Oil Filter Assy,Front Shocker Assy,Reverse Light Switch,Piston Assy,Piston Ring Set,Element Filter,
Indian Army
BARAMULLA, JAMMU & KASHMIR
Bid Publish Date
19-Feb-2026, 8:12 pm
Bid End Date
02-Mar-2026, 9:00 pm
Location
Progress
Quantity
12
Category
SWITCH COMPLETE
Bid Type
Single Packet Bid
The Indian Army under the Department Of Military Affairs invites bids for multiple mechanical/engineered components under the broad category including switch complete, retaining bracket, triple jet nozzle, Elgi air lube oil 1 L, piston assembly, and piston ring set. The opportunity is located in Lalitpur, Uttar Pradesh (284122) and references a 6-item BOQ with unspecified quantities. The tender specifies process terms such as quantity variation up to 25%, and a staged delivery approach anchored to contract delivery timelines. An emphasis on pre-bulk approval through advance sample is noted, with explicit timeframes for sample submission and modification cycles. The EMD, estimated value, and start/end dates are not disclosed in the available data. A unique feature is the option clause enabling dynamic orders during currency of contract at contracted rates, with delivery-time recalculation. Tender documentation will require samples (for inspection) and adherence to buyer-specified acceptance criteria to avoid LD penalties. This procurement targets technical components used in military equipment or maintenance spares, making conformance to precise specifications critical and time-sensitive.
Product categories: switch complete, retaining bracket, triple jet nozzle, Elgi air lube oil 1 L, piston assembly, piston ring set
Estimated value: Not disclosed in tender data
EMD: Not disclosed in tender data
Delivery: Based on original delivery order with possible 25% quantity variation
Sample clause: advance sample submission within 5 days; approval within 5 days; bulk supply after approval
Testing: Pre-dispatch/sampling as per buyer approval; reference samples for inspection
EMD amount and exact estimated contract value not disclosed
Delivery timelines adjustable with 25% quantity variation
Advance sample process mandatory before bulk manufacturing
Penalty framework primarily tied to LD and deviations after sample rejection
Not specified in data; standard practice likely to follow contract with advance sample requirements and potential milestone payments post-approval
Delivery period starts from the last date of original delivery order; extended period and time calculation: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
LD applicable if delays occur after approval; delays due to buyer approval may extend delivery without LD; termination possible for major deviations
Experience in supplying mechanical/military-grade spares is expected
GST registration and financial stability documentation required
OEM authorization or proven capability to source listed components
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
KANGRA, HIMACHAL PRADESH
Indian Army
SOLAN, HIMACHAL PRADESH
Indian Army
JAMMU, JAMMU & KASHMIR
Armed Forces Tribunal
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SWITCH COMPLETE | SWITCH COMPLETE | 1 | pieces | rajeshwar1985 | 15 |
| 2 | RETAINING BRACKET | RETAINING BRACKET | 1 | pieces | rajeshwar1985 | 15 |
| 3 | TRIPLE JET NOZZEL | TRIPLE JET NOZZEL | 1 | pieces | rajeshwar1985 | 15 |
| 4 | ELGI AIR LUBE OIL 1 LTR | ELGI AIR LUBE OIL 1 LTR | 1 | pieces | rajeshwar1985 | 15 |
| 5 | PISTON ASSY | PISTON ASSY | 4 | pieces | rajeshwar1985 | 15 |
| 6 | PISTON RING SET | PISTON RING SET | 4 | pieces | rajeshwar1985 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar items
Financial statements or turnover proof
EMD/Security deposit details
Technical bid documents and bid-compliance statements
OEM authorizations or line of supply certificates (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders should submit GST, PAN, experience certificates, financials, and EMD as per terms. Ensure advance sample is prepared within 5 days of award and obtain buyer approvals within 5 days; comply with 25% quantity variation and follow delivery timelines from the original order date.
Required documents include GST certificate, PAN card, experience certificates for similar items, latest financial statements, EMD submission details, technical bid, and OEM authorizations or supplier certifications demonstrating capability to supply switch complete and related components.
Submit one advance sample within 5 days of award; the buyer will approve or provide a modification list within 5 days. Bulk supply can only commence after approval; if delays occur, delivery timelines may be refixed without LD for the delay.
Up to 25% quantity variation is allowed at contract placement and during contract currency at contracted rates. Delivery timing will adjust using the formula (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.
Specific IS/ISO standards are not disclosed in the data; bidders should ensure compliance with buyer-approved specifications and provide OEM authorizations where applicable to demonstrate capability for the listed components.
Delivery starts from the last date of the original delivery order; if the option clause increases quantity or delivery time, the new period is calculated and may extend, ensuring a minimum 30 days additional time.
Check for GST registration, PAN, experience certificates in similar purchasing, and financial statements. Ensure ability to supply switch complete, retaining bracket, nozzle, piston parts; obtain OEM authorizations if required and align with advance sample process.
Advance sample ensures conformity to contract specifications before bulk manufacturing. Submit a sample within 5 days; buyer approves or lists modifications within 5 days. Delays in approval can affect delivery timelines and may lead to contract adjustments.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS