TenderDekho Logo
GEM

Contract Bidding Open For Supply Peristaltic pump with Discharge Head of at least 50 meters and Flow Rate at least 90 liters in TIRUNELVELI, TAMIL NADU

Bid Publish Date

19-Jun-2025, 10:11 am

Bid End Date

28-Jul-2025, 11:00 am

EMD

₹1,54,533

Latest Corrigendum Available

Progress

Issue19-Jun-2025, 10:11 am
Corrigendum21-Jul-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

137

Category

Supply Peristaltic pump with Discharge Head of at least 50 meters and Flow Rate at least 90 liters per hour and materials of construction as per attached technical specifications

Bid Type

Two Packet Bid

Categories 26

Nuclear Power Corporation Of India Limited has released a public tender for Supply Peristaltic pump with Discharge Head of at least 50 meters and Flow Rate at least 90 liters per hour and materials of construction as per attached technical specifications, Shaft seal for the pump in the description in item no. 1, Insert Stainless Steel for the pump in the description in item no. 1, Cover seal for the pump in the description in item no. 1, taper lock for the pump in the description in item no. 1, Gear- motor drive assembly for the pump in the description in item no. 1, Peristaltic hose for the pump in the description in item no. 1, Lubricant glycerine for the pump mentioned in item no. 1 in TIRUNELVELI, TAMIL NADU. Quantity: 137. Submission Deadline: 28-07-2025 11: 00: 00. Download documents and apply online.

Documents 7

GeM-Bidding-7943765.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Peristaltic Pump

Indian Space Research Organization

THIRUVANANTHAPURAM, KERALA

Posted: 3 February 2025
Closed: 10 February 2025
GEM

Peristaltic Pump

Bhabha Atomic Research Centre

MUMBAI, MAHARASHTRA

Posted: 24 September 2025
Closed: 4 October 2025
GEM

Gujarat Science & Technology Department Peristaltic Pump Tender Gandhi Nagar Gujarat 2025

N/a

GANDHI NAGAR, GUJARAT

Posted: 1 January 2026
Closed: 13 January 2026
GEM

Peristaltic Pump

Indian Institute Of Technology (iit)

Posted: 26 November 2024
Closed: 17 December 2024
GEM

Peristaltic Pump

Directorate Of Purchase And Stores

MUMBAI, MAHARASHTRA

Posted: 26 March 2025
Closed: 8 April 2025
GEM

Bill of Quantities (BOQ) 8 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Supply Peristaltic pump with Discharge Head of at least 50 meters and Flow Rate at least 90 liters per hour and materials of construction as per attached technical specifications Supply Peristaltic pump with Discharge Head of at least 50 meters and Flow Rate at least 90 liters per hour and materials of construction as per attached technical specifications 6 nos con6.npcil.ten 90
2 Shaft seal for the pump in the description in item no. 1 Shaft seal for the pump in the description in item no. 1 6 nos con6.npcil.ten 90
3 Insert Stainless Steel for the pump in the description in item no. 1 Insert Stainless Steel for the pump in the description in item no. 1 3 nos con6.npcil.ten 90
4 Cover seal for the pump in the description in item no. 1 Cover seal for the pump in the description in item no. 1 3 nos con6.npcil.ten 90
5 taper lock for the pump in the description in item no. 1 taper lock for the pump in the description in item no. 1 3 nos con6.npcil.ten 90
6 Gear- motor drive assembly for the pump in the description in item no. 1 Gear- motor drive assembly for the pump in the description in item no. 1 1 nos con6.npcil.ten 90
7 Peristaltic hose for the pump in the description in item no. 1 Peristaltic hose for the pump in the description in item no. 1 75 nos con6.npcil.ten 90
8 Lubricant glycerine for the pump mentioned in item no. 1 Lubricant glycerine for the pump mentioned in item no. 1 40 liter con6.npcil.ten 90

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

21-Jul-2025

Extended Deadline

28-Jul-2025, 11:00 am

Opening Date

28-Jul-2025, 11:30 am

Frequently Asked Questions

Key insights about TAMIL NADU tender market

What are the eligibility requirements for participating in this tender?

The eligibility requirements include being a legally registered entity with a proven track record in supplying similar equipment. Bidders must submit documentation verifying their experience, compliance with industry standards, and any additional certifications as necessary.

What technical specifications must the peristaltic pump comply with?

The technical specifications for the pump require a discharge head of at least 50 meters and a flow rate of at least 90 liters per hour. The materials used in construction must meet the standards specified in the tender documents, including stainless steel components and specific sealing mechanisms.

What are the performance security requirements associated with the tender?

Performance security, often a percentage of the contract value, is typically required to ensure compliance with the terms of the contract. Specific details about the performance security requirements can be found in the tender documentation.

What submission methods are accepted for tender documentation?

Bidders must submit all documentation electronically via the designated online portal. Detailed guidance regarding acceptable formats and submission protocols is outlined in the tender documents to ensure compliance.

What benefits are available for Micro, Small, and Medium Enterprises (MSEs) under this tender?

MSEs may benefit from exemptions or preferential treatment during the evaluation process, along with simplified compliance frameworks in line with government policies aimed at encouraging participation from smaller businesses in public procurement.