Progress
National Automotive Board invites bids for electrical equipment and associated works at ICAT-I Manesar, Haryana, with the scope covering Supply, Installation, Testing & Commissioning of key electrical assets. The procurement includes 100 kVAR SVG at 150 Amps, a MCCB 4-pole 200 Amps arrangement, a Vertical Wall Mounted Distribution Board (DB), PVC Copper Cables (4-Core 70 Sqmm; 6-Core 2.5 Sqmm), and related termination accessories. Estimated contract value is ₹1,888,590. Location is GURGAON, HARYANA (122001), aligning with the ICAT-Manesar site requirements and deployment of energy-saving technology. The bid emphasizes integrated services (supply, installation, testing, commissioning) and supports flexibility via option clauses for quantity adjustments up to ±25%. Unique scope includes on-site integration and commissioning for a generator-IGBT based energy saver system for the ICAT facility.
Quantity may be increased/decreased by up to 25% at contract award and during currency
Delivery period starts from the last date of original delivery order; extended time formula with minimum 30 days
Bid price must cover all costs, including supply, installation, testing, and commissioning
Payment terms are not specified in data; bidders should confirm terms in ATC or draft contract
Delivery period adjusts with option quantity; minimum 30 days; start from last delivery order date
Not specified; bidder to verify during bid submission and contract negotiation
Experience in supply and on-site installation of electrical switchgear and cables
Financial capability demonstrated by latest audited statements
Compliance with local electrical safety and procurement rules; OEM authorizations as required
Quantity
180
Category
100 kVAR 150Amps SVG
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
100 kVAR 150Amps SVG , MCCB 4Pole 200Amps , Vertical Wall Mounted DB , PVC Copper Cable 4Core 70Sqmm , PVC Copper Cable 6Core 2.5 Sqmm , Accessories for Termination
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Gurugram
Delivery Pincodes
122051
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Girish Chander | 122051,INTERNATIONAL CENTRE FOR AUTOMOTIVE TECHNOLGY Plot No 26, Sector 3, HSIIDC, IMT-Manesar, Gurgaon 122050 | Gurugram | Haryana | 122051 | 3 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
100 kVAR 150Amps SVG
Refer ATC
MCCB 4Pole 200Amps
Refer ATC
Vertical Wall Mounted DB
Refer ATC
PVC Copper Cable 4Core 70Sqmm
Refer ATC
PVC Copper Cable 6Core 2.5 Sqmm
Refer ATC
Accessories for Termination
Refer ATC
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 100 kVAR 150Amps SVG | Refer ATC | 3 | nos | girish.icat | 45 | |
| 2 | MCCB 4Pole 200Amps | Refer ATC | 3 | nos | girish.icat | 45 | |
| 3 | Vertical Wall Mounted DB | Refer ATC | 3 | nos | girish.icat | 45 | |
| 4 | PVC Copper Cable 4Core 70Sqmm | Refer ATC | 70 | meter | girish.icat | 45 | |
| 5 | PVC Copper Cable 6Core 2.5 Sqmm | Refer ATC | 100 | meter | girish.icat | 45 | |
| 6 | Accessories for Termination | Refer ATC | 1 | job | girish.icat | 45 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar electrical equipment supply/installation projects
Financial statements (last 2-3 years) demonstrating financial capacity
EMD documents or notification of bid security (as applicable)
Technical bid documents including proposed equipment specifications and installation plan
OEM authorization letters for the SVG, MCCB, DB, and cables (if not self-manufactured)
Product manuals or compliance certificates for 100 kVAR SVG, 150 Amps, MCCB 200A, and cables
Any site-specific safety and installation approvals
Key insights about HARYANA tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD totaling as per ATC. Include OEM authorizations for SVG, MCCB, DB, and cables along with a detailed installation plan and commissioning schedule.
Required documents include GST certificate, PAN, last 3 years financials, experience certificates for similar work, EMD, OEM authorizations, technical bid with equipment datasheets, and installation/commissioning plan for the 100 kVAR SVG, 200A MCCB, and DB systems.
Key specs include a 100 kVAR SVG designed for 150 Amps, compatible MCCB 4-pole 200A, vertical wall mounted DB, and PVC copper cables 4Core 70 Sqmm and 6Core 2.5 Sqmm; all termination accessories to be supplied.
Delivery terms allow extension via option clause up to 25% and adjusted delivery time based on (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Payment terms are not specified in the data; bidders should confirm in the ATC or contract, with standard government terms likely including milestone-based payments after supply, installation, and testing.
Bidders should provide OEM authorizations, and ensure equipment complies with relevant electrical safety standards; IS or BIS marks may be required as per tender ATC.
Prepare a comprehensive proposal covering supply, installation, testing, and commissioning of SVG 100 kVAR, MCCB 200A, vertical DB, and cables, with on-site commissioning plan and post-installation support schedule.
The estimated value is ₹1,888,590; bidders should factor in all-inclusive pricing for supply, installation, testing, and commissioning, plus any necessary consumables and termination accessories.