TenderDekho Logo
Active GEM

Open Tender for Item No. 1,Item No. 2,Item No. 3,Item No. 4,Item No. 5 in CHANDEL, MANIPUR

Bid Publish Date

29-Jul-2026, 1:43 pm

Bid End Date

19-Aug-2026, 2:00 pm

Value

₹4,96,571

Location

CHANDEL , MANIPUR

Progress

Issue29-Jul-2026, 1:43 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

72

Category

Item No. 1

Bid Type

Two Packet Bid

Categories 58

Assam Rifles announces a tender for Item No. 1, Item No. 2, Item No. 3, Item No. 4, Item No. 5 in CHANDEL, MANIPUR. Quantity: 72. Submission Deadline: 19-08-2026 14: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Item No. 1 , Item No. 2 , Item No. 3 , Item No. 4 , Item No. 5

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Delivery Details

Max Delivery Days

210

Delivery Locations

1

Delivery Cities

Chandel

Delivery Pincodes

795135

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sachu C795135,HQ 26 Sector Assam Rifles Pallel, District Chandel(Kakching), Manipur(MN)-795135ChandelManipur79513548210-

Authority Records

MINISTRY OF HOME AFFAIRS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9678076.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Item No. 1

Annual maintenance charges for split/ Window AC works with following works - (a) servicing once in a year. (b) Quarterly Preventive maintainance (c) Checking selector switch , thermostat, relays, remote controle, motor bushing, tightening of nuts & bolts, drivemotors and fans, cooling efficiency, firmness of the suppportng arraneent for the compressor, blower motor, air conditioners casing and fixing of the air conditioners etc. (d) Replacement of any component of air conditioners (Outdoor and indoor uits, inlet and outlet pipelines, electrical connections etc) found defective after the abvoe checks and tests. (e) Charging of refgrigerant gas, Oiling the motors, chemical washing

48 each Delivery: 210 days
#2

Item No. 2

The spares replaced under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Compressor (b) Running Capacitor (c) Fan Capacitor (d) Fan Motor (e) Grill (F) Chasis (G) Remote (h) Brass Pipe (j) PCB Board (k) Thermostate (l) Drain Pipe (m) Pipe insulation (m) Power Cord (m) Air Filer (n) Wall Bracket (o) Condensor of out door Unit.

1 job Delivery: 210 days
#3

Item No. 3

Installation of New split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation

4 job Delivery: 210 days
#4

Item No. 4

Dismantle of AC stand from wall, Dismantly/Fixed Front air grill, disconnect electricity supply to Air conditioner and re-installtion split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation

4 job Delivery: 210 days
#5

Item No. 5

Re-filling the AC Gas, first check the compressor, connect valve on the compressor process tube, fil Gas according to air conditioner check leakage after refill gas

15 job Delivery: 210 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Annual Turnover

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer