Bid Publish Date
05-Sep-2026, 7:08 pm
Bid End Date
15-Sep-2026, 8:00 pm
Value
₹2,00,900
Location
Progress
Indian Army PROCUREMENT for a 9-item set of Master Heat Solution spare parts, including Electronic Ignitor (Model B155CED, Part No 4111.833), Out Put Filter (Part No 4101.341), Intake Filter (Part No 4101.358), Rotor (Part No 4103.441), Blade (Part No 4101.666), Insert Kit (Part No 4108.635), Flame Output Control (Part No 4104.193), Photocell Sensor (Part No 4110.364), and Motor ¼ HP With Compressor (Part No 4111852). Located in Leh, Jammu & Kashmir with estimated value ₹200,900.00. Contractually, quantity may adjust by up to 25%, with delivery timing anchored to the original schedule. OEM/dealer certification and ISO 9001 compliance are mandatory. Unique model numbers and part codes provide clear BOM for bidder quoting. This tender emphasizes precise Make/Model disclosures and a fall clause to protect pricing.
Master Heat Solution 9-item BOM with Model B155CED and Part Nos 4111.833, 4101.341, 4101.358, 4103.441, 4101.666, 4108.635, 4104.193, 4110.364, 4111852
Delivery clauses permitting 25% quantity variation at contract award and during currency
ISO 9001 certification required; OEM/Authorized dealer certificate mandatory
Fall Clause to ensure pricing is not higher than prices offered to others during contract performance
Minimum delivery time extension rule: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days
Qty adjustment up to 25% at contract and during currency
OEM authorisation and ISO 9001 certification required
Fall Clause applicable to pricing for identical stores
Not explicitly specified; standard procurement norms apply with EMD and payment terms defined in the contract.
Delivery period linked to last date of original delivery order; extended time formula applies for increased quantity with minimum 30 days.
Not specified; contract will include standard terms per procurement guidelines.
Must provide OEM/Authorized dealer certificate
Must hold ISO 9001 quality management certification
Must quote for all 9 BOM items with exact Make/Model and Part Nos
Quantity
113
Category
Electronic Ignitor
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
30 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Electronic Ignitor , Out Put Filter , Intake Filter , Rotor , Blade , Insert Kit , Flame Out put Control , Photocell Sensor , Motor one -Fourth HP With Compressor
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Leh
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Leh | Leh | - | - | 10 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Electronic Ignitor
Electronic Ignitor
Out Put Filter
Out Put Filter
Intake Filter
Intake Filter
Rotor
Rotor
Blade
Blade
Insert Kit
Insert Kit
Flame Out put Control
Flame Out put Control
Photocell Sensor
Photocell Sensor
Motor one -Fourth HP With Compressor
Motor one- Fourth HP With Compressor
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Electronic Ignitor | Electronic Ignitor | 10 | nos | qm6255armdwksp | 30 | |
| 2 | Out Put Filter | Out Put Filter | 10 | nos | qm6255armdwksp | 30 | |
| 3 | Intake Filter | Intake Filter | 10 | nos | qm6255armdwksp | 30 | |
| 4 | Rotor | Rotor | 10 | nos | qm6255armdwksp | 30 | |
| 5 | Blade | Blade | 40 | nos | qm6255armdwksp | 30 | |
| 6 | Insert Kit | Insert Kit | 10 | nos | qm6255armdwksp | 30 | |
| 7 | Flame Out put Control | Flame Out put Control | 10 | nos | qm6255armdwksp | 30 | |
| 8 | Photocell Sensor | Photocell Sensor | 10 | nos | qm6255armdwksp | 30 | |
| 9 | Motor one -Fourth HP With Compressor | Motor one- Fourth HP With Compressor | 3 | nos | qm6255armdwksp | 30 |
Discover companies most likely to bid on this tender
OEM/Authorized dealer certificate
ISO 9001 quality management certificate
Technical bid showing Make/Model for all 9 items
GST registration certificate
PAN card
Experience certificates (if applicable)
Financial statements (as required by tender norms)
Any existing price documents to support the fall clause
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit OEM/Authorized dealer certificates and ISO 9001 certification with the technical bid, quote exact Make/Model for all 9 items (B155CED and associated Part Nos), and ensure compliance with the 25% quantity option. Include GST, PAN, and financials as per terms. Ensure fall clause adherence for pricing.
Submit OEM authorization, ISO 9001 certificate, GST, PAN, and technical bid detailing Make/Model and Part Nos for all items. Include BOM correspondence to 9 listed parts (4111.833, 4101.341, 4101.358, 4103.441, 4101.666, 4108.635, 4104.193, 4110.364, 4111852).
The BOM lists Master Heat Solution items with Model B155CED and nine Part Nos; no additional performance specs provided. Ensure exact part numbers and alignment with the 9 named components to meet procurement requirements.
Delivery timing can extend if quantity increases up to 25% at contract; extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Ensure you plan buffers accordingly.
The fall clause requires pricing for stores to not exceed the lowest price offered to others during contract performance. Bidders must disclose competitive pricing and ensure compliance across all 9 items for the duration of the contract.
Bidders must provide ISO 9001 quality management certification; the certificate should cover quality and safety aspects. Ensure the certificate is valid at submission and accompanies the technical bid, along with OEM authorization.
Estimated value is ₹200,900.00 for a 9-item Master Heat Solution BOM, including Electronic Ignitor, Filters, Rotor, Blade, Insert Kit, Flame Control, Photocell Sensor, and Motor with Compressor, with 25% quantity variation rights.
Provide official OEM authorization letters for each item, matching Make B155CED and Part Nos. Ensure authorizations cover all 9 components and are submitted with the technical bid in the required format.