TenderDekho Logo
GEM

Bids are Invited For To Study Characteristics of DC Generator,To Study Load Test on Dc Shunt Motor and Plot the Followin in SIVASAGAR, ASSAM

Bid Publish Date

14-Oct-2025, 12:16 pm

Bid End Date

27-Nov-2025, 1:00 pm

EMD

₹42,000

Generate Docs

Progress

RA
Issue14-Oct-2025, 12:16 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

11

Category

To Study Characteristics of DC Generator

Bid Type

Two Packet Bid

Categories 47

A tender has been published for The Rajiv Gandhi Institute Of Petroleum Technology (rgipt) Rae Bareli Uttar Pradesh To Study Characteristics of DC Generator, To Study Load Test on Dc Shunt Motor and Plot the Following Characteristics of The Motor with Data Acquisition System with Software, To Study Load Test on DC Series Motor, To Study Load Test on DC Compound Motor, To Obtain Efficiency of a DC Shunt Machine Using Swinburns Test and To Obtain Speed Control of DC Shunt Motor Using Armature Resistance Control and Field Resistance Control, To Study Single Phase Transformer Setup, To Study Three Phase Squirrel Cage Induction Motor Setup With Data Acquisition System With Software, To Study Single Phase Induction Motor Setup, To Study Dc Shunt Motor Three Phase Ac Generator Setup, Study Parallel Operation of Three Phase Alternator Using Dark Lamp Method and Bright Lamp Method and Synchroscope and Auto Synchronization, Test The Performance of Synchronous Motor at Different Load Condition To See the Effect of Variation of Excitation And Power Factor likeV and Inverted V Curve in SIVASAGAR, ASSAM. Quantity: 11 by. Submission Deadline: 27-11-2025 13: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

To Study Characteristics of DC Generator , To Study Load Test on Dc Shunt Motor and Plot the Following Characteristics of The Motor with Data Acquisition System with Software , To Study Load Test on DC Series Motor , To Study Load Test on DC Compound Motor , To Obtain Efficiency of a DC Shunt Machine Using Swinburns Test and To Obtain Speed Control of DC Shunt Motor Using Armature Resistance Control and Field Resistance Control , To Study Single Phase Transformer Setup , To Study Three Phase Squirrel Cage Induction Motor Setup With Data Acquisition System With Software , To Study Single Phase Induction Motor Setup , To Study Dc Shunt Motor Three Phase Ac Generator Setup , Study Parallel Operation of Three Phase Alternator Using Dark Lamp Method and Bright Lamp Method and Synchroscope and Auto Synchronization , Test The Performance of Synchronous Motor at Different Load Condition To See the Effect of Variation of Excitation And Power Factor likeV and Inverted V Curve

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8397139.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

To Study Characteristics of DC Generator

As mentioned in specification

1 pieces Delivery: 45 days
#2

To Study Load Test on Dc Shunt Motor and Plot the Following Characteristics of The Motor with Data Acquisition System with Software

As mentioned in specification

1 pieces Delivery: 45 days
#3

To Study Load Test on DC Series Motor

As mentioned in specification

1 pieces Delivery: 45 days
#4

To Study Load Test on DC Compound Motor

As mentioned in specification

1 pieces Delivery: 45 days
#5

To Obtain Efficiency of a DC Shunt Machine Using Swinburns Test and To Obtain Speed Control of DC Shunt Motor Using Armature Resistance Control and Field Resistance Control

As mentioned in specification

1 pieces Delivery: 45 days
#6

To Study Single Phase Transformer Setup

As mentioned in specification

1 pieces Delivery: 45 days
#7

To Study Three Phase Squirrel Cage Induction Motor Setup With Data Acquisition System With Software

As mentioned in specification

1 pieces Delivery: 45 days
#8

To Study Single Phase Induction Motor Setup

As mentioned in specification

1 pieces Delivery: 45 days
#9

To Study Dc Shunt Motor Three Phase Ac Generator Setup

As mentioned in specification

1 pieces Delivery: 45 days
#10

Study Parallel Operation of Three Phase Alternator Using Dark Lamp Method and Bright Lamp Method and Synchroscope and Auto Synchronization

As mentioned in specification

1 pieces Delivery: 45 days
#11

Test The Performance of Synchronous Motor at Different Load Condition To See the Effect of Variation of Excitation And Power Factor likeV and Inverted V Curve

As mentioned in specification

1 pieces Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

17-Nov-2025
#2

Update

13-Nov-2025

Extended Deadline

27-Nov-2025, 1:00 pm

Opening Date

27-Nov-2025, 1:30 pm

Reverse Auction Schedule

Completed

Start

22-Feb-2026, 11:00 am

End

24-Feb-2026, 10:00 am

Duration: 47 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ACUMEN LABWARE   Under PMA
-13-11-2025 11:18:17
2
ANSHUMAN TECH PRIVATE LIMITED   Under PMA
-13-11-2025 11:20:12
3
DELTA TECHNOLOGIES   Under PMA
-12-11-2025 12:25:12
4
DEVI ELECTRONICS   Under PMA
-25-11-2025 15:10:50
5
Electronics and Electricals   Under PMA
-26-11-2025 18:01:29
6
ELETECH LAB INSTRUMENTS   Under PMA
-25-11-2025 17:38:26
7
KATHURIA ENTERPRISES   Under PMA
-12-11-2025 18:16:18
8
VISHAWKARMA SCIENTIFIC WORKS   Under PMA
-13-11-2025 12:36:28

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1ELETECH LAB INSTRUMENTS(MII)   Under PMA Winner ₹11,53,500Item Categories : To Study Characteristics of DC Generator,To Study Load Test on Dc Shunt Motor and Plot the Followin
L2Electronics and Electricals (MSE,MII)   Under PMA₹11,55,000Item Categories : To Study Characteristics of DC Generator,To Study Load Test on Dc Shunt Motor and Plot the Followin
L3DEVI ELECTRONICS (MSE,MII)   Under PMA₹24,90,000Item Categories : To Study Characteristics of DC Generator,To Study Load Test on Dc Shunt Motor and Plot the Followin

🎉 L1 Winner

ELETECH LAB INSTRUMENTS(MII)   Under PMA

Final Price: ₹11,53,500