TenderDekho Logo
GEM

Open Tender for Supply of Hybrid EPABX System,Supply of ANALOG PHONE with CLI,Supply of IP Phone,Supply of MDF Box in LAKHIMPUR, ASSAM

Bid Publish Date

08-Oct-2025, 7:02 pm

Bid End Date

24-Oct-2025, 10:00 am

EMD

₹66,215

Value

₹33,10,774

Generate Docs

Progress

Issue08-Oct-2025, 7:02 pm
Corrigendum20-Oct-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1892

Category

Supply of Hybrid EPABX System

Bid Type

Two Packet Bid

Categories 59

Airports Authority Of India has released a public tender for Supply of Hybrid EPABX System, Supply of ANALOG PHONE with CLI, Supply of IP Phone, Supply of MDF Box 100 Pair Krone Module Loaded, Supply of MDF Box 50 Pair Krone Module Loaded, Supply of MDF Box 20 Pair Krone Module Loaded, Supply of MDF Box 10 Pair Krone Module Loaded, Supply of 2KVA Online UPS, Supply of Battery bank of minimum 30 minutes backup, Supply of ATS SWITCH for UPS, Supply of Battery Bank Rack to accommodate all batteries with top cover of anti inflammable material, Supply of EPABX Rack, Supply of CAT 6 Cable 305 Mtrs, Supply of PVC pipe for laying CAT 6 cable along with wall clamps, Supply of JELLY FILLED COPPER CABLE 10 PAIR with supply, Hard soil digging work of Depth 1 meter and Refilling and Compaction, Soft soil digging work of Depth 1 meter and Refilling and Compaction, HDPE Pipe for Jelly Filled cable laying, Supply of OFC to LAN Converters SC interface, Supply of SC SC Patch cords, Supply of SWITCH 16 Port PoE Switch, Supply of SWITCH 8 Port PoE Switch, Supply of Monitor, Supply of Desktop Computer, Installation Testing and Commissioning of above alongwith items as described in item description in LAKHIMPUR, ASSAM. Quantity: 1892. Submission Deadline: 24-10-2025 10: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Hybrid EPABX System , Supply of ANALOG PHONE with CLI , Supply of IP Phone , Supply of MDF Box 100 Pair Krone Module Loaded , Supply of MDF Box 50 Pair Krone Module Loaded , Supply of MDF Box 20 Pair Krone Module Loaded , Supply of MDF Box 10 Pair Krone Module Loaded , Supply of 2KVA Online UPS , Supply of Battery bank of minimum 30 minutes backup , Supply of ATS SWITCH for UPS , Supply of Battery Bank Rack to accommodate all batteries with top cover of anti inflammable material , Supply of EPABX Rack , Supply of CAT 6 Cable 305 Mtrs , Supply of PVC pipe for laying CAT 6 cable along with wall clamps , Supply of JELLY FILLED COPPER CABLE 10 PAIR with supply , Hard soil digging work of Depth 1 meter and Refilling and Compaction , Soft soil digging work of Depth 1 meter and Refilling and Compaction , HDPE Pipe for Jelly Filled cable laying , Supply of OFC to LAN Converters SC interface , Supply of SC SC Patch cords , Supply of SWITCH 16 Port PoE Switch , Supply of SWITCH 8 Port PoE Switch , Supply of Monitor , Supply of Desktop Computer , Installation Testing and Commissioning of above alongwith items as described in item description

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8447096.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 25 Items Sign in for GEM prices

#1

Supply of Hybrid EPABX System

Refer technical document for details

1 nos Delivery: 45 days
#2

Supply of ANALOG PHONE with CLI

Refer technical document for details

50 nos Delivery: 45 days
#3

Supply of IP Phone

Refer technical document for details

10 nos Delivery: 45 days
#4

Supply of MDF Box 100 Pair Krone Module Loaded

Refer technical document for details

1 nos Delivery: 45 days
#5

Supply of MDF Box 50 Pair Krone Module Loaded

Refer technical document for details

3 nos Delivery: 45 days
#6

Supply of MDF Box 20 Pair Krone Module Loaded

Refer technical document for details

3 nos Delivery: 45 days
#7

Supply of MDF Box 10 Pair Krone Module Loaded

Refer technical document for details

5 nos Delivery: 45 days
#8

Supply of 2KVA Online UPS

Refer technical document for details

2 nos Delivery: 45 days
#9

Supply of Battery bank of minimum 30 minutes backup

Refer technical document for details

2 set Delivery: 45 days
#10

Supply of ATS SWITCH for UPS

Refer technical document for details

1 nos Delivery: 45 days
#11

Supply of Battery Bank Rack to accommodate all batteries with top cover of anti inflammable material

Refer technical document for details

2 nos Delivery: 45 days
#12

Supply of EPABX Rack

Refer technical document for details

1 nos Delivery: 45 days
#13

Supply of CAT 6 Cable 305 Mtrs

Refer technical document for details

2 rolls Delivery: 45 days
#14

Supply of PVC pipe for laying CAT 6 cable along with wall clamps

Refer technical document for details

300 meter Delivery: 45 days
#15

Supply of JELLY FILLED COPPER CABLE 10 PAIR with supply

Refer technical document for details

500 meter Delivery: 45 days
#16

Hard soil digging work of Depth 1 meter and Refilling and Compaction

Refer technical document for details

120 meter Delivery: 45 days
#17

Soft soil digging work of Depth 1 meter and Refilling and Compaction

Refer technical document for details

380 meter Delivery: 45 days
#18

HDPE Pipe for Jelly Filled cable laying

Refer technical document for details

500 meter Delivery: 45 days
#19

Supply of OFC to LAN Converters SC interface

Refer technical document for details

2 nos Delivery: 45 days
#20

Supply of SC SC Patch cords

Refer technical document for details

2 nos Delivery: 45 days
#21

Supply of SWITCH 16 Port PoE Switch

Refer technical document for details

1 nos Delivery: 45 days
#22

Supply of SWITCH 8 Port PoE Switch

Refer technical document for details

1 nos Delivery: 45 days
#23

Supply of Monitor

Refer technical document for details

1 nos Delivery: 45 days
#24

Supply of Desktop Computer

Refer technical document for details

1 nos Delivery: 45 days
#25

Installation Testing and Commissioning of above alongwith items as described in item description

Refer technical document for details

1 nos Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Corrigendum Updates

1 Update
#1

Update

20-Oct-2025

Extended Deadline

24-Oct-2025, 10:00 am

Opening Date

24-Oct-2025, 10:30 am