Brake disc pad camper,Brake shoe set rear for bolero,Brake drum bolero,Wheel cylinder rear assy bol
Indian Army
LEH, JAMMU & KASHMIR
Bid Publish Date
01-Nov-2025, 10:49 am
Bid End Date
13-Nov-2025, 11:00 am
Location
Progress
Quantity
108
Category
Bogie wheel for Air Marrel and MDL
Bid Type
Two Packet Bid
Ai Airport Services Limited invites bids for specialized bogie wheels and loader components, including items such as Bogie wheel for Air Marrel and MDL, LAM 7000 Loader parts, 121 model rear solid wheel, TLD Loader, and rear solid wheel. The scope covers supply, installation, testing and commissioning of the goods, with an option clause allowing quantity adjustments up to ±25%. The tender enforces service capability through a local service center in the consignee’s state and a dedicated toll-free service line, ensuring post-award support. The procurement emphasizes on-site installation and post-delivery commissioning at single or multiple locations within the state, with clear expectations for delivery timelines aligned to contract extensions.
Option clause permits ±25% quantity variation with adjusted delivery timelines
SIC scope and post-installation commissioning required
Functional service centers or establishment within 30 days of award; payment contingent on evidence
Payment to be released after submission of documentary evidence of functional service center; terms not fully detailed in data
Delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days
Not specified in provided data; ATC may include LDs in final contract
Demonstrated experience in supplying and installing bogie wheels or loader components
Evidence of functional service centers or ability to establish in consignee state within 30 days
Compliance with required support infrastructure including toll-free service and escalation matrix
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
JALPAIGURI, WEST BENGAL
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
VADODARA, GUJARAT
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Bogie wheel for Air Marrel and MDL | As per Spec | 16 | nos | [email protected] | 15 |
| 2 | LAM 7000 Loader | As per Spec | 28 | nos | [email protected] | 15 |
| 3 | 121 model rear solid wheel | As per Spec | 16 | nos | [email protected] | 15 |
| 4 | TLD Loader | As per Spec | 32 | nos | [email protected] | 15 |
| 5 | Rear solid wheel | As per Spec | 16 | nos | [email protected] | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply/installation projects
Financial statements demonstrating financial stability
EMD documentation (amount not disclosed in data, provide as per ATC)
Technical bid documentation and OEM authorization certificates
Proof of existing or planned service centers in consignee state
Extended Deadline
13-Nov-2025, 11:00 am
Opening Date
13-Nov-2025, 11:30 am
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | SUNDARAM INDUSTRIES PRIVATE LIMITED Under PMA | - | 03-11-2025 14:24:42 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SUNDARAM INDUSTRIES PRIVATE LIMITED(MII) Under PMA | ₹10,54,328 | Item Categories : Bogie wheel for Air Marrel and MDL,LAM 7000 Loader,121 model rear solid wheel,TLD Loader,Rear solid |
Please sign in or create an account to view contract details and download result documents.
Key insights about TAMIL NADU tender market
Bidders should prepare documentation including GST, PAN, experience certificates, financial statements, EMD, OEM authorizations, and details of service centers. The ATC requires SIC scope and establishment of a local service center within 30 days of award, plus a toll-free service number.
Required documents include GST certificate, PAN, company financials, experience certificates for similar projects, EMD proof, technical bid, OEM authorization, and evidence of a functional service center in the consignee state or plan to establish within 30 days.
Current data does not specify standards; bidders should await ATC for IS/ISO requirements. Prepare to demonstrate compliance with relevant quality and safety standards and provide certification for loader components as per contract.
Delivery timing follows the option clause: quantity may increase by up to 25% with the calculated extension time using the formula, minimum 30 days, and delivery period aligned to the last delivery date.
Bidders must have a dedicated toll-free service line and an escalation matrix. If no service center exists, establish one within 30 days of award and provide documentary proof before payment release.
The bidder must supply, install, test, and commission the bogie wheels and loader parts. This includes on-site checks, final acceptance testing, and handover documentation as part of post-delivery completion.
The BOQ lists five items related to bogie wheels and loader components, including rear solid wheels and 121 model wheels; exact quantities are not disclosed and may be refined during contract execution.
Bidders with proven supply and installation capability for bogie wheels and loader parts, plus the ability to establish local service centers and provide dedicated service support, are eligible to participate.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS