Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited ARECA-II Controller Spare Parts Tender Lucknow 2026 - BHEL Make, Door-delivery

Bid Publish Date

27-Jul-2026, 8:03 am

Bid End Date

31-Aug-2026, 11:00 am

Generate Docs

Progress

Issue27-Jul-2026, 8:03 am
Corrigendum17-Aug-2026
AwardPending

Key Highlights

  • 25% quantity variation allowed under option clause with contracted rates
  • Door-delivery on road transport; transit insurance included
  • 10% advance payment with PO; 90% on dispatch within 30 days
  • M/s BHEL Make subject spares specification

Tender Overview

The Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow, invites bids for the supply of subj ect spares described as ARECA-II Controller components under a BHEL make framework. The scope is strictly the supply of goods with door delivery, via road transport, and all related packing included. The procurement includes a 10% interest-free advance and 90% payment on dispatch, with RTGS details required in invoices. A 12-month guarantee from commissioning (or 18 months from supply, whichever occurs first) applies. The ATC permits quantity variation up to 25% during and after contract, and sourcing must align with fixed contracted rates. This tender emphasizes formal certificates and documentation to qualify, and emphasizes a BHEL-made subject with logistics arranged on-site. The absence of BOQ items suggests a focused, equipment-spares purchase targeting reliable supplier partnerships in the power-generation sector.

Technical Specifications & Requirements

  • Scope of supply: Only supply of Goods (no services)
  • Delivery: Material shall be dispatched through road transport, insured for transit risk, on door delivery basis
  • Documentation: Hand Receipt, Tax Invoice, Interchangeability Certificate, Guarantee/Warranty Certificate
  • Payment terms: 10% advance with PO, 90% on dispatch within 30 days of delivery at site stores; RTGS details required in invoice
  • Warranty: 12 months from commissioning or 18 months from supply, whichever is earlier
  • ATC highlights: Option to increase/decrease quantity up to 25% at bid/contract stage; delivery period adjusts accordingly
  • Packaging: Packaging & Forwarding inclusive; freight as applicable
  • OEM/Manufacturing: M/s BHEL Make subject spares
  • Compliance: Certificates/documents must be uploaded per ATC/Corrigendum

Terms, Conditions & Eligibility

  • Delivery terms include door delivery, road transport with transit insurance
  • Payment authority: Dy. CAO, CFA&BO, 2x500MW DTPS Anpara, Sonebhadra (UP) 231225
  • Advance payment: 10% of PO value; balance 90% on dispatch, taxes/duties at actuals
  • Warranty: 12 months post-commissioning or 18 months from supply
  • Required documents: Hand Receipt, Tax Invoice, Interchangeability Certificate, Warranty certificate
  • Quantity variation: ±25% during/within contract at contracted rates; extended delivery period governed by formula
  • Vendor eligibility: Must upload all requested certificates/documents; non-submission risks rejection

Key Specifications

  • Product/service names: ARECA-II Controller spares (BHEL Make)

  • Delivery method: door-to-door road transport, insured

  • Quantities: ±25% variation permitted under option clause

  • Warranty: 12 months from commissioning or 18 months from supply

  • Documentation: Hand Receipt, Tax Invoice, Interchangeability Certificate, Warranty Certificate

  • Payment terms: 10% advance; 90% on dispatch within 30 days

  • Certification: Interchangeability certificate; certificates uploaded per ATC

Terms & Conditions

  • Delivery terms include door delivery via road transport with insurance

  • Payment terms specify 10% advance and 90% on dispatch within 30 days

  • Quantity variation up to 25% at contracted rates with extended delivery rules

Important Clauses

Payment Terms

10% advance with PO; 90% on dispatch within 30 days, RTGS details required on invoice

Delivery Schedule

Delivery period begins from last date of original delivery order; option quantity extension affects delivery time as per formula

Penalties/Liquidated Damages

Not explicitly stated; extended delivery times governed by option clause and contract terms

Bidder Eligibility

  • Upload all required certificates per ATC/ATC Corrigendum

  • Experience in supplying BHEL-made spares or similar power equipment

  • GST registration and PAN; financial stability evidenced by statements

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

8

Category

INTELLIRAP CTRL RLYCRD BFRCRD

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

INTELLIRAP CTRL RLYCRD BFRCRD , ARECA-II Controller

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231225

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
ADALAT VERMA231225,DTPS, Anpara Thermal Power PlantSonbhadraUttar Pradesh231225490-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9604094.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

4 Updates
#1

Update

17-Aug-2026

Extended Deadline

31-Aug-2026, 5:30 am

Opening Date

31-Aug-2026, 6:00 am

#2

Update

17-Aug-2026

Extended Deadline

22-Aug-2026, 5:30 am

Opening Date

22-Aug-2026, 6:00 am

#3

Update

11-Aug-2026

Extended Deadline

17-Aug-2026, 5:30 am

Opening Date

17-Aug-2026, 6:00 am

#4

Update

06-Aug-2026

Extended Deadline

11-Aug-2026, 5:30 am

Opening Date

11-Aug-2026, 6:00 am

Required Documents

1

Hand Receipt

2

Tax Invoice

3

Interchangeability Certificate

4

Guarantee/Warranty Certificate

5

RTGS/Bank details for payment

6

GST registration and PAN

7

Experience certificates (BHEL make spares or related power equipment)

8

OEM authorization (if applicable)

9

Any other certificates requested in ATC/ATC Corrigendum

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for ARECA-II Controller spares tender in Lucknow?

Bidders must submit all ATC-required certificates, provide M/s BHEL Make spares details, and include 10% advance with PO and 90% on dispatch. Ensure door-delivery logistics, road transport insurance, and RTGS payment details on invoice; comply with amendment clauses and percentage variation up to 25%.

What documents are required for UP RUVN tender participation in 2026?

Submit Hand Receipt, Tax Invoice, Interchangeability Certificate, and Guarantee/Warranty Certificate; include GST registration, PAN, and OEM authorization where applicable. Ensure certificates align with ATC/ Corrigendum if issued and attach RTGS/payment details.

What are the payment terms for the BHEL spares contract in UP?

Payment comprises 10% advance with PO and 90% on dispatch, payable within 30 days of delivery to site stores; taxes and duties extra at actuals; account details must be provided for RTGS transfers.

What are the warranty terms for ARECA-II Controller spares procurement?

Warranty runs for 12 months from commissioning or 18 months from supply, whichever occurs earlier; guarantee certificate must accompany delivery and be valid for the term.

When is delivery time extended under the option clause for UP RUVN?

Delivery time extends based on (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extensions may continue up to the original delivery period under contract terms.

What standards or certifications are required for eligibility?

Interchangeability Certificate is mandatory; ensure compliance with BHEL-made spares requirements and attach OEM authorization if applicable; upload all certificates per ATC/ Corrigendum to avoid rejection.

What is the scope of supply in this UP RUVN tender?

Scope is strictly the supply of Goods (subject spares) with door-delivery; no services included; packaging and forwarding are included in the bid; freight to be borne per contract terms.

What is the logistics arrangement for the spares delivery?

Materials shall be dispatched via road transport, insured for transit, and delivered door-to-door; ensure proper packing suitable for road travel and include transit risk insurance with the shipment.