TenderDekho Logo
Closed GEM

Bids are Invited For UPS,battery,Accessories,storage rack,Interlink,MCCB,Battery Terminal,UPS Cable,Shifting,ITC of UPS, in NORTH DELHI, DELHI

Bid Publish Date

29-Jul-2026, 2:01 pm

Bid End Date

20-Aug-2026, 2:00 pm

EMD

₹50,000

Value

₹25,00,000

Progress

Issue29-Jul-2026, 2:01 pm
AwardPending

Public procurement opportunity for Delhi University UPS, battery, Accessories, storage rack, Interlink, MCCB, Battery Terminal, UPS Cable, Shifting, ITC of UPS, ITC of New Battery Bank in NORTH DELHI, DELHI. Quantity: 390 issued by. Submission Deadline: 20-08-2026 14: 00: 00. View full details and respond.

Authority & Contact

Organization

Delhi University

Office Name

University Of Delhi

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

390

Category

UPS

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

125

OEM Avg. Turnover

100

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

UPS , battery , Accessories , storage rack , Interlink , MCCB , Battery Terminal , UPS Cable , Shifting , ITC of UPS , ITC of New Battery Bank

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

7

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

North

Delivery Pincodes

110007

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Charoo Pandey110007,Office of University Engineer, 12 Cavalary Lane, University of Delhi, Delhi - 110007NorthDelhi110007345-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9673845.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

UPS

15KVA UPS 3 Phase with 2 years warranty

3 nos Delivery: 45 days
#2

battery

12V SMF Battery 65AH

102 nos Delivery: 45 days
#3

Accessories

Gigabit speed SNMP Modbus Combo card

3 nos Delivery: 45 days
#4

storage rack

Top covered battery rack

3 nos Delivery: 45 days
#5

Interlink

Battery to Battery Interlinks

3 set Delivery: 45 days
#6

MCCB

Battery MCCB 100Amps

3 nos Delivery: 45 days
#7

Battery Terminal

BATTERY TERMINAL CAPS

204 nos Delivery: 45 days
#8

UPS Cable

Battery to UPS Dc Cable

60 meter Delivery: 45 days
#9

Shifting

Unloading Shifting of New UPS to its respective room

3 lot Delivery: 45 days
#10

ITC of UPS

Installation Testing Commissioning of UPS 15kVA

3 lot Delivery: 45 days
#11

ITC of New Battery Bank

Installation Testing Commissioning of New Battery Bank

3 lot Delivery: 45 days

Categories 24

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer