaj

4 nos Delivery: 45 days
#45

RO membrane for 1000LPH Make Adelino comma Leo comma CG comma Kirloskar

RO membrane for 1000LPH Make Adelino comma Leo comma CG comma Kirloskar

4 nos Delivery: 45 days
#46

Fuel filter for 62 point 5 KVA Make Kirloskar

Fuel filter for 62 point 5 KVA Make Kirloskar

14 nos Delivery: 45 days
#47

Oil filter for 62 point 5 KVA Make Kirloskar

Oil filter for 62 point 5 KVA Make Kirloskar

12 nos Delivery: 45 days
#48

Fan belt for 62 point 5 KVA Make Kirloskar

Fan belt for 62 point 5 KVA Make Kirloskar

15 nos Delivery: 45 days
#49

Oil temp guage for 62 point 5 KVA Make Kirloskar

Oil temp guage for 62 point 5 KVA Make Kirloskar

4 nos Delivery: 45 days
#50

Oil pressuer guage for 62 point 5 KVA Make Kirloskar

Oil pressuer guage for 62 point 5 KVA Make Kirloskar

4 nos Delivery: 45 days
#51

Exhaust fan for 62 point 5 KVA Make Kirloskar

Exhaust fan for 62 point 5 KVA Make Kirloskar

3 nos Delivery: 45 days
#52

Fuel Guage for 62 point 5 KVA Make Kirloskar

Fuel Guage for 62 point 5 KVA Make Kirloskar

10 nos Delivery: 45 days
#53

Battery 12 V150 AH Make Exide comma Amaron

Battery 12 V150 AH Make Exide comma Amaron

2 nos Delivery: 45 days
#54

Engine Oil Make castrol

Engine Oil Make castrol

140 ltr Delivery: 45 days
#55

Fuel filter for 30 KVA Make Kirloskar

Fuel filter for 30 KVA Make Kirloskar

8 nos Delivery: 45 days
#56

Oil filter for 30 KVA Make Kirloskar

Oil filter for 30 KVA Make Kirloskar

10 nos Delivery: 45 days
#57

Fan belt for 30 KVA Make Kirloskar

Fan belt for 30 KVA Make Kirloskar

8 nos Delivery: 45 days
#58

Air filter paper type for 30 KVA Make Kirloskar

Air filter paper type for 30 KVA Make Kirloskar

4 nos Delivery: 45 days
#59

Exhaust fan for 62 point 5 KVA Make Kirloskar

Exhaust fan for 62 point 5 KVA Make Kirloskar

1 nos Delivery: 45 days
#60

Battery 12 V150 AH Make Exide comma Amaron

Battery 12 V150 AH Make Exide comma Amaron

4 nos Delivery: 45 days
#61

Panel Box Repair Make Kirloskar

Panel Box Repair Make Kirloskar

1 nos Delivery: 45 days
#62

Alternator Winding 62 point 5KVA Make Kirloskar

Alternator Winding 62 point 5KVA Make Kirloskar

1 nos Delivery: 45 days
#63

Router Winding 62 point 5KVA Make Kirloskar

Router Winding 62 point 5KVA Make Kirloskar

1 nos Delivery: 45 days
#64

Excider Winding 62 point 5KVA Make Kirloskar

Excider Winding 62 point 5KVA Make Kirloskar

1 nos Delivery: 45 days
#65

AVR Card Make Kirloskar

AVR Card Make Kirloskar

4 nos Delivery: 45 days
#66

Diode Make Kirloskar

Diode Make Kirloskar

16 nos Delivery: 45 days
#67

Starter Motor Repair Make Kirloskar

Starter Motor Repair Make Kirloskar

2 nos Delivery: 45 days
#68

Flywheel Ring Gear Make Kirloskar

Flywheel Ring Gear Make Kirloskar

4 nos Delivery: 45 days
#69

Fuel pipe Make Kirloskar

Fuel pipe Make Kirloskar

2 nos Delivery: 45 days
#70

Alternator Winding 30KVA Make Kirloskar

Alternator Winding 30KVA Make Kirloskar

1 nos Delivery: 45 days
#71

Rotor Winding 30KVA Make Kirloskar

Rotor Winding 30KVA Make Kirloskar

1 nos Delivery: 45 days
#72

Exciter Winding 30KVA Make Kirloskar

Exciter Winding 30KVA Make Kirloskar

2 nos Delivery: 45 days
#73

Change over switch 100Amp Make Anchor Bajaj Usha

Change over switch 100Amp Make Anchor Bajaj Usha

3 nos Delivery: 45 days
#74

Submersible Pump Rewinding

Submersible Pump Rewinding

1 nos Delivery: 45 days
#75

Change over switch 64Amp Make Ancho Bajaj Usha

Change over switch 64Amp Make Ancho Bajaj Usha

7 nos Delivery: 45 days

Categories 103

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement