LC to E2K OFC patch cord,Optical Termination Box with 12 pigtails,CAT 6 Cable UTP Cable,E2000 conne
Indian Navy
Bid Publish Date
24-Apr-2025, 11:36 am
Bid End Date
15-May-2025, 12:00 pm
EMD
₹17,000
Location
Progress
RAQuantity
11615
Bid Type
Two Packet Bid
Indian Navy announces a tender for OFC cable 24 core, 24 port LIU, HDPE pipe, SC LC, UTP cat 6, Casing cap, PVC pipe, UTP patch, wall mount rack, Single information outlet, Pig tails, OFC route markers, Digging, Digging hard, Horizontal drilling, Single mode OFC, Laying of OFC cable, Laying of HDPE pipe, Fixing of I O boxes, Laying UTP cable, Laying casing and capping, Fixing of rack, Fixing of OFC route markers, Fixing of jack panel, Supply single mode transceiver, SC SC fiber patch in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 11615. Submission Deadline: 15-05-2025 12: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Navy
Indian Navy
Dg Armed Forces Medical Service
LEH, JAMMU & KASHMIR
Controller General Of Defence Accounts
HYDERABAD, TELANGANA
Indian Army
BANGALORE, KARNATAKA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | OFC cable 24 core | Single mode OFC cable 24 core | 975 | nos | tpw.am | 90 |
| 2 | 24 port LIU | 24 port LIU fully load rack mount | 2 | nos | tpw.am | 90 |
| 3 | HDPE pipe | HDPE pipe 32mm | 975 | mtr | tpw.am | 90 |
| 4 | SC LC | SC LC single mode fiber patch cord | 10 | nos | tpw.am | 90 |
| 5 | UTP cat 6 | UTP cat 6 cable | 1,530 | mtr | tpw.am | 90 |
| 6 | Casing cap | Casing and Capping 1.2 inches | 650 | mtr | tpw.am | 90 |
| 7 | PVC pipe | PVC Pipe 1 inches | 600 | mtr | tpw.am | 90 |
| 8 | UTP patch | UTP patch cord 1 mtrs | 30 | nos | tpw.am | 90 |
| 9 | UTP patch | UTP patch cord 3 mtrs | 30 | nos | tpw.am | 90 |
| 10 | UTP patch | UTP patch jack panel 24 port | 3 | nos | tpw.am | 90 |
| 11 | wall mount rack | wall mount rack 12U | 2 | nos | tpw.am | 90 |
| 12 | Single information outlet | single mode OFC | 30 | nos | tpw.am | 90 |
| 13 | Pig tails | Pig tail single mode 1.5 mtrs | 192 | nos | tpw.am | 90 |
| 14 | OFC route markers | OFC route markers | 5 | nos | tpw.am | 90 |
| 15 | Digging | Digging of soft soil 3ft depth | 600 | mtrs | tpw.am | 90 |
| 16 | Digging hard | Digging of hard soil 3ft depth | 375 | mtrs | tpw.am | 90 |
| 17 | Horizontal drilling | Horizontal drilling Aruing | 630 | mtrs | tpw.am | 90 |
| 18 | Single mode OFC | Single mode OFC splicing | 192 | mtrs | tpw.am | 90 |
| 19 | Laying of OFC cable | laying of OFC cable | 975 | mtrs | tpw.am | 90 |
| 20 | Laying of HDPE pipe | Laying of HDPE pipe | 975 | mtrs | tpw.am | 90 |
| 21 | Fixing of I O boxes | Fixing of I O boxes | 30 | nos | tpw.am | 90 |
| 22 | Laying UTP cable | Laying UTP cable through conduit | 1,530 | mtrs | tpw.am | 90 |
| 23 | Laying casing and capping | Laying casing and capping and PVC pipe | 1,250 | mtrs | tpw.am | 90 |
| 24 | Fixing of rack | Fixing of rack | 2 | nos | tpw.am | 90 |
| 25 | Fixing of OFC route markers | Fixing of OFC route markers | 5 | nos | tpw.am | 90 |
| 26 | Fixing of jack panel | Fixing of Jack panel | 3 | nos | tpw.am | 90 |
| 27 | Supply single mode transceiver | Supply of single mode transceiver SFP 10 100 100 MBPS | 4 | nos | tpw.am | 90 |
| 28 | SC SC fiber patch | SC SC fiber patch cords single mode | 10 | nos | tpw.am | 90 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
06-Feb-2026, 5:00 pm
End
07-Feb-2026, 5:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Key insights about ANDHRA PRADESH tender market
The eligibility requirements include being a registered entity, possessing relevant experience in supplying and installing networking infrastructure, and compliance with local regulations. Bidders must demonstrate their financial viability through supporting documents.
Participants are required to submit several certificates including their company registration, GST compliance, and technical specifications of the products offered. Quality standards documentation that provides evidence of meeting or exceeding industry standards is also necessary.
Registration for this tender typically requires filling out specific forms and uploading necessary documentation online through the designated procurement platform. Each participant should ensure that they meet all compliance requirements before submission.
Yes, successful bidders are required to furnish a performance security after being awarded the contract. This security aims to ensure completion of contractual obligations and will be detailed further in the received contract documentation.
MSEs and startups are provided with special guidelines that allow for support during the bidding process. These include financial concessions, assistance with compliance, and opportunities to partake in government projects, thereby promoting local businesses and adhering to Make in India policies.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS