SMPS SYSTEM 48V DC 25A REDUNDANCY,SMPS MODULE 48V DC 25A,SMPS 48V CONTROL UNIT WITH DISPLAY
Bangalore Metro Rail Corporation Limited
BANGALORE, KARNATAKA
Bid Publish Date
05-Apr-2025, 10:33 am
Bid End Date
26-Apr-2025, 11:00 am
Location
Progress
Quantity
14
Category
1. Master Controller Card for TLD Manager Cabinet/ TLD Tracking System
Bid Type
Two Packet Bid
Public procurement opportunity for Nuclear Power Corporation Of India Limited 1. Master Controller Card for TLD Manager Cabinet/ TLD Tracking System, 2. SMPS 12V/2A for Power Supply module for TLD Mager Cabinet/ TLD Tracking System in BULANDSHAHR, UTTAR PRADESH. Quantity: 14 issued by. Submission Deadline: 26-04-2025 11: 00: 00. View full details and respond.
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bangalore Metro Rail Corporation Limited
BANGALORE, KARNATAKA
Indian Army
Ajmer, RAJASTHAN
Indian Army
DARRANG, ASSAM
Controller General Of Defence Accounts
EAST SIANG, ARUNACHAL PRADESH
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | SENERGY INTELLUTION PRIVATE LIMITED Under PMA | Make : Senergy Intellution Model : TLD Master controller Card Title : 1. Master Controller Card for TLD Manager Cabinet/ TLD Tracking System | 24-04-2025 14:49:59 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SENERGY INTELLUTION PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) Under PMA | ₹2,34,584 | Item Categories : 1. Master Controller Card for TLD Manager Cabinet/ TLD Tracking System,2. SMPS 12V/2A for Power Sup |
Key insights about UTTAR PRADESH tender market
The eligibility requirements include being a registered entity within relevant industry classifications, demonstrating a successful track record of supplying electronic components, and ensuring availability of technical support for installations. Organizations must also comply with any additional documentation as stipulated in the tender notice.
Required certificates may include industry compliance certifications, quality assurance standards, and any other documentation that verifies the technical capability of the supplier to meet the tender’s specifications. Compliance with local and international standards related to dosimetry will be essential.
The registration process typically involves submitting an application through the designated procurement platform. Suppliers must provide necessary company details, documentation verifying their eligibility, and any other required certifications to proceed with the procurement process.
Payment terms will be outlined in the tender documents. Typically, these may involve milestone payments based on delivery schedules or a full payment upon successful completion of the delivery and installation process. Bidders must ensure their pricing strategies reflect these terms accurately.
The evaluation and selection process will adhere to a structured method that considers technical compliance, pricing competitiveness, and the supplier's past performance. The Department of Atomic Energy will conduct thorough assessments to ensure that selected bids meet all outlined criteria effectively.
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS