TenderDekho Logo
GEM

Indian Army fuel pipe, piston ring set, gasket set, wiring harness, and relay AC 230V procurement in Srinagar 2025

Bid Publish Date

23-Dec-2025, 5:39 pm

Bid End Date

02-Jan-2026, 6:00 pm

Progress

Issue23-Dec-2025, 5:39 pm
Technical30-12-2025 20:30:17
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

5

Category

relay AC 230V

Bid Type

Two Packet Bid

Categories 20

Tender Overview

The Indian Army, Department Of Military Affairs, seeks the supply of multiple fuel system and electrical components including fuel pipe, piston ring set, gasket set, wiring harness, and relay AC 230V for delivery at Srinagar, Jammu & Kashmir 190001. The scope is limited to the supply of goods, with an estimated quantity flexible by up to 25% and a contract delivery window tied to the original delivery period plus the option clause. The tender emphasizes post-award sample approval, OEM warranties, and a mandatory ISO 9001 certification for bidders or OEMs, reinforcing quality and traceability. Key differentiators include the option-driven quantity adjustments and the requirement for advance sample approval within 5 days of award. This procurement targets reliable after-sales support across India, with a strong focus on supplier capability to service centers near consignee locations.

Technical Specifications & Requirements

  • Product categories: fuel pipe, piston ring set, gasket set, wiring harness, relay 230V AC
  • Delivery location: consignee site in Srinagar, Jammu & Kashmir
  • Warranty: 2 years from final acceptance or post-installation, whichever is later; OEM warranty certificates required at delivery
  • Standards & certifications: ISO 9001 certification for bidder or OEM
  • Sample process: advance sample approval required within 5 days of award; corrective modifications communicated within 5 days
  • Post-award terms: option to increase quantity up to 25% of bid/contract quantity; time extension formula with minimum 30 days
  • Service support: established installation, commissioning, training, troubleshooting and maintenance network in India; service centers to be disclosed with bid

Terms, Conditions & Eligibility

  • EMD and payments: not explicitly quantified in data; bidders must comply with standard EMD submission alongside bid documentation
  • Documentation: PAN Card copy, GSTIN copy, cancelled cheque, EFT mandate certified by bank (Vendor Code creation documentation)
  • Warranty: 2-year warranty; OEM warranty certificates to be provided at delivery; after-sales service network must attend to SSC near consignee destinations
  • Delivery & scope: scope of supply covers only goods; delivery timeline linked to original delivery period and extended period as per option clause
  • Sample clause: advance sample approval within 5 days; if buyer delays, delivery period may be reset without LD
  • Quality: ISO 9001 certification mandatory for bidders or OEMs; ensure quality control and traceability

Key Specifications

  • Product names: fuel pipe, piston ring set, gasket set, wiring harness, relay AC 230V

  • Delivery location: Srinagar, Jammu & Kashmir

  • Warranty: 2 years from final acceptance or after installation/completion

  • Standards: ISO 9001 certification for bidder or OEM

  • Sample process: advance sample approval within 5 days of award

  • Option clause: quantity adjustments up to 25% during contract and currency; minimum delivery extension 30 days

Terms & Conditions

  • Option to increase/decrease quantity up to 25% with adjusted delivery

  • Advance sample approval required within 5 days of award to proceed

  • 2-year warranty with OEM certificates at delivery and robust after-sales support

Important Clauses

Payment Terms

EMD amount not specified in data; bidder must submit standard EMD and follow vendor code creation requirements with GST and bank EFT mandate

Delivery Schedule

Delivery period linked to original delivery order; option-driven extension uses a formula: (increased quantity / original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

LD terms not explicitly stated; delivery delays may trigger renegotiated timelines without LD if buyer delays sample approval

Bidder Eligibility

  • Must hold ISO 9001 certification (bidder or OEM)

  • Evidence of service centers nationwide and near consignee locations

  • Compliance with sample approval process within 5 days of award

Documents 4

GeM-Bidding-8754899.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Piston Assy,Piston Ring Set STD,Brush Electrical Contract Carbon,Fuel Filter,Pipe Fuel,head cylinde

Indian Army

JALPAIGURI, WEST BENGAL

Posted: 13 September 2025
Closed: 23 September 2025
GEM

Indian Army Fuel System Components Tender 2025 - FUEL FEED PUMP ASSEMBLY, INJECTOR ASSY, GASKET SET, IGNITION SWITCH

Indian Army

JAMMU, JAMMU & KASHMIR

Posted: 26 October 2025
Closed: 5 November 2025
GEM

PISTON RING SET,ENG HEAD GASKET,GASKET COMP SET,FUEL PIPE,V BELT,HIGH PRESSURE PIPE LINE,FUEL PIPE,

Indian Army

EAST SIKKIM, SIKKIM

Posted: 28 August 2025
Closed: 8 September 2025
GEM

piston ring,tappet gasket,muffler assy,fuel flexible pipe,alternator assy,main connector

Indian Army

WEST KAMENG, ARUNACHAL PRADESH

Posted: 15 August 2025
Closed: 25 August 2025
GEM

FUEL PIPE,FUEL PUMP ASSY,IGNITION COIL,FUEL COMP PIPE,RING PISTON,OIL SEAL,RECTIFIER,COMP GASKET SE

Indian Army

Posted: 2 November 2024
Closed: 23 November 2024
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 fuel pipe fuel pipe 1 nos sb-753@fwc 21
2 piston ring set piston ring set 1 nos sb-753@fwc 21
3 gasket set gasket set 1 nos sb-753@fwc 21
4 wiring harness wiring harness 1 nos sb-753@fwc 21
5 relay AC 230V relay AC 230V 1 nos sb-753@fwc 21

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

ISO 9001 certificate (bidder or OEM)

6

OEM authorization (if applicable)

7

OEM warranty certificates (at delivery)

8

Evidence of service centers near consignee locations

9

Advance sample submission documentation within 5 days of award

Technical Results

S.No Seller Item Date Status
1GURJYOT ENTERPRISES   Under PMA-30-12-2025 20:30:17Qualified
2M/O ILLHUM ENTERPRISES   Under PMA-31-12-2025 23:56:30Qualified
3M/S Manzoor Electric Enterprises   Under PMA-01-01-2026 22:42:51Qualified

Financial Results

Rank Seller Price Item
L1M/S Manzoor Electric Enterprises(MSE)( MSE Social Category:General )    Under PMA₹66,225Item Categories : fuel pipe,piston ring set,gasket set,wiring harness,relay AC 230V
L2GURJYOT ENTERPRISES (MSE)( MSE Social Category:General )    Under PMA₹74,190Item Categories : fuel pipe,piston ring set,gasket set,wiring harness,relay AC 230V
L3M/O ILLHUM ENTERPRISES   Under PMA₹79,265Item Categories : fuel pipe,piston ring set,gasket set,wiring harness,relay AC 230V

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for IS 9001 certified fuel components tender in Srinagar?

Bidders must ensure ISO 9001 certification (bidder or OEM), submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorization. Include advance sample readiness within 5 days of award and provide OEM warranty certificates at delivery. Follow the option clause for quantity adjustments up to 25%.

What documents are required for bidder registration in this Army procurement?

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, ISO 9001 certificate, OEM authorization if applicable, and evidence of service centers near consignee locations. Also prepare OEM warranty certificates and sample submission within 5 days of award.

What is the sample approval process and timeline for this tender?

Submit 1 advance sample within 5 days of award. The buyer will approve or request modifications within 5 days. If delayed by the buyer, the delivery period may be refixed without liquidated damages. Ensure sample conforms to contract specifications for bulk manufacturing.

What are the delivery terms and quantity adjustment provisions?

Quantity may be increased or decreased by up to 25% of bid/contract quantity both at placement and during currency. Delivery time extends using the formula: (Increased quantity / Original quantity) × Original delivery period, minimum 30 days, with possible extension to original delivery period.

What warranty and after-sales support are required for Army suppliers?

A 2-year warranty from final acceptance or post-installation is required. OEM warranty certificates must be provided at delivery. The supplier must have a trained service network in India with centers near consignee destinations for installation, troubleshooting, and maintenance.

Which standards must bidders meet to participate in this procurement?

Bidders must hold ISO 9001 certification for either the bidder or the OEM. The supplier must demonstrate after-sales service capability and provide OEM warranties and service center details as part of the bid submission.

Where will the supply goods be delivered under this Army tender?

Delivery is to the consignee location in Srinagar, Jammu & Kashmir 190001. The scope is limited to supply of goods with installation/commissioning contingent on contract scope and advance sample approval timelines.

What is the scope of supply for this Army procurement?

Scope is strictly Only supply of Goods for listed items: fuel pipe, piston ring set, gasket set, wiring harness, and relay AC 230V. Delivery terms, warranties, and post-sale service align with the terms in the tender, including sample approval and ISO 9001 compliance.