TenderDekho Logo
GEM

Invitation to Bid - REMOVABLE LIFTING LUGS FOR BWCP,TEMPERATURE GAUGE FOR MOTOR BWCP,BLIND FLANGE FOR PUMP CASING,GASKE in CHENNAI, TAMIL NADU

Bid Publish Date

10-Sep-2025, 10:01 am

Bid End Date

24-Oct-2025, 2:00 pm

Generate Docs

Progress

Issue10-Sep-2025, 10:01 am
Corrigendum18-Oct-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

111

Category

REMOVABLE LIFTING LUGS FOR BWCP

Bid Type

Two Packet Bid

Categories 84

Bharat Heavy Electricals Limited (bhel) invites bids for REMOVABLE LIFTING LUGS FOR BWCP, TEMPERATURE GAUGE FOR MOTOR BWCP, BLIND FLANGE FOR PUMP CASING, GASKETPUMP CASING AND BLIND FLANGE MATING, HEAT EXCHANGER WITH MOUNTING BRACKET, WELD PAD FOR TEMPERATURE ELEMENTS, COMPLETE STUD TENSIONING KIT, PUMP CASING AND TRANSIT ASSY FOR BWCP, MOTOR AND TRANSIT ASSY FOR BWCP, DUPLEX THERMOCOUPLE FOR MOTOR BWCP, DUPLEX THERMOCOUPLE PUMP CASING BWCP, FLOW RATOR WITH AMPLIFIER, GASKETS ORINGSMOTOR PUMP HB FLANGES, GASKETS ORINGS FOR BWCP, ANY OTHER SPECIAL TOOLSANDTACKLES FOR BWCP, IMPELLER PULLER FOR BWCP, THRUST NUT SPANNER FOR BWCP, THRUST DISC PULLER FOR BWCP, IMPELLER NUT SPANNER FOR BWCP, MOTOR REMOVABLE LIFTING LUGS FOR BWCP, LIFTING EYES AS NECESSARY FOR BWCP, LIFTING PLATEEYE BOLTS MOTOR INTERNAL, ANY OTHER SPECIAL TOOLS and TACKLES FOR BWCP, COMPLETE BWC PUMP WITH MOTOR ASSEMBLY, JOURNAL BEARING FOR BWCP, THRUST BEARING FOR BWCP, CASING WEAR RINGS FOR BWCP, IMPELLER WEAR RINGS FOR BWCP, SET OF GASKETS FOR BWCP, SET OF O RINGS FOR BWCP, MOTOR HEAT EXCHANGER ASSEMBLY FOR BWCP, STRAINERS FOR BWCP, CFD AND FEM Analysis, Hot Type Test, Erection and Commissioning for 14 man days per pump Rate quoted should be per man day, Traing to end user Rate quoted should be per man day in CHENNAI, TAMIL NADU. Quantity: 111. Submission Deadline: 24-10-2025 14: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

REMOVABLE LIFTING LUGS FOR BWCP , TEMPERATURE GAUGE FOR MOTOR BWCP , BLIND FLANGE FOR PUMP CASING , GASKETPUMP CASING AND BLIND FLANGE MATING , HEAT EXCHANGER WITH MOUNTING BRACKET , WELD PAD FOR TEMPERATURE ELEMENTS , COMPLETE STUD TENSIONING KIT , PUMP CASING AND TRANSIT ASSY FOR BWCP , MOTOR AND TRANSIT ASSY FOR BWCP , DUPLEX THERMOCOUPLE FOR MOTOR BWCP , DUPLEX THERMOCOUPLE PUMP CASING BWCP , FLOW RATOR WITH AMPLIFIER , GASKETS ORINGSMOTOR PUMP HB FLANGES , GASKETS ORINGS FOR BWCP , ANY OTHER SPECIAL TOOLSANDTACKLES FOR BWCP , IMPELLER PULLER FOR BWCP , THRUST NUT SPANNER FOR BWCP , THRUST DISC PULLER FOR BWCP , IMPELLER NUT SPANNER FOR BWCP , MOTOR REMOVABLE LIFTING LUGS FOR BWCP , LIFTING EYES AS NECESSARY FOR BWCP , LIFTING PLATEEYE BOLTS MOTOR INTERNAL , ANY OTHER SPECIAL TOOLS and TACKLES FOR BWCP , COMPLETE BWC PUMP WITH MOTOR ASSEMBLY , JOURNAL BEARING FOR BWCP , THRUST BEARING FOR BWCP , CASING WEAR RINGS FOR BWCP , IMPELLER WEAR RINGS FOR BWCP , SET OF GASKETS FOR BWCP , SET OF O RINGS FOR BWCP , MOTOR HEAT EXCHANGER ASSEMBLY FOR BWCP , STRAINERS FOR BWCP , CFD AND FEM Analysis , Hot Type Test , Erection and Commissioning for 14 man days per pump Rate quoted should be per man day , Traing to end user Rate quoted should be per man day

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8327034.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 57 Items Sign in for GEM prices

#1

REMOVABLE LIFTING LUGS FOR BWCP

REMOVABLE LIFTING LUGS FOR BWCP

2 no Delivery: 180 days
#2

TEMPERATURE GAUGE FOR MOTOR BWCP

TEMPERATURE GAUGE FOR MOTOR BWCP

1 no Delivery: 180 days
#3

BLIND FLANGE FOR PUMP CASING

BLIND FLANGE FOR PUMP CASING

1 no Delivery: 180 days
#4

GASKETPUMP CASING AND BLIND FLANGE MATING

GASKETPUMP CASING AND BLIND FLANGE MATING

1 no Delivery: 180 days
#5

HEAT EXCHANGER WITH MOUNTING BRACKET

HEAT EXCHANGER WITH MOUNTING BRACKET

1 set Delivery: 180 days
#6

WELD PAD FOR TEMPERATURE ELEMENTS

WELD PAD FOR TEMPERATURE ELEMENTS

1 set Delivery: 180 days
#7

COMPLETE STUD TENSIONING KIT

COMPLETE STUD TENSIONING KIT

1 set Delivery: 180 days
#8

PUMP CASING AND TRANSIT ASSY FOR BWCP

PUMP CASING AND TRANSIT ASSY FOR BWCP

1 no Delivery: 180 days
#9

MOTOR AND TRANSIT ASSY FOR BWCP

MOTOR AND TRANSIT ASSY FOR BWCP

1 no Delivery: 180 days
#10

DUPLEX THERMOCOUPLE FOR MOTOR BWCP

DUPLEX THERMOCOUPLE FOR MOTOR BWCP

1 set Delivery: 180 days
#11

DUPLEX THERMOCOUPLE PUMP CASING BWCP

DUPLEX THERMOCOUPLE PUMP CASING BWCP

1 set Delivery: 180 days
#12

FLOW RATOR WITH AMPLIFIER

FLOW RATOR WITH AMPLIFIER

1 set Delivery: 180 days
#13

GASKETS ORINGSMOTOR PUMP HB FLANGES

GASKETS ORINGSMOTOR PUMP HB FLANGES

1 set Delivery: 180 days
#14

PUMP CASING AND TRANSIT ASSY FOR BWCP

PUMP CASING AND TRANSIT ASSY FOR BWCP

1 no Delivery: 240 days
#15

MOTOR AND TRANSIT ASSY FOR BWCP

MOTOR AND TRANSIT ASSY FOR BWCP

1 no Delivery: 240 days
#16

DUPLEX THERMOCOUPLE FOR MOTOR BWCP

DUPLEX THERMOCOUPLE FOR MOTOR BWCP

1 set Delivery: 240 days
#17

DUPLEX THERMOCOUPLE PUMP CASING BWCP

DUPLEX THERMOCOUPLE PUMP CASING BWCP

1 set Delivery: 240 days
#18

FLOW RATOR WITH AMPLIFIER

FLOW RATOR WITH AMPLIFIER

1 set Delivery: 240 days
#19

GASKETS ORINGSMOTOR PUMP HB FLANGES

GASKETS ORINGSMOTOR PUMP HB FLANGES

1 set Delivery: 240 days
#20

REMOVABLE LIFTING LUGS FOR BWCP

REMOVABLE LIFTING LUGS FOR BWCP

2 no Delivery: 240 days
#21

TEMPERATURE GAUGE FOR MOTOR BWCP

TEMPERATURE GAUGE FOR MOTOR BWCP

1 no Delivery: 240 days
#22

BLIND FLANGE FOR PUMP CASING

BLIND FLANGE FOR PUMP CASING

1 no Delivery: 240 days
#23

GASKETPUMP CASING AND BLIND FLANGE MATING

GASKETPUMP CASING AND BLIND FLANGE MATING

1 no Delivery: 240 days
#24

HEAT EXCHANGER WITH MOUNTING BRACKET

HEAT EXCHANGER WITH MOUNTING BRACKET

1 set Delivery: 240 days
#25

COMPLETE STUD TENSIONING KIT

COMPLETE STUD TENSIONING KIT

1 set Delivery: 240 days
#26

WELD PAD FOR TEMPERATURE ELEMENTS

WELD PAD FOR TEMPERATURE ELEMENTS

1 set Delivery: 240 days
#27

GASKETS ORINGS FOR BWCP

GASKETS ORINGS FOR BWCP

1 set Delivery: 180 days
#28

GASKETS ORINGS FOR BWCP

GASKETS ORINGS FOR BWCP

1 set Delivery: 240 days
#29

ANY OTHER SPECIAL TOOLSANDTACKLES FOR BWCP

ANY OTHER SPECIAL TOOLSANDTACKLES FOR BWCP

1 set Delivery: 180 days
#30

IMPELLER PULLER FOR BWCP

IMPELLER PULLER FOR BWCP

1 no Delivery: 180 days
#31

THRUST NUT SPANNER FOR BWCP

THRUST NUT SPANNER FOR BWCP

1 no Delivery: 180 days
#32

THRUST DISC PULLER FOR BWCP

THRUST DISC PULLER FOR BWCP

1 no Delivery: 180 days
#33

IMPELLER NUT SPANNER FOR BWCP

IMPELLER NUT SPANNER FOR BWCP

1 no Delivery: 180 days
#34

MOTOR REMOVABLE LIFTING LUGS FOR BWCP

MOTOR REMOVABLE LIFTING LUGS FOR BWCP

1 set Delivery: 180 days
#35

LIFTING EYES AS NECESSARY FOR BWCP

LIFTING EYES AS NECESSARY FOR BWCP

1 set Delivery: 180 days
#36

LIFTING PLATEEYE BOLTS MOTOR INTERNAL

LIFTING PLATEEYE BOLTS MOTOR INTERNAL

1 set Delivery: 180 days
#37

THRUST NUT SPANNER FOR BWCP

THRUST NUT SPANNER FOR BWCP

1 no Delivery: 240 days
#38

THRUST DISC PULLER FOR BWCP

THRUST DISC PULLER FOR BWCP

1 no Delivery: 240 days
#39

IMPELLER NUT SPANNER FOR BWCP

IMPELLER NUT SPANNER FOR BWCP

1 no Delivery: 240 days
#40

MOTOR REMOVABLE LIFTING LUGS FOR BWCP

MOTOR REMOVABLE LIFTING LUGS FOR BWCP

1 set Delivery: 240 days
#41

LIFTING EYES AS NECESSARY FOR BWCP

LIFTING EYES AS NECESSARY FOR BWCP

1 set Delivery: 240 days
#42

LIFTING PLATEEYE BOLTS MOTOR INTERNAL

LIFTING PLATEEYE BOLTS MOTOR INTERNAL

1 set Delivery: 240 days
#43

ANY OTHER SPECIAL TOOLS and TACKLES FOR BWCP

ANY OTHER SPECIAL TOOLS and TACKLES FOR BWCP

1 set Delivery: 240 days
#44

IMPELLER PULLER FOR BWCP

IMPELLER PULLER FOR BWCP

1 no Delivery: 240 days
#45

COMPLETE BWC PUMP WITH MOTOR ASSEMBLY

COMPLETE BWC PUMP WITH MOTOR ASSEMBLY

1 no Delivery: 300 days
#46

JOURNAL BEARING FOR BWCP

JOURNAL BEARING FOR BWCP

2 set Delivery: 300 days
#47

THRUST BEARING FOR BWCP

THRUST BEARING FOR BWCP

3 set Delivery: 300 days
#48

CASING WEAR RINGS FOR BWCP

CASING WEAR RINGS FOR BWCP

3 set Delivery: 300 days
#49

IMPELLER WEAR RINGS FOR BWCP

IMPELLER WEAR RINGS FOR BWCP

4 set Delivery: 300 days
#50

SET OF GASKETS FOR BWCP

SET OF GASKETS FOR BWCP

4 set Delivery: 300 days
#51

SET OF O RINGS FOR BWCP

SET OF O RINGS FOR BWCP

4 set Delivery: 300 days
#52

MOTOR HEAT EXCHANGER ASSEMBLY FOR BWCP

MOTOR HEAT EXCHANGER ASSEMBLY FOR BWCP

2 set Delivery: 300 days
#53

STRAINERS FOR BWCP

STRAINERS FOR BWCP

2 set Delivery: 300 days
#54

CFD AND FEM Analysis

CFD AND FEM Analysis

1 pump Delivery: 120 days
#55

Hot Type Test

Hot Type Test

1 pump Delivery: 120 days
#56

Erection and Commissioning for 14 man days per pump Rate quoted should be per man day

Erection and Commissioning for 14 man days per pump Rate quoted should be per man day

28 per man day Delivery: 120 days
#57

Traing to end user Rate quoted should be per man day

Traing to end user Rate quoted should be per man day

10 per man day Delivery: 120 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

3 Updates
#1

Update

18-Oct-2025

Extended Deadline

24-Oct-2025, 2:00 pm

Opening Date

24-Oct-2025, 2:30 pm

#2

Update

10-Oct-2025

Extended Deadline

18-Oct-2025, 2:00 pm

Opening Date

18-Oct-2025, 2:30 pm

#3

Update

22-Sep-2025

Extended Deadline

10-Oct-2025, 2:00 pm

Opening Date

10-Oct-2025, 2:30 pm