Rotary Encoder,Harness Cable Kit,Encoder Connection Cable,Steel Wire Rope 1,Steel Wire Rope 2,Diver
Indian Statistical Institute
Progress
Quantity
61
Category
1KITWIRE HARNESS
Bid Type
Two Packet Bid
Bharat Earth Movers Limited (beml) has released a public tender for 1KITWIRE HARNESS, 2KITWIRE HARNESS, 3WIRE HARNESSREAR, 4WIRE HARNESSCABIN HEATER, 5KITWIRE HARNESS, 6WIRE HARNESS SOLENOID STOP SWITCH, 7KIT WIRE HARNESS BD651, 8WIRE HARNESS, SHORT LINK FOR AC, 9RECEPTACLEDTP-4 WAY, 10PLUGDTP4 WAY, 11TERMINALPLUG, 12TERMINAL RECEPTACLE, 13DTP TERMINALPLUG, 14DTP TERMINAL RECEPTACLE, 15KIT WIRE HARNESSBD355BD155P VERSION, 16KIT, WIRE HARNESS-BD355155 A version, 17KITWIRE HARNESS for ElectDisplay, 18WIRE HARNESS, 19WIRE HARNESSHORN, 20WH LIMIT SWITCH, 21WIRE HARNESS AIR FILTER CLOG, 22ELECTRICAL ITEMS KIT FOR EG ENG, 23ELECKIT ITEMS FOR RV CAMERA, 24KITWIRE HARNESS, 25KITWIRE HARNESS-P VersionEle. Display, 26KITWIRE HARNESSE VersionEleDisplay, 27KITWIRE HARNESSA version, 28KITWIRE HARNESS P VersionElDisplay, 29WIRE HARNESSENGINE, 30WIRE HARNESS FLOOR, 31CONTROLLER HARNESS, 32TRANSMISSION WIRE HARNESS, 33WIRE HARNESS KEY SWITCH, 34INTERMEDIATE WIRING HARNESS, 35CLUTCH PRESSURE WIRING HARNESS, 36WIRE HARNESSTOP SENSOR, 37WIRE HARNESS FOG LAMP, 38KITSEAT BELT MATERIAL, 39WIRE HARNESS STEREO SYSTEM, 40WIRE HARNESS TRAVEL ALARM, 41TRAVEL HOUR METER WIRE HARNESS, 42KIT WIRE HARNESS BEML ENGINE, 43WIRE HARNESSFUSE BOX, 44KIT WIRE HARNESS AL BSIV ENGINE, 45PRE HEAT WH, 46AC WIRE HARNESS OPTIONAL, 47WIRE ASSY, 48KIT WIRE HARNESS KOEL ENGINE, 49KITWIRE HARNESS, 50KITWIRE HARNESS, 51WIRE HARNESS, 52WIRE HARNESS KIT, 53LADDER LAMP WIRE HARNESS kit, 54WIRE HARNESS KIT, 55WIRE HARNESS KIT, 56KITWIRE HARNESS, 57WIRE HARNESSAIR FILTER CLOG, 58WIRE HARNESS KIT DANFOSS PCMV, 59CLUTCH PRHARNESS, 60WIRE HARNESS KIT DANFOSS PCMV, 61CLUTCH PRESSURE WH in KOLAR, KARNATAKA. Quantity: 61. Submission Deadline: 29-11-2024 18: 00: 00. Download documents and apply online.
Main Document
BOQ
BOQ
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Statistical Institute
Indian Army
DIMAPUR, NAGALAND
Indian Air Force
THANJAVUR, TAMIL NADU
Indian Army
BAREILLY, UTTAR PRADESH
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 1KITWIRE HARNESS | KITWIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 2 | 2KITWIRE HARNESS | KITWIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 3 | 3WIRE HARNESSREAR | WIRE HARNESSREAR | 1 | pieces | mohan_k@beml | 60 |
| 4 | 4WIRE HARNESSCABIN HEATER | WIRE HARNESSCABIN HEATER | 1 | pieces | mohan_k@beml | 60 |
| 5 | 5KITWIRE HARNESS | KITWIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 6 | 6WIRE HARNESS SOLENOID STOP SWITCH | WIRE HARNESS SOLENOID STOP SWITCH | 1 | pieces | mohan_k@beml | 60 |
| 7 | 7KIT WIRE HARNESS BD651 | KIT WIRE HARNESS BD651 | 1 | pieces | mohan_k@beml | 60 |
| 8 | 8WIRE HARNESS,SHORT LINK FOR AC | WIRE HARNESS,SHORT LINK FOR AC | 1 | pieces | mohan_k@beml | 60 |
| 9 | 9RECEPTACLEDTP-4 WAY | RECEPTACLEDTP-4 WAY | 1 | pieces | mohan_k@beml | 60 |
| 10 | 10PLUGDTP4 WAY | PLUGDTP4 WAY | 1 | pieces | mohan_k@beml | 60 |
| 11 | 11TERMINALPLUG | TERMINALPLUG | 1 | pieces | mohan_k@beml | 60 |
| 12 | 12TERMINAL RECEPTACLE | TERMINAL RECEPTACLE | 1 | pieces | mohan_k@beml | 60 |
| 13 | 13DTP TERMINALPLUG | DTP TERMINALPLUG | 1 | pieces | mohan_k@beml | 60 |
| 14 | 14DTP TERMINAL RECEPTACLE | DTP TERMINAL RECEPTACLE | 1 | pieces | mohan_k@beml | 60 |
| 15 | 15KIT WIRE HARNESSBD355BD155P VERSION | KIT WIRE HARNESSBD355BD155P VERSION | 1 | pieces | mohan_k@beml | 60 |
| 16 | 16KIT,WIRE HARNESS-BD355155 A version | KIT,WIRE HARNESS-BD355155 A version | 1 | pieces | mohan_k@beml | 60 |
| 17 | 17KITWIRE HARNESS for ElectDisplay | KITWIRE HARNESS for ElectDisplay | 1 | pieces | mohan_k@beml | 60 |
| 18 | 18WIRE HARNESS | WIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 19 | 19WIRE HARNESSHORN | WIRE HARNESSHORN | 1 | pieces | mohan_k@beml | 60 |
| 20 | 20WH LIMIT SWITCH | WH LIMIT SWITCH | 1 | pieces | mohan_k@beml | 60 |
| 21 | 21WIRE HARNESS AIR FILTER CLOG | WIRE HARNESS AIR FILTER CLOG | 1 | pieces | mohan_k@beml | 60 |
| 22 | 22ELECTRICAL ITEMS KIT FOR EG ENG | ELECTRICAL ITEMS KIT FOR EG ENG | 1 | pieces | mohan_k@beml | 60 |
| 23 | 23ELECKIT ITEMS FOR RV CAMERA | ELECKIT ITEMS FOR RV CAMERA | 1 | pieces | mohan_k@beml | 60 |
| 24 | 24KITWIRE HARNESS | KITWIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 25 | 25KITWIRE HARNESS-P VersionEle.Display | KITWIRE HARNESS-P VersionEle.Display | 1 | pieces | mohan_k@beml | 60 |
| 26 | 26KITWIRE HARNESSE VersionEleDisplay | KITWIRE HARNESSE VersionEleDisplay | 1 | pieces | mohan_k@beml | 60 |
| 27 | 27KITWIRE HARNESSA version | KITWIRE HARNESSA version | 1 | pieces | mohan_k@beml | 60 |
| 28 | 28KITWIRE HARNESS P VersionElDisplay | KITWIRE HARNESS P VersionElDisplay | 1 | pieces | mohan_k@beml | 60 |
| 29 | 29WIRE HARNESSENGINE | WIRE HARNESSENGINE | 1 | pieces | mohan_k@beml | 60 |
| 30 | 30WIRE HARNESS FLOOR | WIRE HARNESS FLOOR | 1 | pieces | mohan_k@beml | 60 |
| 31 | 31CONTROLLER HARNESS | CONTROLLER HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 32 | 32TRANSMISSION WIRE HARNESS | TRANSMISSION WIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 33 | 33WIRE HARNESS KEY SWITCH | WIRE HARNESS KEY SWITCH | 1 | pieces | mohan_k@beml | 60 |
| 34 | 34INTERMEDIATE WIRING HARNESS | INTERMEDIATE WIRING HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 35 | 35CLUTCH PRESSURE WIRING HARNESS | CLUTCH PRESSURE WIRING HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 36 | 36WIRE HARNESSTOP SENSOR | WIRE HARNESSTOP SENSOR | 1 | pieces | mohan_k@beml | 60 |
| 37 | 37WIRE HARNESS FOG LAMP | WIRE HARNESS FOG LAMP | 1 | pieces | mohan_k@beml | 60 |
| 38 | 38KITSEAT BELT MATERIAL | KITSEAT BELT MATERIAL | 1 | pieces | mohan_k@beml | 60 |
| 39 | 39WIRE HARNESS STEREO SYSTEM | WIRE HARNESS STEREO SYSTEM | 1 | pieces | mohan_k@beml | 60 |
| 40 | 40WIRE HARNESS TRAVEL ALARM | WIRE HARNESS TRAVEL ALARM | 1 | pieces | mohan_k@beml | 60 |
| 41 | 41TRAVEL HOUR METER WIRE HARNESS | TRAVEL HOUR METER WIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 42 | 42KIT WIRE HARNESS BEML ENGINE | KIT WIRE HARNESS BEML ENGINE | 1 | pieces | mohan_k@beml | 60 |
| 43 | 43WIRE HARNESSFUSE BOX | WIRE HARNESSFUSE BOX | 1 | pieces | mohan_k@beml | 60 |
| 44 | 44KIT WIRE HARNESS AL BSIV ENGINE | KIT WIRE HARNESS AL BSIV ENGINE | 1 | pieces | mohan_k@beml | 60 |
| 45 | 45PRE HEAT WH | PRE HEAT WH | 1 | pieces | mohan_k@beml | 60 |
| 46 | 46AC WIRE HARNESS OPTIONAL | AC WIRE HARNESS OPTIONAL | 1 | pieces | mohan_k@beml | 60 |
| 47 | 47WIRE ASSY | WIRE ASSY | 1 | pieces | mohan_k@beml | 60 |
| 48 | 48KIT WIRE HARNESS KOEL ENGINE | KIT WIRE HARNESS KOEL ENGINE | 1 | pieces | mohan_k@beml | 60 |
| 49 | 49KITWIRE HARNESS | KITWIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 50 | 50KITWIRE HARNESS | KITWIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 51 | 51WIRE HARNESS | WIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 52 | 52WIRE HARNESS KIT | WIRE HARNESS KIT | 1 | pieces | mohan_k@beml | 60 |
| 53 | 53LADDER LAMP WIRE HARNESS kit | LADDER LAMP WIRE HARNESS kit | 1 | pieces | mohan_k@beml | 60 |
| 54 | 54WIRE HARNESS KIT | WIRE HARNESS KIT | 1 | pieces | mohan_k@beml | 60 |
| 55 | 55WIRE HARNESS KIT | WIRE HARNESS KIT | 1 | pieces | mohan_k@beml | 60 |
| 56 | 56KITWIRE HARNESS | KITWIRE HARNESS | 1 | pieces | mohan_k@beml | 60 |
| 57 | 57WIRE HARNESSAIR FILTER CLOG | WIRE HARNESSAIR FILTER CLOG | 1 | pieces | mohan_k@beml | 60 |
| 58 | 58WIRE HARNESS KIT DANFOSS PCMV | WIRE HARNESS KIT DANFOSS PCMV | 1 | pieces | mohan_k@beml | 60 |
| 59 | 59CLUTCH PRHARNESS | CLUTCH PRHARNESS | 1 | pieces | mohan_k@beml | 60 |
| 60 | 60WIRE HARNESS KIT DANFOSS PCMV | WIRE HARNESS KIT DANFOSS PCMV | 1 | pieces | mohan_k@beml | 60 |
| 61 | 61CLUTCH PRESSURE WH | CLUTCH PRESSURE WH | 1 | pieces | mohan_k@beml | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
17-Jan-2025, 9:00 am
Opening Date
17-Jan-2025, 9:30 am
Extended Deadline
04-Jan-2025, 9:00 am
Opening Date
04-Jan-2025, 9:30 am
Extended Deadline
10-Dec-2024, 6:00 pm
Opening Date
10-Dec-2024, 6:30 pm
Extended Deadline
29-Nov-2024, 6:00 pm
Opening Date
29-Nov-2024, 6:30 pm
Key insights about KARNATAKA tender market
The eligibility requirements include being a registered entity, demonstrating sufficient experience in similar projects, and meeting minimum turnover criteria. Bidders seeking exemptions must provide adequate documentation supporting their eligibility for being exempted from these criteria during the submission.
Bidders must upload various required certificates including financial statements, experience documentation, and any supporting documents if exemption from eligibility criteria is sought. It's crucial to adhere to the details specified in the tender documents to avoid disqualification.
The registration process typically requires bidders to create an account on the dedicated procurement portal. All details regarding the registration steps and necessary documentation are elaborated in the tender documents.
Accepted document formats generally include PDF, DOC, and XLS. Bidders should ensure all submissions comply with the accepted document formats detailed in the tender guidelines to prevent issues during evaluation.
Yes, compliance with the detailed technical specifications outlined in the tender is mandatory. Bidders must familiarize themselves with the specifications to ensure their proposals include compliant products.
All items supplied must adhere to the quality standards defined in the contract documents. Bidders should provide evidence of compliance with these quality standards to ensure their proposals are competitive.
Yes, bidders must adhere to all compliance requirements outlined within the tender documents. This includes ensuring that their products and processes meet the standards set by the Ministry of Defence.
The Earnest Money Deposit (EMD) details, including the amount and submission instructions, are specified within the tender documents. It is an important prerequisite for bid submission compliance.
Yes, performance security requirements must be met as detailed in the bidding documents. This security is crucial to ensure successful execution of the contracts awarded.
Payment terms, including any advance payments or milestones tied to project delivery, are specified in the tender documentation. Bidders should review these terms closely to align their proposals accordingly.
Price evaluation considerations will involve assessing the complete financial proposals submitted by all bidders to determine the most competitive offer while fulfilling compliance with technical specifications.
Bidders are required to submit their proposals electronically as per the guidelines specified in the tender documents. All submissions must adhere to the prescribed submission methods to ensure acceptance.
Detailed timelines and deadlines are provided within the bid documents. Bidders must maturely adhere to these to ensure their proposals are submitted on time and compliant with the tender timelines outlined.
The evaluation and selection process is conducted based on predetermined criteria including technical compliance, financial offer, and past performance records. Bidders must ensure that their submissions adequately meet all specified criteria.
Notification of results will be communicated via the official channels outlined in the tender. Bidders should remain attentive to these communications for any updates regarding the outcome of their submission.
The tender provides provisions targeting Micro, Small, and Medium Enterprises (MSEs), enhancing their opportunities to actively participate and contribute to defense procurement.
Yes, there are specific provisions for startups that allow them to engage in the bidding process effectively, mitigating barriers often faced by new companies entering the market.
Bidders are expected to comply with the 'Make in India' policies which promote local manufacturing and procurement, adhering to regulations outlined within the tender specifications.
Yes, bidders must understand and comply with the local content and procurement rules as defined within the tender to ensure their compliance with government policies.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS