TenderDekho Logo
Active GEM

Bids are Invited For Hydraulic Stg Presser Pipe,Dvr Co Dvr Side Glass,Door Glass LH and RH,Half shaft seal,Fly wheel sen in WEST DELHI, DELHI

Bid Publish Date

22-Aug-2026, 3:05 pm

Bid End Date

02-Sep-2026, 3:00 pm

Progress

Issue22-Aug-2026, 3:05 pm
AwardPending

Indian Army has released a public tender for Hydraulic Stg Presser Pipe, Dvr Co Dvr Side Glass, Door Glass LH and RH, Half shaft seal, Fly wheel sensor, Veh speed sensor, Self Pinon, Fuel Filter, Brake Master Cyl, Wheel cyl, Clutch Plate, Alternator Regulator Cut Out, Discharge Line Assy, AC Blower Fan Motor Assy, Door Glass Mechanism RH and LH Side, Accelerator padel sensor, Cam sensor, Oil pressure and temp sensor, Coolant temp sensor, Clutch booster assy, Clutch master cyl, Digital Meter, Beta Trolly tool Box, Cutting Plair, Wire Cutter, T Spanner 8 to 14, Condenser Fan Assy, Compressor No 72, Water Pump Fan Belt, Thermostat Valve, Radiator Cap, Head Gasket, Pre Fuel Filter, Wire Stripper, Diode 4 amp, Diode 6 amp, DC power supply, Transformer 18V, Transformer 24V, Lens opener tool set, Tweezer, Air Filter, Mounting Pad in WEST DELHI, DELHI. Quantity: 98. Submission Deadline: 02-09-2026 15: 00: 00. Download documents and apply online.

Tender Data

Bid Details

Quantity

98

Category

Hydraulic Stg Presser Pipe

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

8

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Hydraulic Stg Presser Pipe , Dvr Co Dvr Side Glass , Door Glass LH and RH , Half shaft seal , Fly wheel sensor , Veh speed sensor , Self Pinon , Fuel Filter , Brake Master Cyl , Wheel cyl , Clutch Plate , Alternator Regulator Cut Out , Discharge Line Assy , AC Blower Fan Motor Assy , Door Glass Mechanism RH and LH Side , Accelerator padel sensor , Cam sensor , Oil pressure and temp sensor , Coolant temp sensor , Clutch booster assy , Clutch master cyl , Digital Meter , Beta Trolly tool Box , Cutting Plair , Wire Cutter , T Spanner 8 to 14 , Condenser Fan Assy , Compressor No 72 , Water Pump Fan Belt , Thermostat Valve , Radiator Cap , Head Gasket , Pre Fuel Filter , Wire Stripper , Diode 4 amp , Diode 6 amp , DC power supply , Transformer 18V , Transformer 24V , Lens opener tool set , Tweezer , Air Filter , Mounting Pad

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

South West delhi

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-South West delhiSouth West delhi--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9794566.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 43 Items Sign in for GEM prices

#1

Hydraulic Stg Presser Pipe

Hydraulic Stg Presser Pipe

2 nos Delivery: 15 days
#2

Dvr Co Dvr Side Glass

Dvr Co Dvr Side Glass

2 nos Delivery: 15 days
#3

Door Glass LH and RH

Door Glass LH and RH

2 pair Delivery: 15 days
#4

Half shaft seal

Half shaft seal

5 nos Delivery: 15 days
#5

Fly wheel sensor

Fly wheel sensor

1 nos Delivery: 15 days
#6

Veh speed sensor

Veh speed sensor

1 nos Delivery: 15 days
#7

Self Pinon

Self Pinon

2 nos Delivery: 15 days
#8

Fuel Filter

Fuel Filter

1 nos Delivery: 15 days
#9

Brake Master Cyl

Brake Master Cyl

2 nos Delivery: 15 days
#10

Wheel cyl

Wheel cyl

2 nos Delivery: 15 days
#11

Clutch Plate

Clutch Plate

1 nos Delivery: 15 days
#12

Alternator Regulator Cut Out

Alternator Regulator Cut Out

1 nos Delivery: 15 days
#13

Discharge Line Assy

Discharge Line Assy

3 nos Delivery: 15 days
#14

AC Blower Fan Motor Assy

AC Blower Fan Motor Assy

1 nos Delivery: 15 days
#15

Door Glass Mechanism RH and LH Side

Door Glass Mechanism RH and LH Side

1 pair Delivery: 15 days
#16

Accelerator padel sensor

Accelerator padel sensor

2 nos Delivery: 15 days
#17

Cam sensor

Cam sensor

2 nos Delivery: 15 days
#18

Oil pressure and temp sensor

Oil pressure and temp sensor

1 nos Delivery: 15 days
#19

Coolant temp sensor

Coolant temp sensor

1 nos Delivery: 15 days
#20

Clutch booster assy

Clutch booster assy

1 nos Delivery: 15 days
#21

Clutch master cyl

Clutch master cyl

1 nos Delivery: 15 days
#22

Digital Meter

Digital Meter

1 nos Delivery: 15 days
#23

Beta Trolly tool Box

Beta Trolly tool Box

1 nos Delivery: 15 days
#24

Cutting Plair

Cutting Plair

3 nos Delivery: 15 days
#25

Wire Cutter

Wire Cutter

2 nos Delivery: 15 days
#26

T Spanner 8 to 14

T Spanner 8 to 14

1 set Delivery: 15 days
#27

Condenser Fan Assy

Condenser Fan Assy

2 nos Delivery: 15 days
#28

Compressor No 72

Compressor No 72

2 nos Delivery: 15 days
#29

Water Pump Fan Belt

Water Pump Fan Belt

2 nos Delivery: 15 days
#30

Thermostat Valve

Thermostat Valve

4 nos Delivery: 15 days
#31

Radiator Cap

Radiator Cap

3 nos Delivery: 15 days
#32

Head Gasket

Head Gasket

1 nos Delivery: 15 days
#33

Pre Fuel Filter

Pre Fuel Filter

1 nos Delivery: 15 days
#34

Wire Stripper

Wire Stripper

2 nos Delivery: 15 days
#35

Diode 4 amp

Diode 4 amp

5 nos Delivery: 15 days
#36

Diode 6 amp

Diode 6 amp

5 nos Delivery: 15 days
#37

DC power supply

DC power supply

3 nos Delivery: 15 days
#38

Transformer 18V

Transformer 18V

4 nos Delivery: 15 days
#39

Transformer 24V

Transformer 24V

4 nos Delivery: 15 days
#40

Lens opener tool set

Lens opener tool set

1 set Delivery: 15 days
#41

Tweezer

Tweezer

1 nos Delivery: 15 days
#42

Air Filter

Air Filter

10 nos Delivery: 15 days
#43

Mounting Pad

Mounting Pad

5 set Delivery: 15 days

Categories 61

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer