Bid Publish Date
30-Dec-2025, 4:41 pm
Bid End Date
03-Feb-2026, 5:00 pm
Progress
Quantity
1794
Category
EL4977B-G25-3247-4
Bid Type
Single Packet Bid
The Indian Navy invites bids for multiple EL4977B-series items under a centralized government procurement framework. The opportunity involves up to 30 distinct items with unspecified exact quantities, with an estimated contract value not disclosed. The procurement site emphasizes detailed design drawings approval, data sheet verification, and non-obsolescence as core bid prerequisites. A key differentiator is the option clause enabling up to 50% quantity variation at contracted rates, plus a structured delivery timeline linked to the original delivery period and extended periods. This tender targets suppliers capable of timely fabrication and alignment with buyer-approved drawings, with GST considerations addressed by bidders.
The buyer mandates rigorous data-sheet conformance and alignment with provided product specifications; any mismatch can lead to bid rejection. The process requires pre-award technical alignment and post-award design validation, ensuring conformity with the Indian Navy’s safety and engineering standards. The tender is positioned within a complex defense procurement ecosystem that prioritizes traceability, document integrity, and compliance with vendor-code creation prerequisites.
EL4977B-series items across 30 total items
Data Sheet uploaded and matched to bid
21-day draw-up submission; 15-day modification list response
GST applicability, actuals vs quoted rates
Minimum 2-year residual market life; not end-of-life
Option clause: up to 50% quantity variation; delivery extension formula
Delivery may be adjusted for drawing delays; no liquidated damages for buyer-delayed approvals
Up to 50% quantity variation allowed; rates at contracted prices
Bidder must provide complete GST, PAN, bank EFT, and vendor-code documents
GST reimbursement as actuals or applicable rate, whichever is lower; in line with quoted GST percentage
Delivery period adjusted if buyer delays drawing approval; minimum 30 days added when extending delivery
LD not specified; penalties tied to delay remedies via delivery period re-fixation
No liquidation or bankruptcy proceedings; provide undertaking
Not end-of-life product; minimum 2-year residual life
GST registration and PAN; EFT Mandate; vendor-code readiness
Main Document
BOQ
BOQ
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | EL4977B-G25-3247-4 | O RING | 2 | no | cwh_sss_sh09 | 180 |
| 2 | EL4977B-G25-8008-5 | SPECIAL WASHER -DIA 17 | 570 | no | cwh_sss_sh09 | 180 |
| 3 | EL4977B-G25-8014-19 | HEX.HD BOLT M12 x45 | 408 | no | cwh_sss_sh09 | 180 |
| 4 | EL4977B-SPE0101185221 | SYNCHROSCOPE SQ96 RISHABH 0015 | 2 | no | cwh_sss_sh09 | 180 |
| 5 | EL4977B-SPE0101185384 | AKCC 160 | 183 | no | cwh_sss_sh09 | 180 |
| 6 | EL4977B-CS91625BOOO | AUX.CONTACTOR MO 0AC 2NO-2NC CONTACTOR-240V COIL | 23 | no | cwh_sss_sh09 | 180 |
| 7 | EL4977B-G2-6030-4 | MOTOR PROTECTION RELAY | 201 | no | cwh_sss_sh09 | 180 |
| 8 | EL4977B-G2-6030-7 | MCB-DOUBLE POLE | 128 | no | cwh_sss_sh09 | 180 |
| 9 | EL4977B-G25-1112 | CLADDING 995 L | 54 | no | cwh_sss_sh09 | 180 |
| 10 | EL4977B-G25-1312L | CLADDING 492 L | 12 | no | cwh_sss_sh09 | 180 |
| 11 | EL4977B-G25-1312R | CLADDING 492 L | 11 | no | cwh_sss_sh09 | 180 |
| 12 | EL4977B-G25-1412L | CLADDING 478 L | 12 | no | cwh_sss_sh09 | 180 |
| 13 | EL4977B-G25-1412R | CLADDING 478 L | 9 | no | cwh_sss_sh09 | 180 |
| 14 | EL4977B-G25-2437-1 | O-RING ID-79.6 X 5 OR5008000-BUSAK | 2 | no | cwh_sss_sh09 | 180 |
| 15 | EL4977B-G25-2437-2 | O-RING ID-94.5 X 5 OR5009500-BUSAK | 4 | no | cwh_sss_sh09 | 180 |
| 16 | EL4977B-G25-2437-3 | O-RING ID-69.6 X 5 OR5007000-BUSAK | 2 | no | cwh_sss_sh09 | 180 |
| 17 | EL4977B-G25-5306-1 | INNER O - RING | 4 | no | cwh_sss_sh09 | 180 |
| 18 | EL4977B-G25-5306-2 | OUTER O - RING | 4 | no | cwh_sss_sh09 | 180 |
| 19 | EL4977B-G25-7418 | GUIDE WHEEL ASSEMBLY | 26 | no | cwh_sss_sh09 | 180 |
| 20 | EL4977B-G39-1050 | SLAT-2 | 2 | no | cwh_sss_sh09 | 180 |
| 21 | EL4977B-G39-3250-1 | BEARING FOR MOTOR | 12 | no | cwh_sss_sh09 | 180 |
| 22 | EL4977B-G57-1610 | END LOCK BRACKET-3 | 3 | no | cwh_sss_sh09 | 180 |
| 23 | EL4977B-G57-8028-1 | ROLLER | 25 | no | cwh_sss_sh09 | 180 |
| 24 | EL4977B-SPE0101184096 | PROTECTION AND PARALLELING UNIT. PPU 3 | 4 | no | cwh_sss_sh09 | 180 |
| 25 | EL4977B-G39-3004 | BEARING - 29412 E | 1 | no | cwh_sss_sh09 | 180 |
| 26 | EL4977B-G83-40013 | LOCK NUT M50 X 1.5 | 10 | no | cwh_sss_sh09 | 180 |
| 27 | EL4977B-G83-8007-4 | SPRING LOCK WASHER 8 IS-2016 | 15 | no | cwh_sss_sh09 | 180 |
| 28 | EL4977B-G83-8012-15 | M8 X 18 LG CSK HEAD SCREW WITH HEX.SOCKET | 10 | no | cwh_sss_sh09 | 180 |
| 29 | EL4977B-G83-8014-11 | HEX HEAD BOLT M8 X 20LG | 15 | no | cwh_sss_sh09 | 180 |
| 30 | EL4977B-G83-8015-39 | M6 X 30 LG HEX.SOCKET HEAD CAP SCREW | 40 | no | cwh_sss_sh09 | 180 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Data Sheet of offered products
Vendor Code Creation documents (GST, PAN, etc.)
Extended Deadline
03-Feb-2026, 5:00 pm
Opening Date
03-Feb-2026, 5:30 pm
Extended Deadline
27-Jan-2026, 5:00 pm
Opening Date
27-Jan-2026, 5:30 pm
Bidders should prepare the Data Sheet for all offered items, submit PAN, GSTIN, cancelled cheque, and EFT mandate; upload the Data Sheet with the bid, and ensure design drawings are submitted within 21 days of award for buyer approval with a 15-day response window for modifications.
Submit PAN, GSTIN, cancelled cheque, and an EFT mandate certified by the bank; ensure these accompany the bid to enable vendor-code creation and bid validation; these documents verify financial and operational legitimacy for defense procurement.
The purchaser may vary quantity up to 50% during contract; delivery time is recalculated as (increased/original quantity) × original days, minimum 30 days; this allows flexibility but requires alignment with original delivery schedule.
Upload a Data Sheet matched to the product specifications; any mismatch could lead to bid rejection; ensure product family and item data align with the offered configuration and the buyer's approved drawings.
GST reimbursement is on actuals or applicable rate, whichever is lower, capped to the quoted GST percentage; bidders must determine GST implications independently and reflect them in the bid pricing.
Submit Detailed Design Drawings within 21 days of contract award; the buyer replies with approval or a modification list within 15 days; delays by the buyer extend the delivery period without LD.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS