Progress
RAQuantity
315
Category
Duct Cooler
Bid Type
Two Packet Bid
The opportunity is issued by the Indian Army (Department of Military Affairs) for procurement under a bundle of items including Duct Cooler, GI Cooler Grill, Mounting Stand, Electric Work, GI Ducting. Location is GURDASPUR, PUNJAB - 143505 with an estimated contract value of ₹3.0 (units not specified) and no explicit EMD amount disclosed. The tender grants an option clause to vary quantity up to ±25% of the bid quantity, with extended delivery timelines calculated as (additional quantity ÷ original quantity) × original delivery period, minimum 30 days. Delivery period considerations commence from the last date of the original delivery order. Unique terms emphasize price protection at contracted rates during extensions and compulsory adherence to the option clause. This tender targets suppliers capable of delivering a range of ducting and mounting hardware to a defense installation with a single consolidated contract approach.
Product categories: Duct Cooler, GI Ducting, GI Cooler Grill, Mounting Stand
Estimated contract value: ₹3.0 (currency not specified; assume INR)
Delivery terms: as per option clause; minimum 30 days for additional delivery time
Taxes: bidder bears Toll/Entry/Octroi as part of Basic Rate
Demurrage: 0.5% of total contract value per day after 48 hours; destruction after one month
5 BOQ items exist; specific quantities not disclosed
Quantity adjustment: ±25% during contract at contracted rates
Delivery period tied to last date of original order; 30+ days minimum for extensions
Tax/duty included in bid; no separate local tax payments by buyer
No explicit payment terms disclosed; taxes borne by bidder; end-to-end bid submission includes EFT mandate
Delivery window linked to original delivery order date; extended time formula with minimum 30 days
Demurrage at 0.5% of contract value per day for unlifted items after 48 hours; destruction after one month
Not under liquidation, court receivership, or bankruptcy
Must upload PAN, GSTIN, and EFT Mandate
Compliance with option clause and delivery-time calculations
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Duct Cooler , GI Cooler Grill , Mounting Stand , Electric Work , GI Ducting
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Duct Cooler
Supply and Installation Duct Cooler Capacity 1.5 KVA with Speed 20000 CMH
GI Cooler Grill
Supply and Installation GI Duck Cooler Grill
Mounting Stand
Supply and Installation Iron Based Mounting Stand
Electric Work
Supply and Installation Electric Boards and Switches
GI Ducting
Ducting of Cooling System in the Hall
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Duct Cooler | Supply and Installation Duct Cooler Capacity 1.5 KVA with Speed 20000 CMH | 3 | nos | arai@5571 | 15 | |
| 2 | GI Cooler Grill | Supply and Installation GI Duck Cooler Grill | 6 | nos | arai@5571 | 15 | |
| 3 | Mounting Stand | Supply and Installation Iron Based Mounting Stand | 3 | nos | arai@5571 | 15 | |
| 4 | Electric Work | Supply and Installation Electric Boards and Switches | 3 | nos | arai@5571 | 15 | |
| 5 | GI Ducting | Ducting of Cooling System in the Hall | 300 | square feet | arai@5571 | 15 |
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Vendor code creation documentation
Any certificates/documents sought in Bid document/ATC/Corrigendum
OEM authorization (if applicable)
Start
08-Jul-2026, 11:00 am
End
09-Jul-2026, 11:00 am
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | JAGDAMBA MFG. & TRADING CO.(MSE,MII) Under PMA Winner | ₹2,98,500 | Item Categories : Duct Cooler,GI Cooler Grill,Mounting Stand,Electric Work,GI Ducting |
| L2 | ELITE ENTERPRISES (MSE,MII) Under PMA | ₹4,21,800 | Item Categories : Duct Cooler,GI Cooler Grill,Mounting Stand,Electric Work,GI Ducting |
| L3 | SOLITAIRE SOLUTIONS (MSE,MII) Under PMA | ₹4,68,600 | Item Categories : Duct Cooler,GI Cooler Grill,Mounting Stand,Electric Work,GI Ducting |
🎉 L1 Winner
JAGDAMBA MFG. & TRADING CO.(MSE,MII) Under PMA
Final Price: ₹2,98,500
Key insights about PUNJAB tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate, ensure vendor code creation, and comply with the option clause allowing ±25% quantity changes. The contract includes a 30-day minimum extension and 0.5% daily demurrage after 48 hours for unlifted items; ensure all documents are uploaded with the bid.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and vendor code creation documents. Also attach any certificates listed in the Bid document/ATC/Corrigendum and OEM authorizations if applicable.
Delivery begins from the last date of the original delivery order. If the option clause is exercised for extra quantity, the extended time is calculated as (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Demurrage is set at 0.5% of total contract value per day for rejected items not lifted within 48 hours. If items remain unlifted for a month, they will be destroyed by the station board of officers and no claim will be admitted.
Yes. Toll tax, entry tax, octroi, and local taxes are not paid separately by the buyer. The seller must include these taxes in the Basic Rate quoted in the bid.
The tender covers Duct Cooler, GI Cooler Grill, Mounting Stand, Electric Work, GI Ducting with five BOQ items, though exact quantities are not disclosed in the data. Suppliers should prepare cross-functional capabilities to deliver within defense standards.
Submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate to create the vendor code. Ensure all documents match the bid submission and ATC/Corrigendum requirements to avoid rejection.
The tender data does not specify IS/ISO standards. Bidders should review ATC for any standard or certification requirements and ensure compliance with general defense procurement norms and OEM authorizations if applicable.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS