TenderDekho Logo
Closed GEM

NMDC Limited Gear Pump BH5100 HPU Sibre Tender Dantewada Chhattisgarh 2026

Bid Publish Date

04-Jun-2026, 4:39 pm

Bid End Date

16-Jun-2026, 4:00 pm

Progress

Issue04-Jun-2026, 4:39 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

160

Category

1600832051 Gear Pump BH5100 HPU Sibre

Bid Type

Single Packet Bid

Categories 70

Tender Overview

NMDC Limited invites bids for a procurement package covering multiple BH5100 HPU Sibre components, including gear pump, return filter, coupling, air filter, oil level indicator, valve manifolds, relief valves, pressure gauges, breathers, manifold blocks, suction/relief components, brake parts, hub with bolted disc, and calipers. The location is DANTEWADA, CHHATTISGARH – 494111. The scope references 18 items in the BOQ with no explicit quantitative values published. The contract appears to emphasize compatibility with BH5100 HPU Sibre assemblies and related hydraulic/pneumatic subsystems. A notable differentiator is the explicit option clause allowing quantity variation up to 25% and corresponding delivery-time adjustments, at contracted rates. ATC directs reference to the specification/drawings document for further terms.

Technical Specifications & Requirements

  • Product/Category: Gear Pump BH5100 HPU Sibre, plus associated components (return filter, coupling, air filter, oil level indicator, valve manifolds, relief valves, pressure gauges, air breather/oil port, suction filter, brakes, hub, caliper brakes).
  • Standards/Certifications: Not specified in the available data; ATC requires consultation of the specification document for exact compliance.
  • Quantity/Value: 18 items listed; exact quantities not disclosed in the BOQ details.
  • Delivery/Installation: Delivery window is governed by option clause; minimum delivery flexibility and 30-day minimum extended period if applicable.
  • Contractual Scope: Includes related accessories and assemblies pertinent to BH5100 HPU Sibre systems; terms emphasize adherence to drawings.

Terms, Conditions & Eligibility

  • EMD: Not stated in the publicly available terms; bidders should verify in the T&C documents.
  • Delivery Terms: Option clause permits ±25% quantity variation; delivery period adjusts proportionally, with a minimum 30-day extension rule.
  • Payment: Not detailed in the provided data; refer to ATC for specifics.
  • Documentation: bidders must refer to the Terms & Conditions and ATC for required documents; GST/PAN and experience certificates commonly required in such tenders.
  • Eligibility: Compliance with ATC/specifications and capability to supply multiple BH5100 HPU Sibre components; reference to drawings for technical acceptance.
  • Warranty/Penalties: Not specified in available data; consult the ATC and specification document for penalties or warranty terms.

Key Specifications

    • Product/Category: BH5100 HPU Sibre components (gear pump, return filter, coupling, air filter, oil level indicator, needle/proportional/relief valves, accumulator, pressure gauge, breather, manifold block, suction filter, brake parts, hub with bolted disc, brake caliper)
    • Quantities: 18 total items listed; exact quantities not disclosed
    • Delivery: Option clause enabling up to 25% quantity variation; delivery period scales with additional quantity
    • Standards: Consultation of Specification Document for exact standards (no explicit standards in data)
    • Performance/Quality: Not explicitly stated; to be confirmed via BOQ drawings and ATC
    • OEM/Brand: BH5100 HPU Sibre alignment; no explicit brand requirement beyond BH5100 compatibility

Terms & Conditions

  • Option clause allows ±25% quantity variation at contracted rates

  • Delivery period adjusts proportionally with added quantity, minimum 30 days

  • Delivery extensions may be applied within the original delivery window

  • Refer to specification drawings for technical compliance and ATC terms

Important Clauses

Payment Terms

Not specified in available data; consult ATC/specifications for advance and milestone payments

Delivery Schedule

Delivery window governed by option clause; additional time = (increased quantity / original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not disclosed in available data; check ATC and drawings for LD details

Bidder Eligibility

  • Proven experience supplying BH5100 HPU–related components or similar hydraulic/pneumatic modules

  • Ability to meet delivery timelines with Dantewada, Chhattisgarh logistics

  • Compliant with GST and tax requirements; valid GSTIN and PAN

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

1600832051 Gear Pump BH5100 HPU Sibre , 1600832052 Return filter BH5100 HPU Sibre , 1600832053 Coupling Gear Pump BH5100 HPU Sibre , 1600832054 Air filter BH5100 HPU Sibre , 1600832055 Oil Level Indicator BH5100 HPU Sibre , 1600832056 Check Valve manifold BH5100 HPU Sibre , 1600832057 Needle valve BH5100 HPU Sibre , 1600832638 Proportional Valve BH5100 HPU Sibre , 1600832639 Accumulator BH5100 HPU Sibre , 1600832640 Relief Valve 205 bar BH5100 HPU Sibre , 1600832641 Pressure Gauge BH5100 HPU Sibre , 1600832642 Air Breather or oil port BH5100 HPU Sibre , 1600832643 Manifold Block BH5100 HPU Sibre , 1600832644 Pressure Relief Valve BH5100 HPU Sibre , 1600832645 Suction Filter BH5100 HPU Sibre , 1600383339 Brake Sibre SHI 252 Liners , 1600832646 Hub N1650 with Bolted disc Sibre , 1600383341 Brake Sibre SHI 252 Caliper Brake

Authority Records

MINISTRY OF STEELNATIONAL MINERAL DEVELOPMENT CORPORATION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9422171.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

1600832051 Gear Pump BH5100 HPU Sibre

Gear Pump BH5100 HPU Sibre

5 no Delivery: 120 days
#2

1600832052 Return filter BH5100 HPU Sibre

Return filter BH5100 HPU Sibre

20 no Delivery: 120 days
#3

1600832053 Coupling Gear Pump BH5100 HPU Sibre

Coupling Gear Pump BH5100 HPU Sibre

10 no Delivery: 120 days
#4

1600832054 Air filter BH5100 HPU Sibre

Air filter BH5100 HPU Sibre

20 no Delivery: 120 days
#5

1600832055 Oil Level Indicator BH5100 HPU Sibre

Oil Level Indicator BH5100 HPU Sibre

4 no Delivery: 120 days
#6

1600832056 Check Valve manifold BH5100 HPU Sibre

Check Valve manifold BH5100 HPU Sibre

4 no Delivery: 120 days
#7

1600832057 Needle valve BH5100 HPU Sibre

Needle valve BH5100 HPU Sibre

6 no Delivery: 120 days
#8

1600832638 Proportional Valve BH5100 HPU Sibre

Proportional Valve BH5100 HPU Sibre

6 no Delivery: 120 days
#9

1600832639 Accumulator BH5100 HPU Sibre

Accumulator BH5100 HPU Sibre

4 no Delivery: 120 days
#10

1600832640 Relief Valve 205 bar BH5100 HPU Sibre

Relief Valve 205 bar BH5100 HPU Sibre

6 no Delivery: 120 days
#11

1600832641 Pressure Gauge BH5100 HPU Sibre

Pressure Gauge BH5100 HPU Sibre

8 no Delivery: 120 days
#12

1600832642 Air Breather or oil port BH5100 HPU Sibre

Air Breather or oil port BH5100 HPU Sibre

6 no Delivery: 120 days
#13

1600832643 Manifold Block BH5100 HPU Sibre

Manifold Block BH5100 HPU Sibre

2 no Delivery: 120 days
#14

1600832644 Pressure Relief Valve BH5100 HPU Sibre

Pressure Relief Valve BH5100 HPU Sibre

6 no Delivery: 120 days
#15

1600832645 Suction Filter BH5100 HPU Sibre

Suction Filter BH5100 HPU Sibre

20 no Delivery: 120 days
#16

1600383339 Brake Sibre SHI 252 Liners

Brake Sibre SHI 252 Liners

30 no Delivery: 120 days
#17

1600832646 Hub N1650 with Bolted disc Sibre

Hub N1650 with Bolted disc Sibre

2 no Delivery: 120 days
#18

1600383341 Brake Sibre SHI 252 Caliper Brake

Brake Sibre SHI 252 Caliper Brake

1 no Delivery: 120 days

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar BH5100 HPU Sibre components

4

Financial Statements / Turnover evidence

5

EMD/Security Deposit submission proof

6

Technical Compliance Certificates (if any)

7

OEM Authorizations or Authorized Dealer Certificates

8

Delivery/Installation capability statements

9

Any certifications referenced in ATC or drawings

Financial Results

Rank Seller Price Item
L1
SIBRE BRAKES (INDIA) PRIVATE LIMITED(MSE)( MSE Social Category:General )    Under PMA
Item Categories : 1600832051 Gear Pump BH5100 HPU Sibre,1600832052 Return filter BH5100 HPU Sibre,1600832053 Coupling

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for the BH5100 HPU Sibre components tender in Dantewada

Bidders should review the ATC terms and specification drawings, prepare GST and PAN, collect prior experience certificates for similar hydraulic assemblies, and submit EMD as per the tender terms. Ensure alignment with BH5100 HPU Sibre compatibility and adhere to the 25% variation option with corresponding delivery adjustments.

What documents are required for NMDC Limited gear pump procurement

Submit GST certificate, PAN, experience certificates for BH5100 HPU related work, financial statements, EMD proof, OEM authorizations, and technical compliance certificates. The ATC requires reference to drawings; ensure delivery capability in Dantewada, Chhattisgarh.

What are the delivery terms for quantity variation in this tender

The Purchaser may increase or decrease quantity up to 25% at contract, with delivery time adjusted by (increased quantity/original quantity) × original period, minimum 30 days. Delivery extends within the original window if needed per option clause.

What standards or certifications are required for BH5100 HPU parts

Specific standards are not listed in the data; bidders must refer to the specification document and ATC. Ensure BH5100 HPU Sibre compatibility and obtain any OEM authorizations if required by NMDC Limited.

When is the procurement deadline for the NMDC DVSP gear pump

Exact submission deadlines are not provided in the given data. Bidders should monitor the official procurement portal for NMDC Limited and consult the specification/drawings and ATC for bid submission dates.

What is the EMD amount for the NMDC gear pump tender

EMD amount is not disclosed in the available terms. Prospective bidders must verify the EMD value and payment method from the official Terms and Conditions and bid documents before submission.

What documents confirm eligibility for NMDC Dantewada procurement

Eligibility typically requires GST/PAN, prior related experience certificates, financial documents, OEM authorizations, and technical compliance certifications. Confirm all documents per ATC and ensure delivery ability to Dantewada, Chhattisgarh.

What are the key components included under BH5100 HPU Sibre

The BOQ mentions 18 items including gear pump, return filter, coupling, air filter, oil level indicator, needle/proportional/relief valves, accumulator, pressure gauges, breather, manifold block, suction filter, brake parts, hub with bolted disc, and caliper brakes. Confirm compatibility with BH5100 HPU Sibre systems.