Construction of Subway Near Netaji Bridge at Km. 1100.245 of the Stretch from Chinna Avutupalli (Km.1076.480) to Kanaka Durgamma Varadhi (Km.1100.254) on Vijayawada - Gundugolanu Section of NH-16 in the State of AP on item rate (percentage) basis
National Highways Authority of India
📍 NTR, ANDHRA PRADESH