GEM Portal AV & Conference Equipment Tender Srinagar Jammu & Kashmir 2025 - ISI/ISO Standards & Service Centre Criteria
N/a
SRINAGAR, JAMMU & KASHMIR
Bid Publish Date
30-Jan-2026, 10:44 am
Bid End Date
27-Feb-2026, 3:00 pm
EMD
₹21,50,000
Location
Progress
Quantity
20
Category
SITC of IP and OP electrical Panel
Bid Type
Two Packet Bid
Indian Institute Of Technology (iit) announces a tender for SITC of IP and OP electrical Panel, SITC of 750 KVA DG Set with Synchronization panels, SITC of LT cables for electrical works as per, SITC of BBT with tape up kit for new Rack setup and additional future 10XSmart Rack expansion, SITC of General civil construction works as per, SITC of Fire safety security system as, SITC of 3TR Wall mount PAC System with lo as per, SITC of 2TR Wall mount PAC System with low side work for UPS and, SITC of 300kVA Modular UPS scalable up to 600kVA UPS with 10 to 15min backup on 300kVA Load, SITC of 150kVA Modular UPS scalable up to 300kVA UPS with, SITC of 08 Nos of Integrated Smart Rack DC for Medium density load 10kW per Rack, SITC of 06 Nos of Integrated Smart Rack DC for High density load, SITC of DCIM software with 100 device perpetual, SITC of IP based CCTV surveillance system for Data Centre and, Deployment of one dedicated onsite engineer for in INDORE, MADHYA PRADESH. Quantity: 20. Submission Deadline: 27-02-2026 15: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
SRINAGAR, JAMMU & KASHMIR
Indian Navy
KANCHIPURAM, TAMIL NADU
Airports Authority Of India
CHENNAI, TAMIL NADU
National Institute Of Technology (nit)
EAST KHASI HILLS, MEGHALAYA
Airports Authority Of India
CENTRAL DELHI, DELHI
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SITC of IP and OP electrical Panel | for UPS and power as per BOQ technical | 1 | lot | swapnils@iiti | 180 |
| 2 | SITC of 750 KVA DG Set with Synchronization panels | as per BOQ technical annexure | 1 | no | swapnils@iiti | 180 |
| 3 | SITC of LT cables for electrical works as per | BOQ/technical annexure/SoW | 1 | lot | swapnils@iiti | 180 |
| 4 | SITC of BBT with tape up kit for new Rack setup and additional future 10XSmart Rack expansion | as per BOQ/technical annexure/SoW | 1 | lot | swapnils@iiti | 180 |
| 5 | SITC of General civil construction works as per | BOQ/technical annexure/SoW | 1 | lot | swapnils@iiti | 180 |
| 6 | SITC of Fire safety security system as | per BOQ/technical annexure/SoW | 1 | lot | swapnils@iiti | 180 |
| 7 | SITC of 3TR Wall mount PAC System with lo as per | BOQ/technical annexure/SoW side work for UPS and Battery room | 2 | nos | swapnils@iiti | 180 |
| 8 | SITC of 2TR Wall mount PAC System with low side work for UPS and | Battery room as per BOQ/technical annexure/SoW | 4 | nos | swapnils@iiti | 180 |
| 9 | SITC of 300kVA Modular UPS scalable up to 600kVA UPS with 10 to 15min backup on 300kVA Load | using Lithium battery bank. as per BOQ/technical annexure/SoW | 2 | nos | swapnils@iiti | 180 |
| 10 | SITC of 150kVA Modular UPS scalable up to 300kVA UPS with | Minimum 20 Minutes batteries Backup at 150kW load | 1 | no | swapnils@iiti | 180 |
| 11 | SITC of 08 Nos of Integrated Smart Rack DC for Medium density load 10kW per Rack | with low side work as per BOQ/technical annexure/SoW | 1 | lot | swapnils@iiti | 180 |
| 12 | SITC of 06 Nos of Integrated Smart Rack DC for High density load | (20kW per Rack) with low side work | 1 | lot | swapnils@iiti | 180 |
| 13 | SITC of DCIM software with 100 device perpetual | license as per BOQ/technical annexure/SoW | 1 | no | swapnils@iiti | 180 |
| 14 | SITC of IP based CCTV surveillance system for Data Centre and | UPS Room as per BOQ/technical annexure/SoW | 1 | lot | swapnils@iiti | 180 |
| 15 | Deployment of one dedicated onsite engineer for | 5 years from OEM/Vendor as per BOQ/technical annexure/SoW | 1 | person | swapnils@iiti | 180 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS