TenderDekho Logo
Active GEM

Rourkela Steel Plant Condensing/Evaporating Unit Tender 2026 – Bluestar/Voltas/HITACHI/CARRIER/LG/SAMSUNG 60 Days

Bid Publish Date

06-Nov-2026, 9:13 am

Bid End Date

16-Nov-2026, 10:00 am

Location

SUNDERGARH , ODISHA

Progress

Issue06-Nov-2026, 9:13 am
AwardPending

Tender Overview

The opportunity is with the Rourkela Steel Plant under Steel Authority of India Limited for the supply of CONDENSING & EVAPORATING UNIT FOR 2T COOLING SYSTEM IN CED and related indoor/outdoor split AC components. Scope is clearly restricted to the supply of goods, with delivery expected within 60 days of PO. Eligible brands are explicitly listed as BLUESTAR, VOLTAS, HITACHI, CARRIER, LG, SAMSUNG, and the supplier must ensure the items are defect-free, with a guarantee certificate provided at delivery. Installation is included in the supplier’s scope, and all accessories must accompany the main equipment. The award will be on an overall L-1 basis, emphasizing price competitiveness. This tender, aligned with RSP procurement ethics, targets authorized manufacturers or their dealers with proper authorization letters and vendor registration if needed. The emphasis on brand names and after-sales obligations distinguishes this from generic equipment tenders.

Technical Specifications & Requirements

  • Items: Condensing & Evaporating Unit for 2T cooling system (CED)
  • Delivery: within 60 days from PO placement
  • Brand eligibility: BLUESTAR, VOLTAS, HITACHI, CARRIER, LG, SAMSUNG with all installation accessories
  • Documentation: Guarantee certificate required; supplier monogram embossing on each item
  • Installation responsibility: vendor scope; packaging to prevent transit damage; accessories included
  • Quality: defective material replaced free as per stores procedure; inspection by indentor/representative
  • Payment: 90% after garn, 10% after successful installation; price firm till delivery
  • Warranty: 18 months from garn or 12 months from commissioning (whichever earlier)
  • Packaging: damage-free transit; inspection at RSP, with L-1 pricing for award
  • Misc: manufacturer authorization for dealers; vendor registration process follows SAIl guidelines

Terms, Conditions & Eligibility

  • Eligible entities must be authorized dealers or manufacturers with valid authorization letters for invited brands
  • Vendors must be registered with SAIL via the official tenders portal and complete standard vendor registration
  • Indented items must meet technical specifications; replacement for defects at no cost
  • Embossed/tagged monogram on each item for traceability
  • Delivery and installation within the stipulated delivery window; packaging and accessories must be provided
  • Payment terms: 90% post-garn, 10% post-installation; firm pricing until delivery
  • Warranty/guarantee: 18 months from garn or 12 months from commissioning; compliance with stores procedure
  • Inspection: conducted by indenter or HOD, CED & MM (Inspection), RSP, Rourkela
  • All terms to be executed on an overall L-1 basis for award

Key Specifications

  • Product: Condensing & Evaporating Unit for 2T cooling system in CED

  • Delivery window: 60 days from PO placement

  • Brand options: Bluestar, Voltas, Hitachi, Carrier, LG, Samsung

  • Guarantee: 18 months from garn or 12 months from commissioning

  • Installation: Vendor responsibility; all installation accessories to be supplied

  • Inspection: Indentor or representative of HOD, CED & MM (Inspection), RSP

  • Packaging: Suitable packing to prevent transit/multiples handling

  • Monogram: Supplier embossing/tagging on each item for visibility

  • Payment: 90% post garn, 10% post installation; price firm till delivery

Terms & Conditions

  • L-1 based award on overall price with brand eligibility

  • Vendor must provide valid OEM authorization letters

  • Installation included; defect-free replacement as per stores procedure

Important Clauses

Payment Terms

90% payment after garn and 10% after successful installation; price remains firm till delivery; no advance unless specified

Delivery Schedule

Items to be delivered within 60 days from PO placement; delays may affect L-1 evaluation

Penalties/Liquidated Damages

Not explicitly stated; ensure compliance with stores procedure for defects and timely delivery

Bidder Eligibility

  • Authorized dealer with manufacturer authorization letter for invited brands

  • Vendor registered with SAIL via sailtenders.co.in and approved by RSP

  • Experience in supplying condensing/evaporating units with installation capability

Advertisement

Tender Data

Bid Details

Quantity

16

Category

EVAPORATING UNIT, INDOOR, F/2.0TR SPLIT AC

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

CONDENSING UNIT, OUTDOOR, F/2TR SPLIT AC , EVAPORATING UNIT, INDOOR, F/2.0TR SPLIT AC

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Sundargarh

Delivery Pincodes

769011

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pramod Kumar Biswal769011,Office of GM I/c Stores & Inspection, Rourkela Steel Plant, RourkelaSundargarhOdisha769011860-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITEDROURKELA STEEL PLANT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10128165.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Materials Management Purchase

Grievance Contact

[email protected]

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply of condensing/evaporating units

4

Financial statements (last 2–3 years) demonstrating capability

5

EMD/Security deposit proof (if applicable) and online payment evidence

6

Technical bid documents confirming compliance with IS/standard where applicable

7

OEM authorization letters for invited brands (Bluestar, Voltas, Hitachi, Carrier, LG, Samsung)

8

Authorization from manufacturer for dealers (valid and specific to this tender)

9

Vendor registration proof from SAIL Tenders portal

Frequently Asked Questions

How to bid on the tender in Rourkela for 2T cooling units?

Submit OEM authorization letters for invited brands, register on SAIL tenders portal, and provide GST, PAN, experience, and financial documents. Ensure installation is included and delivery occurs within 60 days. Adhere to L-1 pricing and attach mandatory guarantee certificates.

What documents are required for the condensing unit tender in Odisha?

Provide GST certificate, PAN, 2–3 years of experience certificates for similar supplies, financial statements, EMD proof, OEM authorization letters, and installation plan. Include guarantee certificates and vendor registration proof from SAIL if applicable.

What are the brand requirements for the RSP tender in 2026?

Eligible brands are BLUESTAR, VOLTAS, HITACHI, CARRIER, LG, and SAMSUNG. Authorized dealers must submit manufacturer authorization, with embossing/tagging on each item. All installation accessories must be supplied by the vendor.

What is the payment schedule for the Rourkela tender?

Payment is 90% after garn and 10% after successful installation. Pricing remains firm until delivery. Ensure compliance with stores procedures for defect-free replacements during the warranty period.

What is the delivery timeline and warranty in this procurement?

Delivery must occur within 60 days of PO. Warranty: 18 months from garn or 12 months from commissioning, whichever is earlier. After-sales support and replacement for defects are mandatory.

How does the L-1 basis affect supplier bids for this tender?

Award will be based on the lowest total price for the complete scope of supply. Brand eligibility and installation scope are critical; ensure all accessories and guarantee certificates are included to secure L-1 consideration.

What inspection and packaging requirements apply to the goods?

Inspection is by indenter or HOD, CED & MM, RSP, with packaging to prevent transit damage. Monogram embossing on each item must be clearly visible. Defective material replaced as per stores procedure.

Advertisement