Bid Publish Date
29-Jul-2026, 1:43 pm
Bid End Date
19-Aug-2026, 2:00 pm
Value
₹4,96,571
Location
Progress
Quantity
72
Category
Item No. 1
Bid Type
Two Packet Bid
Assam Rifles announces a tender for Item No. 1, Item No. 2, Item No. 3, Item No. 4, Item No. 5 in CHANDEL, MANIPUR. Quantity: 72. Submission Deadline: 19-08-2026 14: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Item No. 1 , Item No. 2 , Item No. 3 , Item No. 4 , Item No. 5
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
12
Max Delivery Days
210
Delivery Locations
1
Delivery Cities
Chandel
Delivery Pincodes
795135
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sachu C | 795135,HQ 26 Sector Assam Rifles Pallel, District Chandel(Kakching), Manipur(MN)-795135 | Chandel | Manipur | 795135 | 48 | 210 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Item No. 1
Annual maintenance charges for split/ Window AC works with following works - (a) servicing once in a year. (b) Quarterly Preventive maintainance (c) Checking selector switch , thermostat, relays, remote controle, motor bushing, tightening of nuts & bolts, drivemotors and fans, cooling efficiency, firmness of the suppportng arraneent for the compressor, blower motor, air conditioners casing and fixing of the air conditioners etc. (d) Replacement of any component of air conditioners (Outdoor and indoor uits, inlet and outlet pipelines, electrical connections etc) found defective after the abvoe checks and tests. (e) Charging of refgrigerant gas, Oiling the motors, chemical washing
Item No. 2
The spares replaced under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Compressor (b) Running Capacitor (c) Fan Capacitor (d) Fan Motor (e) Grill (F) Chasis (G) Remote (h) Brass Pipe (j) PCB Board (k) Thermostate (l) Drain Pipe (m) Pipe insulation (m) Power Cord (m) Air Filer (n) Wall Bracket (o) Condensor of out door Unit.
Item No. 3
Installation of New split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation
Item No. 4
Dismantle of AC stand from wall, Dismantly/Fixed Front air grill, disconnect electricity supply to Air conditioner and re-installtion split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation
Item No. 5
Re-filling the AC Gas, first check the compressor, connect valve on the compressor process tube, fil Gas according to air conditioner check leakage after refill gas
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Item No. 1 | Annual maintenance charges for split/ Window AC works with following works - (a) servicing once in a year. (b) Quarterly Preventive maintainance (c) Checking selector switch , thermostat, relays, remote controle, motor bushing, tightening of nuts & bolts, drivemotors and fans, cooling efficiency, firmness of the suppportng arraneent for the compressor, blower motor, air conditioners casing and fixing of the air conditioners etc. (d) Replacement of any component of air conditioners (Outdoor and indoor uits, inlet and outlet pipelines, electrical connections etc) found defective after the abvoe checks and tests. (e) Charging of refgrigerant gas, Oiling the motors, chemical washing | 48 | each | 26sectengr | 210 | |
| 2 | Item No. 2 | The spares replaced under comprehensive maintenance shall be measured and paid OEM tax invoice if same company spare not avl in Market then spares will be paid on company invoice with 15% Contractor profit. (a) Compressor (b) Running Capacitor (c) Fan Capacitor (d) Fan Motor (e) Grill (F) Chasis (G) Remote (h) Brass Pipe (j) PCB Board (k) Thermostate (l) Drain Pipe (m) Pipe insulation (m) Power Cord (m) Air Filer (n) Wall Bracket (o) Condensor of out door Unit. | 1 | job | 26sectengr | 210 | |
| 3 | Item No. 3 | Installation of New split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation | 4 | job | 26sectengr | 210 | |
| 4 | Item No. 4 | Dismantle of AC stand from wall, Dismantly/Fixed Front air grill, disconnect electricity supply to Air conditioner and re-installtion split Air conditiner stand on wall, connect inlet AC assembly to Air conditioner , connect electricity supply to Air conditioner and making insect proof the wall hole with white cement and Check split AC functions after installation | 4 | job | 26sectengr | 210 | |
| 5 | Item No. 5 | Re-filling the AC Gas, first check the compressor, connect valve on the compressor process tube, fil Gas according to air conditioner check leakage after refill gas | 15 | job | 26sectengr | 210 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS