TenderDekho Logo
Active GEM

Bharat Electronics Limited Laser Energy Meter Tender Pune Maharashtra 2104649364-10-446084410144 2026

Bid Publish Date

24-Oct-2026, 4:40 pm

Bid End Date

03-Nov-2026, 5:00 pm

Progress

Issue24-Oct-2026, 4:40 pm
AwardPending

Key Highlights

  • • BEL procurement for Laser Energy Meter in Pune with defence production alignment
  • • Option clause enabling quantity variation up to 25% during and after contract
  • • OEM manufacturer authorization required for distributor bids
  • • GST invoicing and GST portal payment confirmation mandatory on GeM

Tender Overview

Bharat Electronics Limited (BEL), operating under the Department of Defence Production, invites bids for the procurement of a Laser Energy Meter under the project code 2104649364_10_446084410144 in Pune, Maharashtra. The scope encompasses Supply, Installation, Testing and Commissioning of the equipment. The tender notes an option to adjust quantities by up to 25% during contract execution, with delivery timelines linked to the original order date and extended periods. The presence of an OEM authorization requirement and GST considerations are explicitly called out. With no BOQ items published, bidders must rely on the stated scope and terms to structure their proposal. This opportunity targets suppliers capable of delivering integrated energy metering solutions compliant with defence sector procurement norms and BEL’s internal ATC clauses. Key differentiators include the extension mechanism for quantity adjustments and GST handling guidance, alongside a need for proper manufacturer authorization when bidding through distributors. This tender’s unique aspect is its combination of supply, installation, and commissioning under a single contract within a defence production framework in Pune.

Technical Specifications & Requirements

  • Product category: Laser Energy Meter (BEL internal procurement code 2104649364_10_446084410144).
  • Scope: Supply, Installation, Testing and Commissioning of the laser energy metering solution.
  • Delivery terms: Option to increase quantity by 25% during contract, with extended delivery periods calculated as (increased/original) × original delivery period, minimum 30 days.
  • Compliance notes: GST implications to be borne by bidder; GST paid as actuals or capped to the quoted rate.
  • Authorisation: OEM authorization required when bid submitted via authorised distributor.
  • ATC: GeM-related terms apply; emphasis on timely delivery and contract termination safeguards.
  • BOQ: No items listed in the publicly available BOQ; bidders must prepare offerings based on the stated scope and compliance expectations.
  • Delivery location: Pune, Maharashtra.
  • Payment considerations: GST invoice and GST portal screenshot to be uploaded during GeM invoicing.
  • Quality/standards: Not explicitly specified in data; bidders should seek alignment with Defence Production procurement norms and BEL’s internal ATC expectations.

Terms, Conditions & Eligibility

  • EMD/Performance: Not disclosed in available data; bidders must verify at bid submission.
  • Delivery timeline: Original delivery period; option-based extensions as per clause 1.
  • GST: Bidder to manage GST; reimbursement as actuals or at quoted rate, whichever is lower.
  • Manufacturer Authorization: Required when submitting via Authorized Distributor; submit OEM details with bid.
  • Scope clarity: Contract covers supply, installation, testing, and commissioning; no separate BOQ items.
  • Contract termination triggers: Failure to deliver, misrepresentation, or insolvency scenarios allow contract termination.
  • Invoicing: Upload GST invoice scan and GST portal payment confirmation on GeM.
  • Compliance: Bidders must adhere to BEL ATC and Defence Production procurement norms.

Key Specifications

  • Laser Energy Meter: product category title extracted from tender

  • Quantity/Value: not explicitly specified; scope includes Supply, Installation, Testing and Commissioning

  • EMD/Estimated value: not disclosed in available data

  • Experience: refer to defence procurement norms; OEM authorization required when applicable

  • Quality/Compliance: BEL ATC; GST compliance; GeM invoicing requirements

Terms & Conditions

  • Option to increase quantity by up to 25% during contract and extended delivery periods

  • GST handling: bidder bears GST; reimbursement as actuals or capped to quoted rate

  • OEM authorization required for distributor bids; ensure manufacturer details included

  • Supply, installation, testing and commissioning included in contract scope

Important Clauses

Payment Terms

GST invoice and GST portal payment confirmation must be uploaded on GeM; reimbursement guidelines per actuals or capped quoted rate

Delivery Schedule

Original delivery period governs; option-derived extensions calculated by (increased/original) × original delivery period with a minimum of 30 days

Penalties/Liquidated Damages

Contract termination rights if supplier fails to deliver or misrepresents; no explicit LD rate disclosed in provided data

Bidder Eligibility

  • Proven capability in delivering laser energy meters or similar defence-grade metering equipment

  • Authorized OEM authorization if bidding via a distributor

  • GST registration and valid tax compliances

  • Financial stability evidenced by annual turnover and cash flow statements

Advertisement

Tender Data

Bid Details

Quantity

12

Bid Type

Two Packet Bid

Bid Validity

100 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

LASER ENERGY METER_ 2104649364_ 10_ 446084410144

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

PUNE CITY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PUNE CITYPUNE CITY--1290-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENTBHARAT ELECTRONICS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10077976.pdf

Main Document

Technical Specification/Buyer Specification Document

TECHNICAL

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar laser energy metering projects

4

Financial statements demonstrating financial capability

5

EMD/Security deposit details (if applicable) and instrument

6

Technical bid documents demonstrating compliance to laser energy meter specs

7

OEM authorization certificate if bidding through authorized distributor

8

GST invoice upload capability and GST portal screenshots

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the laser energy meter tender in Pune BEL 2026

Bidders should submit GST registration, PAN, experience certificates, financial statements, OEM authorization if bidding through an authorized distributor, and technical compliance documents. Ensure the bid includes supply, installation, testing and commissioning. Comply with GeM invoice upload and GST portal screenshot requirements for payment.

What documents are required for the BEL laser meter tender in Maharashtra

Required documents include GST certificate, PAN, experience certificates for similar projects, financial statements, EMD details if applicable, OEM authorization if bidding through a distributor, and technical bid showing compliance with laser energy meter specifications and installation capabilities.

What are the delivery and quantity extension terms for BEL Pune tender

Quantity can be increased up to 25% during contract; delivery period extends proportionally: (increased/original) × original period, with minimum extension of 30 days. If original period is under 30 days, extension equals the original period.

Which GST requirements apply to the Bel laser energy meter bid in 2026

Bidder bears GST obligations; reimbursement will be as actuals or at the quoted GST rate, whichever is lower. Upload scanned GST invoice and GST portal payment confirmation on GeM during invoicing.

What is the scope of supply for the BEL laser energy meter project

Scope includes Supply, Installation, Testing and Commissioning of the laser energy meter system. No separate BOQ items are published; bidders must align proposals to the stated scope and ensure OEM authorization if required.

What are the termination conditions for the BEL Pune tender

BEL may terminate the contract for non-compliance with terms, failure to deliver, insolvency, misrepresentation, or failure to rectify defects; authorities may terminate with written notice if performance is jeopardized or delivery cannot be ensured.

What authentication is required for distributor bids on this BEL tender

Distributor bids require OEM authorization with details: name, designation, address, email, and phone. Ensure the manufacturer’s authorization supports the scope of supply, installation, testing and commissioning in Pune.

What standards or compliance should bidders reference for BEL laser meters

Refer to Defence Production procurement norms and BEL ATC requirements; while explicit numerical standards are not listed, align with general defence-grade energy metering practices and ensure GST and GeM invoicing compliance.

Advertisement