TenderDekho Logo
Closed GEM

Open Tender for XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1),XLPE Cable for in SHIMLA, HIMACHAL PRADESH

Bid Publish Date

01-Jun-2026, 5:20 pm

Bid End Date

11-Jun-2026, 6:00 pm

EMD

₹1,49,000

Progress

RA
Issue01-Jun-2026, 5:20 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

6297

Category

Timer switch for Street light control 1 Phase 05 KW Make Indo asian

Bid Type

Two Packet Bid

Categories 155

COPPER WIRE SIMPLEX PUMPS WORM PUMPS BITUMINOUS MATERIAL DISTRIBUTOR PVC PIPE WIND MILL ENERGY PROJECT PLATFORM SCALE SLUICE VALVE ANGLE INVERTER ANIMAL WATERING MACHINES BARITONE HORNS WATER STORAGE TANK FERROUS ELECTRODE MISCELLANEOUS VALVE DISTRIBUTION BOARD ANGLE GLOBE VALVES COPPER CABLE STRUCTURE FABRICATION POWER CABLE CABBING EQUIPMENTS COMPRESSOR PTFE WIRE AIR CYLINDERS TUBE AND FITTING AIR COOLED ENGINE DESERT COOLER ELECTRICAL PRODUCTS SENSOR WIRING ASSEMBLY WELDING FLUX WELDING ELECTRODE DISTRIBUTION?BOX LABORATORY WATER PURIFICATION EQUIPMENT STEEL FURNITURE ARC VALVE DISTILLATION GEYSER FERROUS ALLOY SUPPLY STRIP DISCRETE COMPONENTS ELECTRICAL WIRE XLPE CABLE CABLE DUCT SOLAR PV PLANT STEEL WIRE CIRCUIT PROTECTION DEVICE PETROLEUM PRODUCT PUMP SPARE PARTS HEAD LAMP AIRCRAFT CABLE SOLAR LIGHT GI WIRE ELECTRICAL SUBSTATION HEATER STATIC CONVERTERS SPEED DRIVE SYSTEM ELECTRICAL?CONDUIT IRRIGATION PUMPS SOLAR CHARGER MILITARY VEHICLE PANEL CONDUCTOR CAPACITOR SOCKET POWER SOLAR CHARGING WATER PURIFIER AND RO PLANT CB BOX WATER TANK SOLAR FENCE NEON LAMP HYBRID POWER SYSTEM GI PIPE HIGH TENSION PANEL HYDRANT LINE HYDRAULIC BRAKE WATER STORAGE AND SUPPLY COILED CABLE GINNING OIL SWITCH GEAR FLUID MECHANICS EQUIPMENT TUBE LIGHT WELDING WIRE SOLAR CELLS LFH CABLE BIDET GLUCOMETER FOOT VALVE ELECTRON TUBE AWM WIRE GL WIRE PUMP VALVES LED LIGHT PNEUMATIC VALVES GASKETS AND SEALS WELDING ROD POWER WIRE RUBBER WASHER ELECTRICAL CONDENSER GATE VALVES DRINKING WATER SYSTEM TUBE SCBA BOX VALVE WIRE FUEL PUMP ERECTION OF STRUCTURAL DISTRIBUTION PANEL ENT SET STEAM GENERATOR STEAM PUMPS ARC WELDING SLIDING VANE PUMPS SOLAR PHOTOVOLTAIC SYSTEM FLUORESCENT LAMP OVER HEAD TANK SLIDER VALVES GALVANIZED WIRE HEATING EQUIPMENT SPARES BARE CABLE CABINET GAS BURNERS WELDING TIP ANGLE COCK SPLIT CASING PUMP TRANSITION METALS BOILER MOUNTING VALVE CABLE FIRE BREATHING APPARATUS SOLAR WATER HEATER FABRICATOR WATER TRANSMISSION MACHINE SOLAR GEYSER GAUGE AMP SWITCH BATTERY FLOAT VALVES OSCILLATING PUMPS FLUSH DOOR AUTOMOTIVE CABLE TIMER BOILER VALVE LOW TENSION PANEL PEB TEA KETTLE ALUMINUM FAN METAL PRODUCTS SEWING KIT MANUFACTURING SERVICES GALVANIZED IRON PIPE

Public procurement opportunity for Indian Army XLPE Cable for Working Voltage up to and Including 1. 1 KV Marked To IS 7098 (Part 1), XLPE Cable for in SHIMLA, HIMACHAL PRADESH. Quantity: 6297 issued by. Submission Deadline: 11-06-2026 18: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 32

GeM-Bidding-9401727.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

CATALOG-Specification-3

CATALOG Specification

CATALOG-Specification-4

CATALOG Specification

CATALOG-Specification-5

CATALOG Specification

CATALOG-Specification-6

CATALOG Specification

CATALOG-Specification-7

CATALOG Specification

CATALOG-Specification-8

CATALOG Specification

CATALOG-Specification-9

CATALOG Specification

CATALOG-Specification-10

CATALOG Specification

CATALOG-Specification-11

CATALOG Specification

CATALOG-Specification-12

CATALOG Specification

CATALOG-Specification-13

CATALOG Specification

CATALOG-Specification-14

CATALOG Specification

CATALOG-Specification-15

CATALOG Specification

CATALOG-Specification-16

CATALOG Specification

CATALOG-Specification-17

CATALOG Specification

CATALOG-Specification-18

CATALOG Specification

CATALOG-Specification-19

CATALOG Specification

CATALOG-Specification-20

CATALOG Specification

CATALOG-Specification-21

CATALOG Specification

CATALOG-Specification-22

CATALOG Specification

CATALOG-Specification-23

CATALOG Specification

CATALOG-Specification-24

CATALOG Specification

CATALOG-Specification-25

CATALOG Specification

CATALOG-Specification-26

CATALOG Specification

CATALOG-Specification-27

CATALOG Specification

CATALOG-Specification-28

CATALOG Specification

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 142 Items Sign in for GEM prices

#1

Aluminium lugs thimble suitable for 35 Sqmm

Aluminium lugs thimble suitable for 35 Sqmm

10 nos Delivery: 45 days
#2

Aluminium lugs thimble suitable for 50 Sqmm

Aluminium lugs thimble suitable for 50 Sqmm

10 nos Delivery: 45 days
#3

Angle Holder

Angle Holder

53 nos Delivery: 45 days
#4

Ball Cock Pvc 15 mm

Ball Cock Pvc 15 mm

33 nos Delivery: 45 days
#5

Bathroom cabinet 350 x 450mm

Bathroom cabinet 350 x 450mm

26 nos Delivery: 45 days
#6

Batten Holder

Batten Holder

11 nos Delivery: 45 days
#7

Bell Buzzer

Bell Buzzer

25 nos Delivery: 45 days
#8

Bell Push Piano Type

Bell Push Piano Type

25 nos Delivery: 45 days
#9

Bib cock Brass 15mm

Bib cock Brass 15mm

107 nos Delivery: 45 days
#10

Bitumen flash strip 100mm

Bitumen flash strip 100mm

21 roll Delivery: 45 days
#11

Bitumen flash strip 50mm

Bitumen flash strip 50mm

8 roll Delivery: 45 days
#12

Cabinet Mirror make Pratage CN 55

Cabinet Mirror make Pratage CN 55

27 nos Delivery: 45 days
#13

Cable flexible copper coductor 23 or 0076 three core

Cable flexible copper coductor 23 or 0076 three core

7 roll Delivery: 45 days
#14

Cable flexible copper coductor 40 or 0076 copper

Cable flexible copper coductor 40 or 0076 copper

9 roll Delivery: 45 days
#15

Cable flexible copper conductor 56 or 30 three core

Cable flexible copper conductor 56 or 30 three core

8 roll Delivery: 45 days
#16

Cable PVC copper conductor 4 Sqmm 3 core

Cable PVC copper conductor 4 Sqmm 3 core

71 rm Delivery: 45 days
#17

Capacitor 2 point 5 MFD

Capacitor 2 point 5 MFD

28 nos Delivery: 45 days
#18

Capacitor 3 point 15MFD

Capacitor 3 point 15MFD

13 nos Delivery: 45 days
#19

Capacitor 4 MFD

Capacitor 4 MFD

17 nos Delivery: 45 days
#20

Ceiling Rose

Ceiling Rose

20 nos Delivery: 45 days
#21

CI Foot Valve 100mm

CI Foot Valve 100mm

12 nos Delivery: 45 days
#22

CI Foot Valve 80mm

CI Foot Valve 80mm

10 nos Delivery: 45 days
#23

Filament 1000Watt with glass tube for H Pillar

Filament 1000Watt with glass tube for H Pillar

13 nos Delivery: 45 days
#24

Float valve 15mm PVC

Float valve 15mm PVC

75 nos Delivery: 45 days
#25

Float valve 20mm Brass

Float valve 20mm Brass

21 nos Delivery: 45 days
#26

Float valve 25mm PVC

Float valve 25mm PVC

18 nos Delivery: 45 days
#27

Flushing cistern low level PVC 10ltr capacity

Flushing cistern low level PVC 10ltr capacity

34 nos Delivery: 45 days
#28

Gate Valve GM 50mm

Gate Valve GM 50mm

15 nos Delivery: 45 days
#29

Geyser safety valve

Geyser safety valve

31 nos Delivery: 45 days
#30

Gland packing white colour 10 mm

Gland packing white colour 10 mm

5 kg Delivery: 45 days
#31

Gland packing white colour 15 mm

Gland packing white colour 15 mm

6 kg Delivery: 45 days
#32

Glass Panes clear 4 or 5mm x 900mm x 1200mm

Glass Panes clear 4 or 5mm x 900mm x 1200mm

11 nos Delivery: 45 days
#33

Glass Panes clear 5mm x 900mm x 900mm

Glass Panes clear 5mm x 900mm x 900mm

8 nos Delivery: 45 days
#34

Glass Shelvs Oval Shape 300mm

Glass Shelvs Oval Shape 300mm

8 nos Delivery: 45 days
#35

Greating PVC 100mm

Greating PVC 100mm

9 nos Delivery: 45 days
#36

Greating PVC 125mm

Greating PVC 125mm

12 nos Delivery: 45 days
#37

Heating element triangular type 2 KW for Geyser

Heating element triangular type 2 KW for Geyser

60 nos Delivery: 45 days
#38

Inverter Recess panel 2x2 with battery power backup 36 W

Inverter Recess panel 2x2 with battery power backup 36 W

5 nos Delivery: 45 days
#39

Invertor batten with 2hr power backup 10 W

Invertor batten with 2hr power backup 10 W

115 nos Delivery: 45 days
#40

Invertor batten with 2hr power backup 18 or 20 W

Invertor batten with 2hr power backup 18 or 20 W

53 nos Delivery: 45 days
#41

Invertor batten with 2hr power backup 22 W

Invertor batten with 2hr power backup 22 W

58 nos Delivery: 45 days
#42

Kit for low level cistern PVC 10 ltr Cap

Kit for low level cistern PVC 10 ltr Cap

39 nos Delivery: 45 days
#43

Lamp Holder battern bakalite

Lamp Holder battern bakalite

17 nos Delivery: 45 days
#44

LED light fitting 18 watt

LED light fitting 18 watt

25 nos Delivery: 45 days
#45

LED Recessed light fitting 36 watt 4 x 1

LED Recessed light fitting 36 watt 4 x 1

14 nos Delivery: 45 days
#46

LED fitting 10 watt 2 x 2

LED fitting 10 watt 2 x 2

48 nos Delivery: 45 days
#47

LED Flood light 120 watt

LED Flood light 120 watt

10 nos Delivery: 45 days
#48

LED Flood light 50 watt

LED Flood light 50 watt

17 nos Delivery: 45 days
#49

LED Inverter Street Light 60 Watt

LED Inverter Street Light 60 Watt

9 nos Delivery: 45 days
#50

LED slim tube light fitting 18 or 20 watt 1200mm long 4 feet

LED slim tube light fitting 18 or 20 watt 1200mm long 4 feet

301 nos Delivery: 45 days
#51

LED slim tube light fitting 22 watt 1200mm long 4 feet Rod or Batten

LED slim tube light fitting 22 watt 1200mm long 4 feet Rod or Batten

181 nos Delivery: 45 days
#52

LED Solar light 25 or 30 watt with pole

LED Solar light 25 or 30 watt with pole

13 nos Delivery: 45 days
#53

Long rail for Charpoy GI pipe with Nylon newar

Long rail for Charpoy GI pipe with Nylon newar

4 nos Delivery: 45 days
#54

Looking glass table dressing ladies 1220 x 365 x 5mm with frame

Looking glass table dressing ladies 1220 x 365 x 5mm with frame

4 nos Delivery: 45 days
#55

Looking Mirror 1200x900mm 5mm thick without Frame

Looking Mirror 1200x900mm 5mm thick without Frame

19 nos Delivery: 45 days
#56

MCB Distribution board for 4 way SPN metal enclosed double door

MCB Distribution board for 4 way SPN metal enclosed double door

14 nos Delivery: 45 days
#57

MCB Distribution board for 6 way metal clad

MCB Distribution board for 6 way metal clad

6 nos Delivery: 45 days
#58

MCB Distribution board for 8 way metal clad

MCB Distribution board for 8 way metal clad

5 nos Delivery: 45 days
#59

MCB TPN 100 AMP

MCB TPN 100 AMP

8 nos Delivery: 45 days
#60

Motion sensor LED batten 20 W

Motion sensor LED batten 20 W

17 nos Delivery: 45 days
#61

PVC Casing Caping 20 or 25mm

PVC Casing Caping 20 or 25mm

22 rm Delivery: 45 days
#62

PVC conduit pipe 20 or 25mm dia

PVC conduit pipe 20 or 25mm dia

18 rm Delivery: 45 days
#63

PVC Connection for Geyser 450 x15 mm

PVC Connection for Geyser 450 x15 mm

77 nos Delivery: 45 days
#64

PVC Insulation Tape F or R 25mm x 25Rm long

PVC Insulation Tape F or R 25mm x 25Rm long

14 nos Delivery: 45 days
#65

PVC L or L system handle

PVC L or L system handle

24 nos Delivery: 45 days
#66

PVC Pipe for L by L Cistern 40 mm

PVC Pipe for L by L Cistern 40 mm

15 nos Delivery: 45 days
#67

PVC Round Sheet

PVC Round Sheet

10 nos Delivery: 45 days
#68

PVC Tape F R 15mmx25Rm long

PVC Tape F R 15mmx25Rm long

46 nos Delivery: 45 days
#69

PVC Tape F R 25mmx25Rm long

PVC Tape F R 25mmx25Rm long

35 nos Delivery: 45 days
#70

PVC Waste Pipe 32mm for Urinal

PVC Waste Pipe 32mm for Urinal

37 nos Delivery: 45 days
#71

PVC Waste Pipe 32mm for WB

PVC Waste Pipe 32mm for WB

119 nos Delivery: 45 days
#72

PVC Waste Pipe 900mm

PVC Waste Pipe 900mm

46 nos Delivery: 45 days
#73

Rawal Plug 35mm

Rawal Plug 35mm

9 pkt Delivery: 45 days
#74

Rawal Plug 40mm

Rawal Plug 40mm

12 pkt Delivery: 45 days
#75

Rawal Plug 50mm

Rawal Plug 50mm

8 pkt Delivery: 45 days
#76

Recess mounting LED 1x1 luminier fitting 18 watt complete

Recess mounting LED 1x1 luminier fitting 18 watt complete

37 nos Delivery: 45 days
#77

Recess mounting LED 1x24 watt fitting complete

Recess mounting LED 1x24 watt fitting complete

15 nos Delivery: 45 days
#78

Regulator for ceiling fan Electric

Regulator for ceiling fan Electric

20 nos Delivery: 45 days
#79

Rubber Washer for connection pipe

Rubber Washer for connection pipe

59 nos Delivery: 45 days
#80

Sand paper NO 80

Sand paper NO 80

16 nos Delivery: 45 days
#81

Screw 15 mm half thread

Screw 15 mm half thread

7 pkt Delivery: 45 days
#82

Screw 20 mm half thread

Screw 20 mm half thread

11 pkt Delivery: 45 days
#83

Screw 25 mm half thread

Screw 25 mm half thread

7 pkt Delivery: 45 days
#84

Screw steel 15mm full thread

Screw steel 15mm full thread

8 nos Delivery: 45 days
#85

Screw Steel 20mm full thread

Screw Steel 20mm full thread

7 pkt Delivery: 45 days
#86

Screw Steel 40 mm full thread

Screw Steel 40 mm full thread

8 nos Delivery: 45 days
#87

Screw wood brass 15mm

Screw wood brass 15mm

7 pkt Delivery: 45 days
#88

Screw wood brass 20mm

Screw wood brass 20mm

7 pkt Delivery: 45 days
#89

Screw wood brass 25mm

Screw wood brass 25mm

8 pkt Delivery: 45 days
#90

Screw wood steel 20mm

Screw wood steel 20mm

5 pkt Delivery: 45 days
#91

Screw wood steel 25mm

Screw wood steel 25mm

7 pkt Delivery: 45 days
#92

Screw wood steel 30mm

Screw wood steel 30mm

9 pkt Delivery: 45 days
#93

Screw wood steel 35mm

Screw wood steel 35mm

9 pkt Delivery: 45 days
#94

Screw wood steel 40mm

Screw wood steel 40mm

9 pkt Delivery: 45 days
#95

Screw wood steel 45 mm

Screw wood steel 45 mm

7 pkt Delivery: 45 days
#96

Screw wood steel 50mm

Screw wood steel 50mm

8 pkt Delivery: 45 days
#97

Screw wood steel 75mm

Screw wood steel 75mm

7 pkt Delivery: 45 days
#98

Screw wood steel 15mm

Screw wood steel 15mm

8 pkt Delivery: 45 days
#99

Shower rose PVC

Shower rose PVC

14 nos Delivery: 45 days
#100

Sink stainless steel 925x450x175mm thick

Sink stainless steel 925x450x175mm thick

11 nos Delivery: 45 days
#101

Sliding Bolt Aliminium 150mm

Sliding Bolt Aliminium 150mm

17 nos Delivery: 45 days
#102

Sluice Valve 100mm

Sluice Valve 100mm

4 nos Delivery: 45 days
#103

Sluice Valve 150mm

Sluice Valve 150mm

3 nos Delivery: 45 days
#104

Socket 3 pin 5 or 6 Amp piano type

Socket 3 pin 5 or 6 Amp piano type

48 nos Delivery: 45 days
#105

Socket 3 pin 6 or 16 Amp

Socket 3 pin 6 or 16 Amp

130 nos Delivery: 45 days
#106

Socket piano type 6 and 16 Amp multi

Socket piano type 6 and 16 Amp multi

87 nos Delivery: 45 days
#107

Socket 6 Amp 5 Pin

Socket 6 Amp 5 Pin

76 nos Delivery: 45 days
#108

Solar geyser element 3 KW

Solar geyser element 3 KW

12 nos Delivery: 45 days
#109

SS Greating CP 100mm

SS Greating CP 100mm

59 nos Delivery: 45 days
#110

SS Greating CP 125mm

SS Greating CP 125mm

61 nos Delivery: 45 days
#111

SS handle for heat pillar

SS handle for heat pillar

6 nos Delivery: 45 days
#112

Stainless steel handle

Stainless steel handle

12 nos Delivery: 45 days
#113

Steel screw 25mm full thread

Steel screw 25mm full thread

8 pkt Delivery: 45 days
#114

Stop cock CP 15mm

Stop cock CP 15mm

59 nos Delivery: 45 days
#115

Street light with battery 2hr power backup 30 W

Street light with battery 2hr power backup 30 W

7 nos Delivery: 45 days
#116

Street light with battery 2hr power backup 60 W

Street light with battery 2hr power backup 60 W

7 nos Delivery: 45 days
#117

Strip water 2 Kw for central heating plant

Strip water 2 Kw for central heating plant

8 nos Delivery: 45 days
#118

Stripped finned heater 3KW for laundry machine

Stripped finned heater 3KW for laundry machine

7 nos Delivery: 45 days
#119

Switch controller for H Pillar

Switch controller for H Pillar

17 nos Delivery: 45 days
#120

Switch socket combination 16 Amp

Switch socket combination 16 Amp

22 nos Delivery: 45 days
#121

