Bid Publish Date
29-Jan-2025, 12:58 pm
Bid End Date
22-Feb-2025, 9:00 am
Location
Progress
Quantity
28
Category
Opening dismantling of Suspension Work repair with replacement of following parts and refitting testing complete Veh BA No 20C 108298Y Suspension Bush kit
Bid Type
Two Packet Bid
Indian Army has released a public tender for Opening dismantling of Suspension Work repair with replacement of following parts and refitting testing complete Veh BA No 20C 108298Y Suspension Bush kit, Rear Road spring bush, Front Shock absorber, U Clamp with nut bolt, Rear Halper road spring, Opening dismantling of Engine repair with replacement of following parts and refitting testing complete Decarburising Gasket subkit, Kit Gasket Engine overhaul, Engin overhaul seal subkit, Inlet Valve 60 Deg BS1 or 2 or3 or 4, Valve Exhaust EuroIII, Valve Seat, Valve Guide, Cylinder Liner 4SP BS III, Set piston wo ring BS4, Set piston ring 3 CR4 BS2 by 4, M and L for wheel balancing and allignment of veh as per OEM instruction all as directed, Tools and Labour only for replacement of above supply material in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 28. Submission Deadline: 22-02-2025 09: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Opening dismantling of Suspension Work repair with replacement of following parts and refitting testing complete Veh BA No 20C 108298Y Suspension Bush kit , Rear Road spring bush , Front Shock absorber , U Clamp with nut bolt , Rear Halper road spring , Opening dismantling of Engine repair with replacement of following parts and refitting testing complete Decarburising Gasket subkit , Kit Gasket Engine overhaul , Engin overhaul seal subkit , Inlet Valve 60 Deg BS1 or 2 or3 or 4 , Valve Exhaust EuroIII , Valve Seat , Valve Guide , Cylinder Liner 4SP BS III , Set piston wo ring BS4 , Set piston ring 3 CR4 BS2 by 4 , M and L for wheel balancing and allignment of veh as per OEM instruction all as directed , Tools and Labour only for replacement of above supply material
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Opening dismantling of Suspension Work repair with replacement of following parts and refitting testing complete Veh BA No 20C 108298Y Suspension Bush kit
Opening dismantling of Suspension Work repair with replacement of following parts and refitting testing complete Veh BA No 20C 108298Y Suspension Bush kit
Rear Road spring bush
Rear Road spring bush
Front Shock absorber
Front Shock absorber
U Clamp with nut bolt
U Clamp with nut bolt
Rear Halper road spring
Rear Halper road spring
Opening dismantling of Engine repair with replacement of following parts and refitting testing complete Decarburising Gasket subkit
Opening dismantling of Engine repair with replacement of following parts and refitting testing complete Decarburising Gasket subkit
Kit Gasket Engine overhaul
Kit Gasket Engine overhaul
Engin overhaul seal subkit
Engin overhaul seal subkit
Inlet Valve 60 Deg BS1 or 2 or3 or 4
Inlet Valve 60 Deg BS1 or 2 or3 or 4
Valve Exhaust EuroIII
Valve Exhaust EuroIII
Valve Seat
Valve Seat
Valve Guide
Valve Guide
Cylinder Liner 4SP BS III
Cylinder Liner 4SP BS III
Set piston wo ring BS4
Set piston wo ring BS4
Set piston ring 3 CR4 BS2 by 4
Set piston ring 3 CR4 BS2 by 4
M and L for wheel balancing and allignment of veh as per OEM instruction all as directed
M and L for wheel balancing and allignment of veh as per OEM instruction all as directed
Tools and Labour only for replacement of above supply material
Tools and Labour only for replacement of above supply material
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Opening dismantling of Suspension Work repair with replacement of following parts and refitting testing complete Veh BA No 20C 108298Y Suspension Bush kit | Opening dismantling of Suspension Work repair with replacement of following parts and refitting testing complete Veh BA No 20C 108298Y Suspension Bush kit | 1 | set | nbconsignee | 45 | |
| 2 | Rear Road spring bush | Rear Road spring bush | 1 | set | nbconsignee | 45 | |
| 3 | Front Shock absorber | Front Shock absorber | 2 | nos | nbconsignee | 45 | |
| 4 | U Clamp with nut bolt | U Clamp with nut bolt | 2 | nos | nbconsignee | 45 | |
| 5 | Rear Halper road spring | Rear Halper road spring | 1 | no | nbconsignee | 45 | |
| 6 | Opening dismantling of Engine repair with replacement of following parts and refitting testing complete Decarburising Gasket subkit | Opening dismantling of Engine repair with replacement of following parts and refitting testing complete Decarburising Gasket subkit | 1 | no | nbconsignee | 45 | |
| 7 | Kit Gasket Engine overhaul | Kit Gasket Engine overhaul | 1 | no | nbconsignee | 45 | |
| 8 | Engin overhaul seal subkit | Engin overhaul seal subkit | 1 | no | nbconsignee | 45 | |
| 9 | Inlet Valve 60 Deg BS1 or 2 or3 or 4 | Inlet Valve 60 Deg BS1 or 2 or3 or 4 | 1 | no | nbconsignee | 45 | |
| 10 | Valve Exhaust EuroIII | Valve Exhaust EuroIII | 4 | no | nbconsignee | 45 | |
| 11 | Valve Seat | Valve Seat | 4 | no | nbconsignee | 45 | |
| 12 | Valve Guide | Valve Guide | 1 | no | nbconsignee | 45 | |
| 13 | Cylinder Liner 4SP BS III | Cylinder Liner 4SP BS III | 4 | no | nbconsignee | 45 | |
| 14 | Set piston wo ring BS4 | Set piston wo ring BS4 | 1 | no | nbconsignee | 45 | |
| 15 | Set piston ring 3 CR4 BS2 by 4 | Set piston ring 3 CR4 BS2 by 4 | 1 | no | nbconsignee | 45 | |
| 16 | M and L for wheel balancing and allignment of veh as per OEM instruction all as directed | M and L for wheel balancing and allignment of veh as per OEM instruction all as directed | 1 | job | nbconsignee | 45 | |
| 17 | Tools and Labour only for replacement of above supply material | Tools and Labour only for replacement of above supply material | 1 | job | nbconsignee | 45 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
22-Feb-2025, 9:00 am
Opening Date
22-Feb-2025, 9:30 am
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | N KRISHNA Under PMA | - | 03-02-2025 20:03:17 | |
| 2 | SREE ENTERPRISES Under PMA | - | 05-02-2025 10:31:50 | |
| 3 | Vijayaenterprises Under PMA | - | 05-02-2025 09:17:34 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Vijayaenterprises(MSE)( MSE Social Category:SC ) Under PMA | Item Categories : Opening dismantling of Suspension Work repair with replacement of following parts and refitting tes | |
| L2 | N KRISHNA Under PMA | Item Categories : Opening dismantling of Suspension Work repair with replacement of following parts and refitting tes | |
| L3 | SREE ENTERPRISES Under PMA | Item Categories : Opening dismantling of Suspension Work repair with replacement of following parts and refitting tes |
Key insights about ANDHRA PRADESH tender market
The eligibility requirements include being a registered entity, fulfilling specified experience criteria, and providing necessary documentation such as OEM Authorization and performance certificates. Bidders should demonstrate their capability to execute the scope of work outlined in the tender by providing evidence of past relevant work and meeting the financial stability prerequisites.
Bidders must provide several required certificates, including but not limited to Experience Criteria documentation, Past Performance reports, and OEM Authorization Certificates. This documentation is crucial for validating the bidder's ability to fulfill the tender's technical requirements and to demonstrate compliance with the eligibility criteria stipulated by the Department of Military Affairs.
To participate, interested bidders must complete the registration process on the GEM portal. This involves creating a vendor account, providing requisite details about the organization, and uploading necessary certificates and documents as outlined in the tender. After registration, bidders can access the tender document and submit their proposals.
Proposals must be submitted in the specified accepted document formats, generally including PDFs for technical and financial documents. Adherence to these formats is crucial to ensure that the submitted documents are easily accessible and evaluable by the procurement committee.
Yes, bidders are required to furnish a performance security which typically involves submitting a bank guarantee or a fixed deposit receipt equivalent to a certain percentage of the contract value. This ensures that the bidder is committed to fulfilling the obligations under the contract as stipulated in the tender documentation. Performance security details, as well as the payment terms, will be elaborated within the tender guidelines on the GEM portal.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS