Bokaro Steel Plant SAIL VT Pump Bown Assembly Tender Meghahatuburu Jharkhand 2026

Bid Publish Date

08-Aug-2026, 6:16 pm

Bid End Date

03-Sep-2026, 12:00 pm

Generate Docs

Progress

Issue08-Aug-2026, 6:16 pm
Corrigendum29-Aug-2026
AwardPending

Key Highlights

  • OEM-dimensionally exact VT Pump Bown Assembly 12-stage 16X12 required (Model 4116) with annexed spares.
  • Delivery window fixed at 2 months from PO; option to extend with quantity adjustments up to 25%.
  • Payment: 90% within 30 days after GRN; 10% on warranty completion or via 10% PBG from a Nationalized Bank.
  • Warranty: 18 months from receipt or 12 months from fitment, whichever earlier.

Tender Overview

Organization: Bokaro Steel Plant, part of Steel Authority of India Limited. Procurement: Supply of a 12 stage VT Pump Bown Assembly type 16X12 stage and associated spares for Meghahatuburu Iron Ore Mines. Location: Meghahatuburu, Jharkhand; delivery site at SAIL- BSL, Singhbhum (W). Quantity/Value: 16 items in BOQ; exact unit quantities not disclosed. Key differentiator: OEM-dimensionally exact fit required; strict fitment acceptance. Unique aspects: 2-month delivery window; warranty-linked payment terms; PBG option for 10% balance.

Technical Specifications & Requirements

  • Scope: Supply of 12 stage VT Pump Bown Assembly (model: 4116) and related spares per Annexure-1; must match OEM dimensions and mountings for seamless fitment in the pump.
  • Delivery: Within 2 months from purchase order issuance.
  • Warranty: 18 months from date of receipt or 12 months from date of fitment, whichever is earlier.
  • Payment Terms: 90% within 30 days after receipt/GRN at site; 10% on warranty completion or via PBG of 10% from a nationalized bank, valid for warranty and claim periods.
  • Consignee/Authority: Head of MM Meghahatuburu Iron Ore Mines; Paying Authority as specified by SAIL- BSL.

Terms & Eligibility

  • Delivery terms: 2 months; penalty or extension governed by option clause up to 25% quantity; extended delivery computed as (additional/ original) × original delivery period with a minimum 30 days.
  • Scope of supply: Only supply of goods; spares as per Annexure-1.
  • RPN clause: compliance with GEM contract terms; notice requirement for non-performance.
  • Eligibility: Supplier must meet OEM fitment capability and provide materials to Meghahatuburu Mines; payment commensurate with GRN and warranty obligations.
  • Bidders should prepare for strict adherence to OEM compatibility and site-specific acceptance criteria.

Key Specifications

    • Product: 12 stage VT Pump Bown Assembly, type 16X12 stage, model 4116
    • Delivery: within 2 months from PO issue
    • Warranty: 18 months from receipt or 12 months from fitment
    • Payment: 90% within 30 days after GRN; 10% on warranty completion or via PBG of 10%
    • Fitment: exact OEM dimensions and mounting compatibility; failure to fit -> rejection
    • Consignee: Meghahatuburu Iron Ore Mines, SAIL- BSL, Jharkhand

Terms & Conditions

  • Option clause allows quantity variation up to 25% during contract/currency with extended delivery time calc.

  • Payment terms specify 90% on receipt and 10% after warranty or via PBG; PBG must be from a Nationalized Bank.

  • Delivery deadline: 2 months from PO; non-performance triggers RPN clause and potential penalties.

Important Clauses

Payment Terms

90% of order value within 30 days against GRN; 10% after warranty or via 10% PBG from a Nationalized Bank.

Delivery Schedule

Delivery within 2 months; option to extend with up to 25% quantity, recalculated delivery time, minimum 30 days.

Penalties/Liquidated Damages

Not explicitly stated; terms imply adherence to delivery and performance standards under GEM contract.

Bidder Eligibility

  • Must have OEM authorization for VT Pump Bown Assembly 12-stage 16X12 (Model 4116)

  • Demonstrate ability to supply exact-fit spares and complete Annexure-1 contents

  • Financial capacity to support PBG or warranty obligations

Tender Data

Bid Details

Quantity

43

Category

IMPELLER V T PUMP

Bid Type

Two Packet Bid

Bid Validity

100 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

2 months

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

T T PLATE , SHAFT CNCLOSING TUBE SHAFT , BEARIN T T NUT , BRG BOWL RUBBER , IMPELLER V T PUMP , DISCHARGE CASE C I , SUCTION CASE SAND COLLAR , OIL WATER SEPARATOR , 2 and Half X 5 LONG BS LINE SHAFT , BRONZE SCREW BEARING FOR LINE SHAFT , SUCTION CASE BEARING BRONZE , PIPE WRENCH 36 , SUCTION CASE , INTERMEDIATE BOWL , CHAIN PIPE WRENCH 36 , TUBING ADOPTER

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

20

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

West Singhbhum

Delivery Pincodes

833223

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pravin Kumar833223,JHARKHAND GROUP OF ORE MINES, SAIL/JHARKHAND GROUP OF MINES, AT+POST: MEGHATABURU, DISTRICT: WEST SINGHBHUM, STATE: JHARKHAND, PIN: 833223., West Singhbhum, 833223West SinghbhumJharkhand833223160-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITEDBOKARO STEEL PLANT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9715914.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bokaro Steel Plant

Office Name

Bslp61

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

29-Aug-2026

Extended Deadline

03-Sep-2026, 6:30 am

Opening Date

03-Sep-2026, 7:00 am

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

T T PLATE

T T PLATE AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#2

SHAFT CNCLOSING TUBE SHAFT

SHAFT CNCLOSING TUBE SHAFT AS PER ATTACHED SPECIFICATION DOCUMENT

4 ea Delivery: 60 days
#3

BEARIN T T NUT

BEARIN T T NUT AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#4

BRG BOWL RUBBER

BRG BOWL RUBBER AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#5

IMPELLER V T PUMP

IMPELLER V T PUMP AS PER ATTACHED SPECIFICATION DOCUMENT

6 ea Delivery: 60 days
#6

DISCHARGE CASE C I

DISCHARGE CASE C I AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#7

SUCTION CASE SAND COLLAR

SUCTION CASE SAND COLLAR AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#8

OIL WATER SEPARATOR

OIL WATER SEPARATOR AS PER ATTACHED SPECIFICATION DOCUMENT

4 ea Delivery: 60 days
#9

2 and Half X 5 LONG BS LINE SHAFT

2 and Half X 5 LONG BS LINE SHAFT AS PER ATTACHED SPECIFICATION DOCUMENT

4 ea Delivery: 60 days
#10

BRONZE SCREW BEARING FOR LINE SHAFT

BRONZE SCREW BEARING FOR LINE SHAFT AS PER ATTACHED SPECIFICATION DOCUMENT

8 ea Delivery: 60 days
#11

SUCTION CASE BEARING BRONZE

SUCTION CASE BEARING BRONZE AS PER ATTACHED SPECIFICATION DOCUMENT

2 ea Delivery: 60 days
#12

PIPE WRENCH 36

PIPE WRENCH 36 AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#13

SUCTION CASE

SUCTION CASE AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#14

INTERMEDIATE BOWL

INTERMEDIATE BOWL AS PER ATTACHED SPECIFICATION DOCUMENT

6 ea Delivery: 60 days
#15

CHAIN PIPE WRENCH 36

CHAIN PIPE WRENCH 36 AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days
#16

TUBING ADOPTER

TUBING ADOPTER AS PER ATTACHED SPECIFICATION DOCUMENT

1 ea Delivery: 60 days

Categories 35

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar VT pump supply

4

Financial statements (last 2-3 years)

5

EMD/Security deposit (amount not specified in data; bidders should prepare as per tender guidance)

6

Technical bid documents indicating OEM authorization for Model 4116 and spares

7

OEM authorizations and conformity certificates

8

Past performance declarations and warranty commitments

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for VT pump Bown Assembly tender in Jharkhand 2026

Bidders must submit GST and PAN, financials, OEM authorization for model 4116, and experience certificates for similar pump supplies. Provide technical bid with Annexure-1 spares; ensure OEM dimension compatibility and confirm delivery within 2 months. Payment follows 90% on GRN and 10% on warranty/PBG.

What documents are required for Meghahatuburu pump supply tender

Required documents include GST certificate, PAN, company financial statements, experience certificates for VT pump supply, OEM authorization for model 4116, EMD documentation, technical bid including Annexure-1 spares, and performance/warranty commitments to meet 18-month warranty terms.

What are the delivery and warranty terms for the pump supply

Delivery must be completed within 2 months from PO; warranty lasts 18 months from receipt or 12 months from fitment whichever is earlier. If performance issues arise, PBG can secure the remaining 10% payment, valid through warranty and claim periods.

How is payment structured for the VT pump order

Payment releases 90% within 30 days after GRN at site, with the remaining 10% due after warranty completion or via PBG of 10% from a Nationalized Bank, ensuring coverage during the warranty period.

What is required to prove OEM compatibility for Model 4116

Submit OEM authorization for Model 4116, along with dimensional conformity certificates and Annexure-1 spares list to prove exact fitment for Meghahatuburu Mines’ VT pump assembly.

Are quantity variations allowed in this tender

Yes. The purchaser reserves the right to increase/decrease quantity up to 25% at contract placement and during currency, with extended delivery time calculated accordingly and a minimum 30-day extension.