Organization: Indian Army (Department of Military Affairs) seeks procurement services for Repair of Inverter 5 KVA PCB to be performed at the Faculty of Electronics (FEL), MCEME, Trimulgherry, Secunderabad-500015, Telangana. The scope centers on repairing a 5 KVA inverter PCB, with delivery expectations aligned to the original delivery period and potential quantity adjustments per the option clause. The contract emphasizes OEM/authorized reseller involvement, and mandatory certification uploads. The opportunity requires demonstrable experience in similar government procurements and validated financial standing. The presence of BIS/type test certificates is mandated, and installation/commissioning (if included) must be performed by OEM-certified resources. The tender specifies a flexible quantity delta (up to 25%), signaling a scalable repair contract that adapts to demand while preserving contracted rates.
Quantity variation up to 25% with proportional delivery time adjustment
OEM-certified installation/commissioning required if applicable
Mandatory BIS/type test certificates and OEM authorizations
Not explicitly stated; bidders should anticipate standard govt terms with GST compliance and EFT-based payment
Delivery period aligned to original order; extended time calculated for increased quantity with minimum 30 days
Not specified; expected to follow standard govt procurement LD provisions per contract
3 years of regular manufacturing/supply experience for similar products to govt/PSU/central or state bodies
No liquidation or bankruptcy proceedings; provide undertaking
OEM-certified resource capability for installation, commissioning, testing, and configuration
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
30 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair of Inverter 5 KVA PCB
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
RANGAREDDY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | RANGAREDDY | RANGAREDDY | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate (bank-certified)
BIS license
Type test certificates
OEM authorization if applicable
Evidence of 3-year govt/PSU supply experience
Contracts/PO copies supporting yearly supply
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, BIS license, type test certificates, OEM authorizations (if applicable), and evidence of 3 years’ govt/PSU supply experience, along with contract references for yearly quantities.
If quantity increases up to 25%, the new delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days, and the purchaser may extend up to the original delivery period.
Bidders must upload BIS license and type test certificates; OEM certificates and approvals per product specification are also required, else bid may be rejected.
Bidder or its OEM must have manufactured and supplied the same or similar category products to Central/State Govt organizations or PSU for at least 3 years prior to bid opening, with contract copies submitted.
Delivery/installation is at Faculty of Electronics (FEL), MCEME, Trimulgherry, Secunderabad-500015, Telangana, with commissioning by OEM-certified personnel if included in scope.
The purchaser may increase or decrease the quantity by up to 25% at bid/contract, with rates kept the same and delivery timeline adjusted as per the option clause.
OEM certification or authorized reseller status is required for installation/commissioning; BIS/type test and product-specific certificates must be provided by the bidder or OEM.
Initial delivery period applies to the original order; extended time for increases is calculated per the option clause, maintaining minimum 30 days beyond the extended period.