Bid Publish Date
09-May-2025, 11:57 am
Bid End Date
06-Jun-2025, 2:00 pm
EMD
₹3,41,000
Value
₹1,70,49,596
Location
Progress
Quantity
5
Category
Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Transformer Hall as per TS, SOW and QAP enclosed
Bid Type
Two Packet Bid
A tender has been published for Sjvn Limited Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Transformer Hall as per TS, SOW and QAP enclosed, Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Power House as per TS, SOW and QAP enclosed, Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Exhaust Blowers at Power House as per TS, SOW and QAP enclosed, Mandatory spare for Soft-Starter- Based latest Ventilation System as per detailed in TS, SOW and QAP enclosed, Dismantling, Installation and Commissioning of Soft-Starter-Based latest Ventilation System as per TS, SOW and QAP enclosed. in SHIMLA, HIMACHAL PRADESH. Quantity: 5 by. Submission Deadline: 06-06-2025 14: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Transformer Hall as per TS, SOW and QAP enclosed , Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Power House as per TS, SOW and QAP enclosed , Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Exhaust Blowers at Power House as per TS, SOW and QAP enclosed , Mandatory spare for Soft-Starter- Based latest Ventilation System as per detailed in TS, SOW and QAP enclosed , Dismantling, Installation and Commissioning of Soft-Starter-Based latest Ventilation System as per TS, SOW and QAP enclosed.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Transformer Hall as per TS, SOW and QAP enclosed
at Annexure-B
Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Power House as per TS, SOW and QAP enclosed
at Annexure-B
Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Exhaust Blowers at Power House as per TS, SOW and QAP enclosed
at Annexure-B
Mandatory spare for Soft-Starter-Based latest Ventilation System as per detailed in TS, SOW and QAP enclosed
at Annexure-B
Dismantling, Installation and Commissioning of Soft-Starter-Based latest Ventilation System as per TS, SOW and QAP enclosed.
at Annexure-B
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Transformer Hall as per TS, SOW and QAP enclosed | at Annexure-B | 1 | no | [email protected] | 150 | |
| 2 | Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Booster Blowers at Power House as per TS, SOW and QAP enclosed | at Annexure-B | 1 | no | [email protected] | 150 | |
| 3 | Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associated equipment and accessories of Exhaust Blowers at Power House as per TS, SOW and QAP enclosed | at Annexure-B | 1 | no | [email protected] | 150 | |
| 4 | Mandatory spare for Soft-Starter-Based latest Ventilation System as per detailed in TS, SOW and QAP enclosed | at Annexure-B | 1 | lot | [email protected] | 150 | |
| 5 | Dismantling, Installation and Commissioning of Soft-Starter-Based latest Ventilation System as per TS, SOW and QAP enclosed. | at Annexure-B | 1 | no | [email protected] | 150 |
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
06-Jun-2025, 2:00 pm
Opening Date
06-Jun-2025, 2:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AMTECH ELECTRONICS (INDIA) LIMITED Under PMA | - | 30-05-2025 13:31:19 | |
| 2 | ANGEL INDUSTRIAL INSTRUMENTATION Under PMA | - | 06-06-2025 12:52:32 | |
| 3 | APEX AUTOMATION & CONTROLS Under PMA | - | 05-06-2025 21:52:09 | |
| 4 | AUTOMATION SYSTEMS Under PMA | - | 05-06-2025 11:56:30 | |
| 5 | AVIGHNA MECHATRONICS AND CONTROLS LLP Under PMA | - | 30-05-2025 13:35:28 | |
| 6 | CECO ELECTRIC CO. Under PMA | - | 30-05-2025 13:54:18 | |
| 7 | ENCON ENGINEERS Under PMA | - | 29-05-2025 21:25:03 | |
| 8 | INDUSTRIAL AUTOMATION AND LOGIC SOLUTION Under PMA | - | 30-05-2025 13:38:18 | |
| 9 | INTEGRATED ENGINEERING Under PMA | - | 05-06-2025 23:25:57 | |
| 10 | TEMFLO SYSTEMS PRIVATE LIMITED Under PMA | - | 05-06-2025 18:28:50 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | INTEGRATED ENGINEERING(MII)( MSE Social Category:General ) Under PMA | Item Categories : Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associat | |
| L2 | AUTOMATION SYSTEMS (MII) Under PMA | Item Categories : Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associat | |
| L3 | TEMFLO SYSTEMS PRIVATE LIMITED (MII) Under PMA | Item Categories : Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associat | |
| L4 | INDUSTRIAL AUTOMATION AND LOGIC SOLUTION (MII)( MSE Social Category:OBC ) Under PMA | Item Categories : Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associat | |
| L5 | ENCON ENGINEERS (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : Latest Technology based control cubicle equipped with PLC, Soft starter with HMI and other associat |
Please sign in or create an account to view contract details and download result documents.
Key insights about HIMACHAL PRADESH tender market
The eligibility requirements for this tender include being a legally registered entity with valid business certifications. Applicants should demonstrate prior experience in executing similar projects, particularly those related to SITC of PLC and Soft Starter based systems.
Participants are expected to submit various certificates, which may include business registration documents, tax compliance certifications, and any project experience certificates that validate past experiences in relevant technologies.
To register for this tender, bidders must access the relevant online portal, fill out the registration forms, and comply with the necessary document submissions as outlined in the tender documentation.
Bidders should refer to the tender guidelines for specifics on acceptable file formats. Typically, documents can include PDFs, Word documents, and Excel spreadsheets, as stated in the official guidelines.
Bidders must submit an Earnest Money Deposit (EMD) as outlined in the tender to secure their proposal. Detailed terms regarding performance security requirements, along with payment terms and evaluation procedures, are provided within the tender documents. Compliance with these conditions is imperative for favorable evaluation and project approval.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS