Indian Army Tender Bikaner Rajasthan Security Equipment Procurement 2026 ISI/ISO Standards and EMD 49284
Indian Army
BIKANER, RAJASTHAN
Progress
Quantity
6635
Category
SHELTER CANVAS BIVOUAC COMPLETE
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs) in JODHPUR, RAJASTHAN. Procures SHELTER CANVAS BIVOUAC COMPLETE, STOOL CAMP MARK-1, LNR INR WITH PV DD FABR FOR TEFS 2M UNIT, CLIP FOR TENT EXTNDBL F SUPTD 4M UNIT, and FLY CATCHER. Estimated Value and item-level quantities are not disclosed; EMD is ₹132,936. The contract requires submission of Detailed Design Drawings within 5 days of award, with buyer approval or modification list within 7 days; delivery adjusts if approvals lag. Mandatory data sheet upload with bid; non-disclosure certificate; and GST handling per actual rates. Experience criterion expects a supplier or OEM to have supplied similar category products to government bodies for at least 3 years. This tender emphasizes non-obsolescence and active OEM support, plus safety compliance for potentially hazardous items. Unique scope includes fabrication aligned to approved drawings and post-approval modifications, with penalties or LD not specified.
EMD amount: ₹132,936
Experience: minimum 3 years in supplying similar Category Products to Central/State Govt/PSU
Data Sheet: required and must match technical parameters
Delivery tied to approval of Detailed Design Drawings (5 days for submission, 7 days for approval/revisions)
Non-obsolescence: bid for products with at least 1 year residual market life
Hazard precautions: transport/handling guidelines for hazardous items
Key Term 1: EMD₹132936 mandatory with bid submission
Key Term 2: 3 years govt/PSU experience required by bidder or OEM
Key Term 3: Detailed Design Drawings approval within 5 days of award; LD waiver during buyer approval delay
GST will be reimbursed per actuals or the applicable rate, whichever is lower, with no buyer liability for higher rates
Delivery timeline depends on approved Detailed Design Drawings; delays in approval extend delivery period without LD
LD details not specified in available terms; extension granted for buyer approval delays without LD
Not under liquidation or court receivership
Regularly manufactured and supplied similar products to govt/PSUs for 3 years
Not end-of-life officially declared by OEM within the residual market life
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BIKANER, RAJASTHAN
Indian Army
DHEMAJI, ASSAM
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SHELTER CANVAS BIVOUAC COMPLETE | SHELTER CANVAS BIVOUAC COMPLETE | 44 | nos | kvsingh@224abod | 45 |
| 2 | STOOL CAMP MARK-1 | STOOL CAMP MARK-1 | 351 | nos | kvsingh@224abod | 45 |
| 3 | LNR INR WITH PV DD FABR FOR TEFS 2M UNIT | LNR INR WITH PV DD FABR FOR TEFS 2M UNIT | 37 | nos | kvsingh@224abod | 45 |
| 4 | CLIP FOR TENT EXTNDBL F SUPTD 4M UNIT | CLIP FOR TENT EXTNDBL F/SUPTD 4M UNIT | 5,889 | nos | kvsingh@224abod | 45 |
| 5 | FLY CATCHER | FLY CATCHER | 314 | nos | kvsingh@224abod | 45 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Cancelled cheque
EFT mandate certified by bank
Data Sheet of offered products
NDA certificate on bidder letter head
Experience certificates showing 3 years Govt/PSU supply
OEM authorization (if applicable)
Key insights about RAJASTHAN tender market
To bid, submit detailed design drawings within 5 days of award, obtain buyer approval within 7 days, and attach the Data Sheet, NDA, PAN, GSTIN, cancelled cheque, and EFT Mandate. Ensure the products are not end-of-life and have at least 3 years govt/PSU supply experience per terms.
Required documents include PAN card, GSTIN, cancelled cheque, EFT mandate, Data Sheet of offered products, NDA certificate, and evidence of 3 years govt/PSU supply experience; OEM authorizations if applicable; contracts from prior similar supply.
The bid security or EMD is ₹132,936. Ensure payment is made as part of bid submission; EMD is applicable to participate in the tender for shelter canvas bivouac and related items.
Delivery is contingent on approved Detailed Design Drawings. Submit within 5 days; buyer approval or modification list issued within 7 days; delays in approval may extend the delivery period without liquidated damages.
Bidders or OEMs must have at least 3 years of regular manufacture and supply of similar category products to Central/State Govt Organizations or PSUs; provide contracts as evidence for each year.
GST will be reimbursed based on actual rates or the lower applicable rate, subject to the quoted GST percentage; the buyer does not bear responsibility for rate changes beyond the quoted amount.
A Data Sheet for offered product(s) must be uploaded and cross-checked against the technical parameters; any mismatch can lead to bid rejection. Ensure alignment with the approved drawings and product specifications.
Bidders must offer products with at least 1 year residual market life and ensure the OEM has not declared end-of-life before the specified period; supply should be viable for the intended government use.
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS