TenderDekho Logo
Closed GEM

Tender Notice for Excavation in trenches not exceeding 1 point 5 metre wide,Returning comma filling in trenches inclu in VADODARA, GUJARAT

Bid Publish Date

13-Aug-2026, 12:44 pm

Bid End Date

24-Aug-2026, 1:00 pm

Progress

Issue13-Aug-2026, 12:44 pm
AwardPending

Indian Army has released a public tender for Excavation in trenches not exceeding 1 point 5 metre wide, Returning comma filling in trenches including spreading, Removal of excavated material and deposited where directed at a distance, Taking down existing cable from site and S and F 95 sqmm 3 core XLPE HT, M and L for sand cushioning to PVC cable with using clean dry and natural, Supplying and Laying un reinforced pre cast flat concrete cable protection, S and F heat shrinkable cable jointing kit for 11KV Earthed grade cable for, Supply and fix GI tubing light for protection of LT cable of size 50 mm dia bore, Taking down carefully transformer 63 KVA from pole oblik plinth by dismantling comma disconnecting HT, M and L for shifting for the transformer mounted on plinth oblik pole from existing location to workshop and vice, M and L HV copper coil replacement per phase as per IS, M and L LV copper coil replacement per phase as per IS, M and L Silica Gel Breather with assembly 01 nos, Rubberised cork sheet gasket of 6mm thickness for top cover of transformer, M and L HV Bushing, M and L LV Bushing, M and L for transformer Oil in VADODARA, GUJARAT. Quantity: 279. Submission Deadline: 24-08-2026 13: 00: 00. Download documents and apply online.

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

279

Category

Excavation in trenches not exceeding 1 point 5 metre wide

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Excavation in trenches not exceeding 1 point 5 metre wide , Returning comma filling in trenches including spreading , Removal of excavated material and deposited where directed at a distance , Taking down existing cable from site and S and F 95 sqmm 3 core XLPE HT , M and L for sand cushioning to PVC cable with using clean dry and natural , Supplying and Laying un reinforced pre cast flat concrete cable protection , S and F heat shrinkable cable jointing kit for 11KV Earthed grade cable for , Supply and fix GI tubing light for protection of LT cable of size 50 mm dia bore , Taking down carefully transformer 63 KVA from pole oblik plinth by dismantling comma disconnecting HT , M and L for shifting for the transformer mounted on plinth oblik pole from existing location to workshop and vice , M and L HV copper coil replacement per phase as per IS , M and L LV copper coil replacement per phase as per IS , M and L Silica Gel Breather with assembly 01 nos , Rubberised cork sheet gasket of 6mm thickness for top cover of transformer , M and L HV Bushing , M and L LV Bushing , M and L for transformer Oil

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Vadodara

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VadodaraVadodara--530-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9626567.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

Excavation in trenches not exceeding 1 point 5 metre wide

Excavation in trenches not exceeding 1 point 5 metre wide and not exceeding 1 point 5 metre in depth for laying oblik taking out of cables CI oblik GI pipe lines and getting out in soft oblik loose soil all as specified and directed

5 cum Delivery: 30 days
#2

Returning comma filling in trenches including spreading

Returning comma filling in trenches including spreading comma leveling watering and well ramming in layers not exceeding 25 cms in soil all as specified and directed by Engineer in Charge

4 cum Delivery: 30 days
#3

Removal of excavated material and deposited where directed at a distance

Removal of excavated material and deposited where directed at a distance not more than 50M from staring point and not more than 1 point 5 metre above ground level

1 cum Delivery: 30 days
#4

Taking down existing cable from site and S and F 95 sqmm 3 core XLPE HT

Taking down existing cable from site and S and F 95 sqmm 3 core XLPE HT cable in trenches oblik fixed on walls oblik poles of passing through pipe comma XLPE insulated comma screened comma PVC bedded comma galvanised steel strip or wire armoured comma electric power cable heavy duty with aluminium conductor comma 11000 volts Earthed comma grade cross sectional area with suitable cable glands all as specified and directed by Engr in Charge

15 rm Delivery: 30 days
#5

M and L for sand cushioning to PVC cable with using clean dry and natural

M and L for sand cushioning to PVC cable with using clean dry and natural river sand gently punning below oblik around cable all as directed by Engineer in Charge

1 cum Delivery: 30 days
#6

Supplying and Laying un reinforced pre cast flat concrete cable protection

Supplying and Laying un reinforced pre cast flat concrete cable protection cover of class HV comma type I comma size 300mm into 40mm comma factory made comma complete all as specified and directed by the Engineer in Charge

83 each Delivery: 30 days
#7

S and F heat shrinkable cable jointing kit for 11KV Earthed grade cable for

S and F heat shrinkable cable jointing kit for 11KV Earthed grade cable for outdoor termination shrink type for 3 core XLPE armoured aluminium conductor cable of size 50sqmm to 95 sqmm

2 each Delivery: 30 days
#8

Supply and fix GI tubing light for protection of LT cable of size 50 mm dia bore

Supply and fix GI tubing light for protection of LT cable of size 50 mm dia bore

3 rm Delivery: 30 days
#9

Taking down carefully transformer 63 KVA from pole oblik plinth by dismantling comma disconnecting HT

Taking down carefully transformer 63 KVA from pole oblik plinth by dismantling comma disconnecting HT and LT sids comma earthling of transformer comma supporting angles oblik cross arms for repair comma opening of top cover comma replacing of all joints oblik types of gaskets HV oblik LV bushings comma LV metal parts breather assembly comma etc and reassembling the same after repairs comma installing comma recommisioning the transformer at its original place comma connecting up HT and LT sides comma earthling and supporting angles oblik cross arms etc and testing

1 each Delivery: 30 days
#10

M and L for shifting for the transformer mounted on plinth oblik pole from existing location to workshop and vice

M and L for shifting for the transformer mounted on plinth oblik pole from existing location to workshop and vice versa including testing comma Reporting and commissioning cost of material paid separately

1 job Delivery: 30 days
#11

M and L HV copper coil replacement per phase as per IS

M and L HV copper coil replacement per phase as per IS

1 each Delivery: 30 days
#12

M and L LV copper coil replacement per phase as per IS

M and L LV copper coil replacement per phase as per IS

1 job Delivery: 30 days
#13

M and L Silica Gel Breather with assembly 01 nos

M and L Silica Gel Breather with assembly 01 nos

1 each Delivery: 30 days
#14

Rubberised cork sheet gasket of 6mm thickness for top cover of transformer

Rubberised cork sheet gasket of 6mm thickness for top cover of transformer

4 each Delivery: 30 days
#15

M and L HV Bushing

M and L HV Bushing

3 each Delivery: 30 days
#16

M and L LV Bushing

M and L LV Bushing

3 sqm Delivery: 30 days
#17

M and L for transformer Oil

M and L for transformer Oil

150 each Delivery: 30 days

Categories 72

Required Documents

1

Experience Criteria

2

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer