TenderDekho Logo
GEM

Bharat Petroleum Corporation Ltd Water Circulation Pumps Tender Mumbai Maharashtra IS 550/ISO Standards 2026

Bid Publish Date

17-Jul-2026, 8:06 pm

Bid End Date

07-Aug-2026, 2:00 pm

EMD

₹1,18,557

Progress

Issue17-Jul-2026, 8:06 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

247

Categories 5

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for the supply and supervision of a wide range of pump systems, including WATER WASH CIRCULATION PUMPS, CAUSTIC CIRCULATION PUMPS, and various NAPHTHA handling pumps, to be executed in MUMBAI, MAHARASHTRA. The scope covers 34 items across multiple pump types, with an EMD of ₹1,18,557. The tender emphasizes price-breakup submission on GeM, and includes a 25% option clause to adjust quantities during contract execution. No detailed technical specs are listed in the public data, but bid terms require compliance with tender document terms and confidentiality protocols. This procurement targets reliable, licit suppliers capable of delivering complex process pumps and associated supervision services within BPCL’s Mumbai operations.

Technical Specifications & Requirements

  • Product categories: Water wash circulation pumps, Caustic circulation pumps, Naphtha splitter pumps (bottoms, overhead, sidedraw), Debutanizer reflux pumps, Flare KOD pumps, Closed blow down pumps, Amine blow down pumps, Caustic circulation and transfer pumps, plus supervision services.
  • EMD: ₹1,18,557.
  • No public technical specifications provided; bidders must rely on tender document and Licensor confidential documents accessed after NDA.
  • Special conditions include an option clause allowing +/- 25% quantity variation and extended delivery calculations with minimum 30 days, based on original delivery period.
  • Mandatory price-breakup in prescribed GeM format; separate priced bid only in price bid section; unpriced bid disallowed.
  • Confidential access requires Secrecy Declaration and NDA compliance with EPCM, password-protected technical MR.

Terms & Eligibility

  • EMD: ₹1,18,557 (as per tender terms).
  • Option Clause: Quantity may increase/decrease up to 25%; effects delivery period calculations.
  • Password-protected technical documents; NDA/Secrecy Declaration required prior to access.
  • Price break-up must be uploaded in the prescribed format on GeM portal.
  • In case of contradictions, Tender document terms prevail over portal data.
  • Section highlights emphasize compliance with all terms, including confidentiality and disclosure controls.

Key Specifications

  • Pump categories: Water wash circulation pumps; Caustic circulation pumps; Naphtha handling pumps (bottoms/overhead/sidedraw); Debutanizer reflux pumps; Flare KOD pumps (1 & 2); Closed blow down pumps; Amine blow down pumps; Caustic circulation & transfer pumps.

  • EMD amount: ₹1,18,557

  • Delivery terms: Option to increase quantity by 25% during contract; delivery period calculated as (Additional/Original) × Original delivery period with minimum 30 days.

  • Confidential documents: NDA/Secrecy Declaration required to access licensor confidential materials

  • Bid format: Price break-up in prescribed GeM format; separate priced bid on GeM portal; unpriced bid not allowed

Terms & Conditions

  • Option for ±25% quantity change with corresponding delivery time calculations

  • Mandatory GeM price-breakup submission; separate price bid required

  • Confidential technical documents require NDA/Secrecy Declaration and password access

Important Clauses

Payment Terms

Not disclosed in data; standard BPCL terms apply per tender document and may include progress payments upon delivery milestones

Delivery Schedule

Delivery window link to last date of original delivery order; extended period calculations apply if option clause exercised, with minimum 30 days

Penalties/Liquidated Damages

Not specified in provided data; bidders should review tender document for LD terms and penalties

Bidder Eligibility

  • Experience in supplying process pumps for refinery/chemical industry

  • Financial stability as evidenced by financial statements

  • GST registration and PAN verification

  • Compliance with NDA/secrecy and confidential document access procedures

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Supply of WATER WASH CIRCULATION PUMPS , Supervision of WATER WASH CIRCULATION PUMPS , Supply of CAUSTIC CIRCULATION PUMPS , Supervision of CAUSTIC CIRCULATION PUMPS , Supply of NAPHTHA SPLITTER BOTTOMS PUMPS , Supervision of NAPHTHA SPLITTER BOTTOMS PUMPS , Supply of NAPHTHA SPLITTER OVERHEAD PUMPS , Supervision of NAPHTHA SPLITTER OVERHEAD PUMPS , Supply of NAPHTHA SPLITTER SIDEDRAW PUMPS , Supervision of NAPHTHA SPLITTER SIDEDRAW PUMPS , Supply of DEBUTANIZER REFLUX PUMPS , Supervision of DEBUTANIZER REFLUX PUMPS , Supply of FLARE KOD PUMPS-1 , Supervision of FLARE KOD PUMPS-1 , Supply of FLARE KOD PUMPS-2 , Supervision of FLARE KOD PUMPS-2 , Supply of CLOSED BLOW DOWN PUMP , Supervision of CLOSED BLOW DOWN PUMP , Supply of AMINE BLOW DOWN PUMP , Supervision of AMINE BLOW DOWN PUMP , Supply of CAUSTIC CLOSED BLOW DOWN PUMP , Supervision of CAUSTIC CLOSED BLOW DOWN PUMP , Supply of SUSPECT CONDENSATE PUMP , Supervision of SUSPECT CONDENSATE PUMP , Supply of PURE CONDENSATE PUMP , Supervision of PURE CONDENSATE PUMP , Supply of FLUSHING OIL PUMP , Supervision of FLUSHING OIL PUMP , Supply of SEAL FLUSHING OIL PUMP , Supervision of SEAL FLUSHING OIL PUMP , Supply of STEAM BLOWDOWN PUMP , Supervision of STEAM BLOWDOWN PUMP , Supply of CAUSTIC CIRCULATION AND TRANSFER PUMPS , Supervision of CAUSTIC CIRCULATION AND TRANSFER PUMPS

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

24

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

27-07-2026 15:00:00

Pre-Bid Venue

Technip Energies India Limited, A - 4, Institutional Area, Block A, Sector 1,Noida, Uttar Pradesh 201301 Online: Preferably Via MS Teams Meeting

Delivery Details

Max Delivery Days

365

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400074

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vikram Ramkumar Gupta400074,BPCL Mumbai Refinery, Admin building, South block, Second floor, CPO RPP, Mahul, Mumbai - 400074Mumbai SuburbanMaharashtra4000742365-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 40

GeM-Bidding-9613629.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 34 Items Sign in for GEM prices

#1

Supply of WATER WASH CIRCULATION PUMPS

As per MR

2 nos Delivery: 365 days
#2

Supervision of WATER WASH CIRCULATION PUMPS

As per MR

12 manday Delivery: 1,113 days
#3

Supply of CAUSTIC CIRCULATION PUMPS

As per MR

2 nos Delivery: 365 days
#4

Supervision of CAUSTIC CIRCULATION PUMPS

As per MR

12 manday Delivery: 1,113 days
#5

Supply of NAPHTHA SPLITTER BOTTOMS PUMPS

As per MR

2 nos Delivery: 365 days
#6

Supervision of NAPHTHA SPLITTER BOTTOMS PUMPS

As per MR

12 manday Delivery: 1,113 days
#7

Supply of NAPHTHA SPLITTER OVERHEAD PUMPS

As per MR

2 nos Delivery: 365 days
#8

Supervision of NAPHTHA SPLITTER OVERHEAD PUMPS

As per MR

12 manday Delivery: 1,113 days
#9

Supply of NAPHTHA SPLITTER SIDEDRAW PUMPS

As per MR

2 nos Delivery: 365 days
#10

Supervision of NAPHTHA SPLITTER SIDEDRAW PUMPS

As per MR

12 manday Delivery: 1,113 days
#11

Supply of DEBUTANIZER REFLUX PUMPS

As per MR

2 nos Delivery: 365 days
#12

Supervision of DEBUTANIZER REFLUX PUMPS

As per MR

12 manday Delivery: 1,113 days
#13

Supply of FLARE KOD PUMPS-1

As per MR

2 nos Delivery: 365 days
#14

Supervision of FLARE KOD PUMPS-1

As per MR

12 manday Delivery: 1,113 days
#15

Supply of FLARE KOD PUMPS-2

As per MR

2 nos Delivery: 365 days
#16

Supervision of FLARE KOD PUMPS-2

As per MR

12 manday Delivery: 1,113 days
#17

Supply of CLOSED BLOW DOWN PUMP

As per MR

2 nos Delivery: 365 days
#18

Supervision of CLOSED BLOW DOWN PUMP

As per MR

12 manday Delivery: 1,113 days
#19

Supply of AMINE BLOW DOWN PUMP

As per MR

2 nos Delivery: 365 days
#20

Supervision of AMINE BLOW DOWN PUMP

As per MR

18 manday Delivery: 1,113 days
#21

Supply of CAUSTIC CLOSED BLOW DOWN PUMP

As per MR

2 nos Delivery: 365 days
#22

Supervision of CAUSTIC CLOSED BLOW DOWN PUMP

As per MR

12 manday Delivery: 1,113 days
#23

Supply of SUSPECT CONDENSATE PUMP

As per MR

3 nos Delivery: 365 days
#24

Supervision of SUSPECT CONDENSATE PUMP

As per MR

12 manday Delivery: 1,113 days
#25

Supply of PURE CONDENSATE PUMP

As per MR

3 nos Delivery: 365 days
#26

Supervision of PURE CONDENSATE PUMP

As per MR

12 manday Delivery: 1,113 days
#27

Supply of FLUSHING OIL PUMP

As per MR

2 nos Delivery: 365 days
#28

Supervision of FLUSHING OIL PUMP

As per MR

12 manday Delivery: 1,113 days
#29

Supply of SEAL FLUSHING OIL PUMP

As per MR

2 nos Delivery: 365 days
#30

Supervision of SEAL FLUSHING OIL PUMP

As per MR

12 manday Delivery: 1,113 days
#31

Supply of STEAM BLOWDOWN PUMP

As per MR

3 nos Delivery: 365 days
#32

Supervision of STEAM BLOWDOWN PUMP

As per MR

12 manday Delivery: 1,113 days
#33

Supply of CAUSTIC CIRCULATION AND TRANSFER PUMPS

As per MR

2 nos Delivery: 365 days
#34

Supervision of CAUSTIC CIRCULATION AND TRANSFER PUMPS

As per MR

12 manday Delivery: 1,113 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Certificate

2

PAN Card

3

Experience Certificates

4

Financial Statements

5

EMD/Security Deposit documents

6

Technical bid documents

7

OEM Authorizations (if applicable)

8

Secrecy Declaration/NDA (as required)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid in BPCL water pumps tender in Mumbai 2026

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹1,18,557. Upload the mandatory price-breakup in the prescribed GeM format and maintain separate priced bid. Access to confidential docs requires NDA/secrecy declaration; follow option clause for quantity changes up to 25%.

What documents are required for BPCL pump tender in Mumbai

Required documents include GST registration, PAN, experience certificates for similar pumps, financial statements, EMD submission, technical bid documents, OEM authorizations if applicable, and NDA/secrecy declarations for confidential materials.

What are the technical pump categories in BPCL Mumbai tender

Categories cover water wash circulation pumps, caustic circulation pumps, naptha splitter pumps (bottoms/overhead/sidedraw), debutanizer reflux pumps, flare KOD pumps, closed blow down pumps, amine blow down pumps, and caustic circulation and transfer pumps, plus supervision services.

When is delivery required for BPCL pump procurement in Mumbai 2026

Delivery timing is tied to the original delivery order; if quantities are increased under the option clause, the additional time is calculated as (additional/original) × original period, with a minimum of 30 days.

What is the EMD amount for BPCL pump tender in Mumbai

The EMD amount is ₹1,18,557, payable per tender terms. Ensure submission with the bid and compliance with GeM portal requirements, including the price-breakup format.

What standards or confidentiality terms apply to BPCL pump tender

Confidential licensor documents require NDA/secrecy declaration; access is password-protected and shared only with compliant bidders. In case of conflicts between portal and tender data, the tender document terms prevail.

How to prepare price break-up for BPCL Mumbai tender

Prepare a line-item price break-up in the prescribed GeM format, ensuring all items’ costs, taxes, and delivery charges are clearly itemized. The unpriced bid will be rejected, and prices must remain within the contract framework.