Progress
Haryana Power Generation Corporation Limited (HPGCL) invites bids for foam concentrate for producing mechanical foam fire fighting (V2) conforming to IS 4989 (Q3) at Panipat, Haryana 132101. The procurement covers foam concentrate with IS 4989 packing, shelf life, and marking requirements. The tender references an option clause allowing ±25% quantity variation at contract placement or during currency, with delivery timeframe adjustments based on the original period and a minimum 30 days extension. There are no BOQ items listed, indicating a single-material or pre-bill scope. This procurement targets reliable supply of compliant foam concentrate to support fire protection for power generation assets in Panipat. The emphasis on IS 4989 compliance and packing/marking per IS clauses highlights quality and traceability expectations for bidders. A key differentiator is the explicit option clause enabling scope adjustments at contracted rates, affecting delivery planning and logistics. Unique aspects include the absence of BOQ items and the inclusion of IS 4989 Clause 5 (packing) and Clause 6.5 (shelf life). Bidders should align to V2 formulation standards and IS 4989 packaging norms to ensure eligibility.
Foam concentrate for mechanical foam fire fighting (V2)
Conformity to IS 4989 (Q3)
Packing as per IS 4989 Clause 5
Shelf life per IS 4989 Clause 6.5
Marking in compliance with IS 4989
Colour, physical and chemical properties unspecified beyond category
Delivery to Panipat, Haryana (PIN 132101)
Option to modify quantity by ±25% at contract award and during currency
Delivery period adjustments based on original period with minimum 30 days
Packing, shelf life, and marking must follow IS 4989
IS 4989 compliance is mandatory for acceptance
BOQ items not listed; material-specific procurement
Payment terms and EMD details are not specified in the data
Not specified in tender data; bidders must obtain terms during clarification and milestone-based payments may apply
Delivery period begins after the last date of the original delivery order; option-based extensions use a formula with minimum 30 days
Not detailed in data; bidders should confirm LD provisions and performance bonds if applicable
Experience supplying IS 4989-compliant foam concentrates or equivalent firefighting chemicals
Registered bidder with GST and valid PAN
Ability to meet delivery to Panipat, Haryana within stipulated periods
Willingness to comply with option clause and IS 4989 packing/marking standards
Quantity
2000
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
5 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
8
OEM Avg. Turnover
1
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
FOAM CONCENTRATE FOR PRODUCING MECHANICAL FOAM FOR FIRE FIGHTING (V2) Conforming to IS 4989 (Q3)
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Panipat
Delivery Pincodes
132105
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rakesh Kumar | 132105,Chief Engineer/PTPS, HPGCL | Panipat | Haryana | 132105 | 2000 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Generic Requirement | Type of Foam Concentrate | AFFF, Type 3 |
| Technical Requirement | Colour | Clear liquid |
| Technical Requirement | Physical and Chemical Requirement | As per Table 1, Clause 4.2 of IS 4989 |
| Technical Requirement | Fire Performance Requirement | As per Table 2, Clause 4.2 of IS 4989 |
| Packing & Marking | Packing (As per clause 5 of IS 4989) | HDPE containers |
| Packing & Marking | Shelf life (As per clause 6.5 of IS 4989) | 10 years |
| Packing & Marking | Marking | As per clause 7 of IS 4989 |
Key insights about HARYANA tender market
To bid, verify IS 4989 (Q3) compliance for foam concentrate, prepare packing/marking details per IS 4989 Clause 5 and 6.5, and confirm delivery to Panipat. Clarify EMD, payment terms, and the ±25% option clause with the buyer. Ensure GST and PAN validation in submission.
Submit GST certificate, PAN, company profile, experience certificates for firefighting chemicals, financial statements, and OEM authorizations if applicable. Include technical compliance proofs for IS 4989 conformance, packing marks, shelf-life data, and delivery capability to Panipat.
Packing must follow IS 4989 Clause 5 with appropriate labeling and batch tracking. Shelf life must be as per Clause 6.5, including expiry dating and storage conditions. Suppliers should provide material safety data sheets and stability certificates to demonstrate conformity.
Delivery period begins after the original delivery date; if quantity is increased, extended time is (additional quantity / original quantity) × original period, with a minimum of 30 days. Exact calendar dates to be confirmed in the purchase order.
EMD details are not disclosed in the data; bidders must seek confirmation. Payment terms are not specified; bidders should obtain terms during clarification and align with standard government practice once defined.
The buyer may modify order quantity by ±25% at contract award or during the currency. Delivery timelines adjust using the stated formula, ensuring a minimum 30 days extension; bidders should factor flexibility into inventory and logistics.
Mandatory standard is IS 4989 for foam concentrate (V2) with packing and shelf-life governed by IS 4989 Clauses 5 and 6.5. Suppliers must demonstrate compliance with these clauses and provide marking as per IS 4989.
No BOQ items are listed; submission centers on a single foam concentrate specification conforming to IS 4989. Prepare technical bid with IS 4989 compliance, packaging, and delivery capabilities; follow standard bidder submission process and ensure all requested documents are ready.