TenderDekho Logo
Active GEM

Indian Army Shock Absorber Bushes and Auto Components Tender DODA Jammu & Kashmir 2026

Bid Publish Date

31-Aug-2026, 7:50 pm

Bid End Date

10-Sep-2026, 8:00 pm

Progress

Issue31-Aug-2026, 7:50 pm
AwardPending

Key Highlights

  • Brand/OEM references: TATA Safari parts and Scorpio parts identified in BOQ items
  • Critical items: shock absorber bush front/rear LBPV, ball joints, hex head bolts, needle bearings, wiper blades, fuel filters
  • Delivery flexibility: option to increase/decrease quantity by up to 25% during contract and currency
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate required with bid

Tender Overview

The Indian Army (Department of Military Affairs) invites bids for an auto components package at DODA, Jammu & Kashmir. The procurement covers multiple front-end and rear-end bushings, bolts, bearings, wiper blades, fuel filters, and door lock components for vehicles including TATA Safari and Scorpio. The scope explicitly includes Supply, Installation, Testing and Commissioning of Goods. The BOQ comprises 13 items, though item-wise quantities are not disclosed. Estimated value and EMD are not specified, but the contract contemplates a flexible quantity clause up to +/-25% of bid quantity at contract award and during currency. A vendor code setup and standard bid documents are required, with an emphasis on compliance to delivery terms and end-to-end supply chain readiness.

Technical Specifications & Requirements

  • 13-item BOQ indicating a broad range of automotive components: shock absorber bushes (front/rear LBPV), stab bar bush, drop clamp, ball joint, switch transfer case, hex head bolt, propeller shaft nut bolt, needle bearing (TATA), wiper blade (TATA Safari), fuel filter (TATA Safari), front door lock (Scorpio RH), brake disc pad (rear Scorpio).
  • No technical specifications or IS/ISO standards are listed in the tender data; bidders should infer compatibility with the listed vehicle models and generic automotive hardware requirements.
  • Scope includes Supply, Installation, Testing and Commissioning (S&I&C) of goods; project delivery relies on supplier readiness and after-sales support.

Terms, Conditions & Eligibility

  • Option clause allows +/-25% quantity variation during contract and currency, with delivery extensions calculated by a defined formula and a minimum 30 days.
  • Mandatory bid documents: PAN, GSTIN, cancelled cheque, EFT mandate certified by bank.
  • Scope of supply encompasses complete lifecycle: supply, installation, testing, commissioning, with price inclusive of all components.
  • No explicit EMD amount or payment terms listed; bidders should anticipate standard government procurement practices and provide compliant financials and performance bonds as applicable.
  • No tender ID or dates are disclosed in the data; bidders must rely on the organization’s procurement portal for final procedural specifics.

Key Specifications

  • Product names from BOQ items: shock absorber bush front LBPV, shock absorber bush rear LBPV, stab bar bush front LBPV, drop clamp front LBPV, ball joint lower LBPV, switch transfer case LBPV, hex head bolt LBPV, propeller shaft nut bolt LBPV, needle bearing (TATA), wiper blade TATA Safari, fuel filter TATA Safari, front door lock Scorpio RH, brake disc pad rear Scorpio

  • Delivery: Supply, Installation, Testing and Commissioning (S&I&C) of goods

  • Note: No explicit standards or IS/ISO qualifications listed in tender data

Terms & Conditions

  • EMD not specified in data; bidders should verify on portal

  • Delivery period governed by option clause with +/-25% quantity variation

  • Payment terms not disclosed; submit standard GST-compliant invoices and EFT arrangements

Important Clauses

Payment Terms

No explicit payment terms provided; bidders should align with standard government practice and ensure EFT/payment readiness per contract

Delivery Schedule

Delivery quantity can vary by +/-25%; time extensions calculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified; ensure readiness for standard LD provisions as per government procurement norms

Bidder Eligibility

  • Must provide PAN and GSTIN with bid

  • Must submit EFT Mandate and cancelled cheque

  • Must demonstrate capability to supply S&I&C automotive components for multiple models (TATA Safari, Scorpio)

Tender Data

Bid Details

Quantity

159

Category

Shock absorber bush front LBPV

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Shock absorber bush front LBPV , Shock absorber bush rear LBPV , Stab bar bush front LBPV , Drop clamp front LBPV , Ball joint lower LBPV , Switch transfer case LBPV , Hex head bolt LBPV , Propeller shaft nut bolt LBPV , Needle bearing TATA , Wiper Blade TATA Safari , Fuel filter TATA Safari , Front door lock Scorpio RH , Brake disc pad rear scorpio

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Doda

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DodaDoda--3015-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9827824.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Shock absorber bush front LBPV

Good

30 nos Delivery: 15 days
#2

Shock absorber bush rear LBPV

Good

30 nos Delivery: 15 days
#3

Stab bar bush front LBPV

Good

6 nos Delivery: 15 days
#4

Drop clamp front LBPV

Good

4 nos Delivery: 15 days
#5

Ball joint lower LBPV

Good

2 nos Delivery: 15 days
#6

Switch transfer case LBPV

Good

1 nos Delivery: 15 days
#7

Hex head bolt LBPV

Good

10 nos Delivery: 15 days
#8

Propeller shaft nut bolt LBPV

Good

70 nos Delivery: 15 days
#9

Needle bearing TATA

Good

2 nos Delivery: 15 days
#10

Wiper Blade TATA Safari

Good

1 nos Delivery: 15 days
#11

Fuel filter TATA Safari

Good

1 nos Delivery: 15 days
#12

Front door lock Scorpio RH

Good

1 nos Delivery: 15 days
#13

Brake disc pad rear scorpio

Good

1 nos Delivery: 15 days

Categories 20

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Bidder qualification documents for Vendor Code Creation

6

Technical bid documents (as applicable by organization)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid on the Indian Army auto components tender in DODA JK 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate with the bid. The scope includes supply, installation, testing and commissioning of 13 listed automotive parts for TATA Safari and Scorpio models. Ensure vendor code creation, comply with delivery terms and provide complete technical bid documents to participate.

What documents are required for the DODA auto parts bid 2026 in JK?

Required documents include PAN, GSTIN, cancelled cheque, EFT Mandate certified by bank, and vendor code creation materials. Also provide technical bid, experience certificates, and financial statements as per tender terms to establish eligibility for supply, installation, testing and commissioning.

What are the key components listed for supply in this tender?

Key components include front and rear shock absorber bushes (LBPV), stab bar bush, drop clamp, ball joint, switch transfer case, hex head bolts, propeller shaft nut bolts, needle bearing (TATA), wiper blade (TATA Safari), fuel filter (TATA Safari), front door lock (Scorpio RH) and rear brake disc pad (Scorpio).

What delivery flexibility is allowed for this Indian Army procurement in JK?

The buyer reserves +/-25% quantity variation during contract and currency. Delivery extensions are calculated by a defined formula with a minimum 30 days, starting from the last date of the original or extended delivery period.

Are there any explicit standards or certifications required for this bid?

No explicit standards (IS/ISO) are listed in the data. Bidders should align with standard automotive components quality expectations and provide compliant testing/installation evidence as part of the S&I&C scope.

What is the scope of work for this procurement in JK?

Scope covers Supply, Installation, Testing and Commissioning of 13 automotive parts for vehicle models including TATA Safari and Scorpio, with delivery to DODA, Jammu & Kashmir. The contract emphasizes end-to-end lifecycle involvement from procurement to commissioning.

When will documentation and bid submission be evaluated for eligibility?

Evaluation hinges on submission of PAN, GSTIN, cancelled cheque, EFT Mandate, vendor code and technical bid documents. Ensure all required documents are complete to meet eligibility criteria and avoid disqualification.

What are the payment expectations for successful bidders in JK procurement?

No explicit payment terms are provided in the data. Bidders should anticipate standard practice with GST-compliant invoices, potential EFT payments, and confirm payment milestones in the final contract.