Switch socket combination 6 Amp

Switch socket combination 6 Amp

37 nos Delivery: 45 days
#122

Switch socket combination Box Type 15 or 16 Amp

Switch socket combination Box Type 15 or 16 Amp

116 nos Delivery: 45 days
#123

Switch socket combination Box Type 5 or 6 Amp

Switch socket combination Box Type 5 or 6 Amp

46 nos Delivery: 45 days
#124

Syphon 6 hole for Geyser

Syphon 6 hole for Geyser

12 nos Delivery: 45 days
#125

Syphon 9 hole for Geyser

Syphon 9 hole for Geyser

11 nos Delivery: 45 days
#126

Syphon for 25 ltr Gyser

Syphon for 25 ltr Gyser

18 nos Delivery: 45 days
#127

Tape insulation 20mm x 25mtr

Tape insulation 20mm x 25mtr

153 nos Delivery: 45 days
#128

Tasala

Tasala

51 nos Delivery: 45 days
#129

Timer switch for Street light control 1 Phase 05 KW Make Indo asian

Timer switch for Street light control 1 Phase 05 KW Make Indo asian

1 nos Delivery: 45 days
#130

Timer switch for Street light control 3 Phase 03 KW Make Indo asian

Timer switch for Street light control 3 Phase 03 KW Make Indo asian

2 nos Delivery: 45 days
#131

Timer switch for Street light control 3 Phase 08 KW Make Havells

Timer switch for Street light control 3 Phase 08 KW Make Havells

2 nos Delivery: 45 days
#132

Touch wood

Touch wood

10 ltr Delivery: 45 days
#133

Tower bolt aluminum 100mm

Tower bolt aluminum 100mm

10 nos Delivery: 45 days
#134

Tube Batten Only patty without Rod

Tube Batten Only patty without Rod

66 nos Delivery: 45 days
#135

Waste coupling 32 mm

Waste coupling 32 mm

17 nos Delivery: 45 days
#136

Waste Fiting for Sink 50mm

Waste Fiting for Sink 50mm

12 nos Delivery: 45 days
#137

Water storage tank 1000 Ltr

Water storage tank 1000 Ltr

5 nos Delivery: 45 days
#138

Water storage tank 500 Ltr

Water storage tank 500 Ltr

8 nos Delivery: 45 days
#139

Welding rod GI

Welding rod GI

18 pkt Delivery: 45 days
#140

Wire mash 3 inch wide 24 gauge

Wire mash 3 inch wide 24 gauge

12 roll Delivery: 45 days
#141

Wood Board 8 x 5

Wood Board 8 x 5

6 nos Delivery: 45 days
#142

WPC Flush door 30mm thick 1 x 2 meter

WPC Flush door 30mm thick 1 x 2 meter

5 nos Delivery: 45 days

Technical Specifications 28 Items

Item #1 Details

View Catalog
Category Specification Requirement
STANDARD Cables suitable for use in mines No
STANDARD Cables suitable for use in low temperature applications No
GENERIC Classification of cables for improved fire performace category 01
GENERIC Nominal Area of Conductor (in Sq mm) 25
GENERIC Number of Cores 4
CONSTRUCTION Material of Conductor Aluminium
CONSTRUCTION Construction of the conductor Stranded and shaped
CONSTRUCTION Type of Inner Sheath Vulcanized rubber
ARMOURING Type of Cable Armoured cable
ARMOURING Material of Armouring Aluminium round wire
ARMOURING Type of Armouring Single wire

Reverse Auction Schedule

Completed

Start

12-Jun-2026, 7:00 pm

End

13-Jun-2026, 7:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ASRS TRADERS   Under PMA
Make : KEI Model : A2XFY11-06-2026 11:41:19
2
PRIDE ENTERPRISE   Under PMA
Make : GRANDLAY CABLES Model : 4C X 25 SQMM GRANDLAY CABLE11-06-2026 09:54:57
3
RBS TRADING   Under PMA
Make : GRANDLAY CABLES Model : 4C X 25 SQMM GRANDLAY CABLE11-06-2026 17:35:19

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1RBS TRADING(MII)   Under PMA Winner ₹49,75,582Item Categories : XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1),XLPE Cable for
L2ASRS TRADERS (MII)   Under PMA₹50,92,487Item Categories : XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1),XLPE Cable for
L3PRIDE ENTERPRISE (MII)   Under PMA₹51,02,655Item Categories : XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1),XLPE Cable for

🎉 L1 Winner

RBS TRADING(MII)   Under PMA

Final Price: ₹49,75,582