Bid Publish Date
29-Jul-2026, 2:01 pm
Bid End Date
20-Aug-2026, 2:00 pm
EMD
₹50,000
Value
₹25,00,000
Location
Progress
Public procurement opportunity for Delhi University UPS, battery, Accessories, storage rack, Interlink, MCCB, Battery Terminal, UPS Cable, Shifting, ITC of UPS, ITC of New Battery Bank in NORTH DELHI, DELHI. Quantity: 390 issued by. Submission Deadline: 20-08-2026 14: 00: 00. View full details and respond.
Quantity
390
Category
UPS
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
3 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
125
OEM Avg. Turnover
100
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
UPS , battery , Accessories , storage rack , Interlink , MCCB , Battery Terminal , UPS Cable , Shifting , ITC of UPS , ITC of New Battery Bank
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
7
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
North
Delivery Pincodes
110007
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Charoo Pandey | 110007,Office of University Engineer, 12 Cavalary Lane, University of Delhi, Delhi - 110007 | North | Delhi | 110007 | 3 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
UPS
15KVA UPS 3 Phase with 2 years warranty
battery
12V SMF Battery 65AH
Accessories
Gigabit speed SNMP Modbus Combo card
storage rack
Top covered battery rack
Interlink
Battery to Battery Interlinks
MCCB
Battery MCCB 100Amps
Battery Terminal
BATTERY TERMINAL CAPS
UPS Cable
Battery to UPS Dc Cable
Shifting
Unloading Shifting of New UPS to its respective room
ITC of UPS
Installation Testing Commissioning of UPS 15kVA
ITC of New Battery Bank
Installation Testing Commissioning of New Battery Bank
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | UPS | 15KVA UPS 3 Phase with 2 years warranty | 3 | nos | [email protected] | 45 | |
| 2 | battery | 12V SMF Battery 65AH | 102 | nos | [email protected] | 45 | |
| 3 | Accessories | Gigabit speed SNMP Modbus Combo card | 3 | nos | [email protected] | 45 | |
| 4 | storage rack | Top covered battery rack | 3 | nos | [email protected] | 45 | |
| 5 | Interlink | Battery to Battery Interlinks | 3 | set | [email protected] | 45 | |
| 6 | MCCB | Battery MCCB 100Amps | 3 | nos | [email protected] | 45 | |
| 7 | Battery Terminal | BATTERY TERMINAL CAPS | 204 | nos | [email protected] | 45 | |
| 8 | UPS Cable | Battery to UPS Dc Cable | 60 | meter | [email protected] | 45 | |
| 9 | Shifting | Unloading Shifting of New UPS to its respective room | 3 | lot | [email protected] | 45 | |
| 10 | ITC of UPS | Installation Testing Commissioning of UPS 15kVA | 3 | lot | [email protected] | 45 | |
| 11 | ITC of New Battery Bank | Installation Testing Commissioning of New Battery Bank | 3 | lot | [email protected] | 45 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer