Progress
Quantity
1
Bid Type
Two Packet Bid
Product/service names: Living Shelter (ORL) 20 Men Modular
Quantities: 01 unit
Estimated value: Not disclosed
Experience: Not specified in data
Quality/standards: Not specified in data; plan to align with generic military shelter norms
Delivery: Based on original delivery order; extended period per option clause
Warranty/AMC: Not specified; bidders should propose standard shelter warranty
Option-based quantity adjustments up to 50% during contract
Extended delivery period calculated with minimum 30 days
Delivery starts from last date of original delivery order
Details not published; bidders should confirm standard government terms in bid submission
Delivery commences from last date of original delivery order; extended period triggers formula based on increased quantity
Not specified; bidders should anticipate standard LD mechanisms in contract
Experience in supplying modular shelters or military accommodation
Tax compliance (GST) and financial stability
Capability to deliver within potential 50% quantity variation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Provn of Qty 01 x Living Shelter (ORL) 20 Men Modular
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Pre-Bid Date
21-07-2026 10:00:00
Pre-Bid Venue
12 Engineer Regiment, Tenali TCP, Dinjan - 786189
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Tinsukia
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tinsukia | Tinsukia | - | - | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar modular shelter or military accommodation projects
Financial statements (last 2-3 years) demonstrating stability
EMD submission proof (amount not specified in data) or as per tender SL
Technical bid documents outlining modular shelter capabilities
OEM authorizations or dealership certificates (if applicable)
Key insights about ASSAM tender market
Bidders should prepare standard documents: GST, PAN, experience certificates, financial statements, OEM authorizations, and technical bid outlining modular shelter capabilities. The procurement allows quantity variation up to 50%, so include scalable production plans and revised delivery timelines. Ensure compliance with Army shelter norms and submission through the official portal.
Required documents include GST certificate, PAN, last 3 years financials, experience certificates for similar shelters, OEM authorization (if applicable), and technical bid detailing modular shelter specifications. EMD submission proof is expected per tender norms; verify current portal guidelines before submission.
Delivery starts from the last date of the original delivery order. If quantity increases, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Ensure readiness for possible 50% quantity variation during contract.
Specific standards are not published in the data. Bid response should propose IS or military shelter compliance where applicable and include documentation demonstrating modular shelter performance, durability, and safety for 20 personnel, plus any OEM certifications if available.
Prices remain at contracted rates for up to a 50% quantity increase or during the extended delivery period, per option clause. Bidders must present production scalability plans and attach pricing schedules showing unit cost stability under extended scope.
Eligibility requires demonstrated experience in supplying modular shelters or similar accommodations, financial stability with verifiable statements, GST registration, and capability to meet delivery timelines amid potential quantity changes. OEM authorization strengthens eligibility for official Army contracts.
Award timing is not specified in the data. Bid submissions should anticipate standards-based evaluation, with flexibility for quantity variation up to 50% and compliance with delivery-order-linked schedules, followed by post-bid clarifications if required by the Indian Army.
Scope covers delivery of a single ORL modular shelter for 20 personnel, without BOQ details in the provided data. Respondents should define shelter composition, assembly, and transport readiness, plus warranty and service terms, aligning with Army field shelter expectations.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS