Progress
The procurement is issued by the Indian Army for multiple front-end drivetrain and suspension components located in KOHIMA, NAGALAND. Items include Bush Silent Block Assy, Ball Joint Upper Contra Arm, Propeller Shaft Assy Front 4WD, Bush Stabilizer Bar Frt 4WD, Ball Joint Lower Contra Arm. The BOQ lists 5 total items; exact quantities and unit measures are not disclosed. A sample of the items must be provided at the unit location per requirement, and bidders must comply with a flexible quantity clause allowing up to 25% variation. The contract contemplates delivery terms tied to the original delivery period with potential extensions and enhanced time when options are exercised. GST and OEM certification are mandated as part of ATC terms, underscoring the need for genuineOEM-compliant suppliers. This tender prioritizes standard-compliant, readily verifiable components suitable for military front-end assemblies.
Bush Silent Block Assembly
Ball Joint Upper Control Arm
Ball Joint Lower Control Arm
Propeller Shaft Assembly Front 4WD
Bush Stabilizer Bar Front 4WD
Items to be supplied as per OEM specifications and front-end drivetrain standards
Quantity variation up to 25% during contract and delivery extensions
GST and OEM certificates mandatory for bid eligibility
Sample items must be provided at the unit location for verification
Not explicitly stated; follow standard government procurement payment terms upon delivery and acceptance
Delivery period starts from last date of original delivery order; extensions possible if option is exercised
Not specified in data; follow standard L1/L2 penalties and LD terms per contract during delivery
Must be the OEM or an authorized distributor for Bush Silent Block, Ball Joints, and front 4WD components
Provide GST registration and PAN, along with OEM authorization
Demonstrate capability to supply military-grade front-end assemblies and provide a unit location sample
Quantity
9
Category
Bush Silent Block Assy
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Bush Silent Block Assy , Ball Joint Upper Contr Arm , Propeller Shaft Assy Front 4WD , Bush Stabilizer Bar Frt 4WD , Ball Joint Lower Contr Arm
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Kohima
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Kohima | Kohima | - | - | 2 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Bush Silent Block Assy
Scorpio
Ball Joint Upper Contr Arm
Scorpio
Propeller Shaft Assy Front 4WD
Scorpio
Bush Stabilizer Bar Frt 4WD
Scorpio
Ball Joint Lower Contr Arm
Scorpio
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Bush Silent Block Assy | Scorpio | 2 | nos | buycon1.ina.kohima | 30 | |
| 2 | Ball Joint Upper Contr Arm | Scorpio | 2 | nos | buycon1.ina.kohima | 30 | |
| 3 | Propeller Shaft Assy Front 4WD | Scorpio | 1 | nos | buycon1.ina.kohima | 30 | |
| 4 | Bush Stabilizer Bar Frt 4WD | Scorpio | 2 | nos | buycon1.ina.kohima | 30 | |
| 5 | Ball Joint Lower Contr Arm | Scorpio | 2 | nos | buycon1.ina.kohima | 30 |
Discover companies most likely to bid on this tender
GST Certificate
PAN Card
OEM Certificate
Experience certificates for prior similar supply
Financial statements (as applicable)
Technical bid documents
OEM authorization letters
Sample delivery proof (where required)
Key insights about NAGALAND tender market
Bidders should verify OEM authorization, obtain GST Certificate, submit OEM Certificate, and provide a unit-location sample. The bid allows up to 25% quantity variation and delivery extensions if the option clause is exercised. Ensure samples meet the stated requirements and procure necessary documents before submission.
Required documents include GST Certificate, PAN Card, OEM Certificate, experience certificates, and financial statements. Also submit technical bid documents and OEM authorizations. A sample must be provided at the unit location as per buyer terms. Ensure all documents align with ATC clauses.
The tender lists five items: Bush Silent Block Assembly, Ball Joint Upper and Lower Control Arms, Propeller Shaft Front 4WD, and Bush Stabilizer Bar Front 4WD. Exact dimensional data and material grades are not specified in the data; supplier must provide OEM-compliant items with unit-location samples.
Delivery schedule is tied to the original delivery order with potential extensions if the option clause is exercised. Additional delivery time computes as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days, subject to the contract’s final terms.
Specific payment terms are not stated in the data; bidders should anticipate standard government terms (delivery and acceptance-based payment) and align with contract provisions after sample verification and delivery acceptance.
Submit a valid GST Certificate and OEM Certificate as part of the bid. Ensure OEM authorization covers the exact Bush Silent Block, Ball Joint, and Propeller Shaft front-end assemblies. Maintain documentation for sample submission and any required technical compliance certificates.
Bidders must supply a representative sample of the items to the unit location as per requirement. The sample will be used for verification of OEM accuracy, material quality, and fitment. Ensure packaging, labeling, and accompanying certificates accompany each sample.
The purchaser reserves a variation of up to 25% of the bid quantity at contract placement and during currency. Suppliers should plan manufacturing capacity and buffer stock to accommodate potential changes without price renegotiation.