Bid Publish Date
01-Sep-2026, 10:23 am
Bid End Date
11-Sep-2026, 11:00 am
Location
Progress
Organization: Indian Army (Department Of Military Affairs) seeks procurement of a broad range of vehicle spare parts, including Piston Ring Set, Piston Assembly Over Size, Bearing Rear, Chain and Sprocket Kit, Front Brake Cable, Generator Assembly, Syren Assembly, Switch, Element Oil Filter, Universal Joint, Latch Assembly Door LH, Rear Brake Pads, Front Brake Pads, Regulator Assembly, Rectifier. The BOQ lists 15 total items, though itemized quantities are not disclosed. Estimated value and EMD amounts are not provided. Procurement location is not disclosed. The tender emphasizes quantity flexibility up to +25% during contract execution and a delivery timeline linked to the original delivery order, with extension rules. Bidders must confirm GST applicability and provide standard financial disclosures. This is a government procurement opportunity with OEM turnover prerequisites and a vendor code creation process, including PAN, GSTIN, and EFT mandates.
Option-based quantity fluctuation up to 25% with corresponding delivery extension rules
GST applicability and reimbursement per actuals or quoted rate; bidder bears GST assessment
Mandatory vendor-code documents: PAN, GSTIN, cancelled cheque, EFT mandate; turnover verification for last 3 years
GST as per actuals or applicable rate; payment terms aligned with standard government procurement after delivery/completion; no explicit advance mentioned
Delivery period begins from last date of original delivery order; option-based extensions apply with minimum 30 days; extended duration proportional to quantity variation
Not detailed in provided terms; standard government LD norms likely apply; bidders should verify LD/penalties in final bid document
Not under liquidation, bankruptcy, or court receivership
Fulfill OEM turnover and bidder turnover criteria for last 3 years
Provide PAN, GSTIN, EFT mandate, and bank-certified turnover evidence
Quantity
20
Category
Piston Ring Set
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
30 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Piston Ring Set , Piston Assy Over Size , Bearing Rear , Chain and Sprocket Kit , Front Brake Cable , Generator Assy , Syren Assy , Switch , Element Oil Filter , Parts Kit Universal Joint , Latch Assy Door LH , Rear Brake Pads , Front Brake Pads , Regulator Assy , Rectifier
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bareilly
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bareilly | Bareilly | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Piston Ring Set
Piston Ring Set
Piston Assy Over Size
Piston Assy Over Size
Bearing Rear
Bearing Rear
Chain and Sprocket Kit
Chain and Sprocket Kit
Front Brake Cable
Front Brake Cable
Generator Assy
Generator Assy
Syren Assy
Syren Assy
Switch
Switch
Element Oil Filter
Element Oil Filter
Parts Kit Universal Joint
Parts Kit Universal Joint
Latch Assy Door LH
Latch Assy Door LH
Rear Brake Pads
Rear Brake Pads
Front Brake Pads
Front Brake Pads
Regulator Assy
Regulator Assy
Rectifier
Rectifier
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Piston Ring Set | Piston Ring Set | 1 | nos | tss850 | 15 | |
| 2 | Piston Assy Over Size | Piston Assy Over Size | 1 | nos | tss850 | 15 | |
| 3 | Bearing Rear | Bearing Rear | 2 | nos | tss850 | 15 | |
| 4 | Chain and Sprocket Kit | Chain and Sprocket Kit | 1 | nos | tss850 | 15 | |
| 5 | Front Brake Cable | Front Brake Cable | 1 | nos | tss850 | 15 | |
| 6 | Generator Assy | Generator Assy | 1 | nos | tss850 | 15 | |
| 7 | Syren Assy | Syren Assy | 1 | nos | tss850 | 15 | |
| 8 | Switch | Switch | 1 | nos | tss850 | 15 | |
| 9 | Element Oil Filter | Element Oil Filter | 1 | nos | tss850 | 15 | |
| 10 | Parts Kit Universal Joint | Parts Kit Universal Joint | 1 | nos | tss850 | 15 | |
| 11 | Latch Assy Door LH | Latch Assy Door LH | 2 | nos | tss850 | 15 | |
| 12 | Rear Brake Pads | Rear Brake Pads | 2 | nos | tss850 | 15 | |
| 13 | Front Brake Pads | Front Brake Pads | 2 | nos | tss850 | 15 | |
| 14 | Regulator Assy | Regulator Assy | 2 | nos | tss850 | 15 | |
| 15 | Rectifier | Rectifier | 1 | nos | tss850 | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
Audited Balance Sheets or CA/Cost Accountant turnover certificate (last 3 years)
OEM authorization / manufacturer’s accreditation (if applicable)
GST compliance documentation and any applicable tax certificates
Financial statements and vendor qualification documents as per Terms
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate for vendor code creation, plus audited turnover certificates for last 3 years. OEM turnover proof is required, with the tender referencing 15 listed items. Ensure GST compliance and understand the option to adjust quantities up to 25% with delivery extensions.
Submit PAN Card copy, GSTIN copy, cancelled cheque, EFT Mandate, turnover certificates (audited or CA certificate) for last 3 years, OEM authorization if not the original manufacturer, and any standard compliance certificates. Also include financial statements and GST-related documents as per T&C.
No explicit IS or OEM standards are listed; bidders should ensure part compatibility with Indian Army platforms, emphasize quality control, and supply with proper part numbers. Validate that 15 items align with vehicle maintenance kits, including piston rings, brake components, and regulators, with OEM certifications where applicable.
Delivery starts from the last date of the original delivery order. If quantity increases, extension is: (Increased quantity / Original quantity) × Original delivery period, minimum 30 days. The purchaser may extend up to the original delivery period under the option clause.
EMD details are not disclosed in the provided data. Bidders should review the final bid document for the exact EMD amount, payment method, and validity; ensure funds are ready for submission with bid as per government procurement norms.
Bidders must assess GST applicability themselves; reimbursement will be at actuals or applicable rates, capped at the quoted GST percentage. Ensure GSTIN is active and match with the billing entity; the difference between actuals and quoted GST may affect final payment.