Bid Publish Date
17-Aug-2026, 11:23 am
Bid End Date
01-Sep-2026, 12:00 pm
Location
Progress
Organization: Iisco Steel Plant, a unit of Steel Authority of India Limited (SAIL). Product/Service: Custom bid for services including handling, re-strapping, loading/unloading, and despatch of re-strapped coils at the WRM Despatch area (5 meter floor). No BOQ items or quantified scope published; no start/end dates or estimated value disclosed. Key differentiators include a 25% contract quantity/duration variation clause, applicability of MSE/Make in India policy, and adherence to SAIl-S1 General Conditions. The ATC documents are applicable and a purchase preference framework is noted. Tender sensitivity is high for safety-critical coil handling on the 5m floor. Unique scope involves WRM Despatch area operations and peripheral jobs at the specified level.
Key Term 1: 25% variation in contract quantity/duration allowed
Key Term 2: MSE preference and Make in India guidelines applicable
Key Term 3: SAIl-S1 General Conditions of Contract and ATC clauses govern tender
Payment terms to be finalized per ATC/SAIL-S1; exact percentages and milestones not disclosed in available data
Delivery timelines to be defined in ATC; no explicit schedule published for coil handling/despatch services
LD provisions, if any, to be specified in SAIl-S1 and ATC; no explicit LD rates in current data
Preference for MSE bidders under extant policy
Compliance with Make in India requirements
Experience in coil handling, strapping, loading/unloading, or despatch operations
Quantity
1
Similar Category
Customized AMC/CMC for Pre-owned Products
Bid Type
Two Packet Bid
Bid Validity
150 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
5 Days
EMD Required
No
MII Compliance
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
16
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Custom Bid for Services - Handling Re Strapping Loading Unloading Despatch Of Re Strapped Coils WRM Despatch Area And Misc Peripheral Jobs At 5 Meter Floor Of WRM
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713325
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ravindra Neeraj | 713325,IISCO Steel Plant | Paschim Bardhaman | West Bengal | 713325 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for coil handling/logistics services
Financial statements (audited, where applicable)
Proof of EMD/Security deposit as per ATC
Technical bid documents and compliance certificates
OEM authorizations or vendor registrations, if applicable
Any safety or occupational health certifications relevant to coil handling
Key insights about WEST BENGAL tender market
Bidders must submit GST, PAN, experience credentials, financial statements, and EMD as per ATC. The tender follows SAIl-S1 terms; MSE/MII preferences apply. Ensure compliance with 25% variation rights in contract quantity/duration and attach OEM authorizations if required. Review ATC for site-specific safety standards and submission steps.
Submit GST registration, PAN, company/experience certificates for coil handling, audited financial statements, EMD/security deposit, technical compliance certificates, and any OEM authorizations. ATC may add site-specific safety documents; ensure inclusion with the bid package.
No detailed coil-specifications are provided in the available data. Bidders should prepare for general safety-compliant handling, re-strapping, and despatch operations at the WRM Despatch 5 Meter Floor, aligned with SAIl-S1 terms and ATC guidance.
Exact delivery schedule is not published in the available data. Final timeline will be defined in the ATC and SAIl-S1 General Conditions; bidders should plan for readiness to mobilize at short notice per contract terms.
EMD details are not disclosed in the current data; bidders must verify the ATC for the precise EMD amount, payment method, and submission deadline, ensuring compliance with MOEA/MSME policy if applicable.
While specific coil-handling certifications are not listed, bidders should maintain general safety certifications, GST/PAN validity, and any OEM authorizations if required by ATC. Ensure compliance with SAIl-S1 and site safety norms for despatch operations.
Bid submissions should factor potential scope changes up to 25% in quantity or duration at contract award, with proviso for consent for lumpsum-based services. Prepare scalable staffing and materials plans to accommodate up to one-quarter variation.
Make in India guidelines apply to eligibility and vendor selection, prioritizing domestic manufacturers and service providers. Include local procurement evidence, relevant certifications, and domestic supply capabilities in the bid package to maximize discount/priority.