TenderDekho Logo
GEM

Contract Bidding Open For Tractors (V1) in RAIPUR, CHHATTISGARH

Bid Publish Date

21-Feb-2026, 1:11 pm

Bid End Date

13-Mar-2026, 2:00 pm

EMD

₹33,000

Progress

Issue21-Feb-2026, 1:11 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 1

N/a invites bids for Tractors (V1) (Q2) in RAIPUR, CHHATTISGARH. Quantity: 1. Submission Deadline: 13-03-2026 14: 00: 00. Submit your proposal before the deadline.

Documents 3

GeM-Bidding-9024019.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Tractors (V1)

Dudc Kolar

KOLAR, KARNATAKA

Posted: 10 November 2025
Closed: 25 November 2025
GEM

Tractors (V1)

Urban Development And Housing Department

ARARIA, BIHAR

Posted: 19 April 2025
Closed: 30 April 2025
GEM

Tractors (V1)

N/a

MAHESANA, GUJARAT

Posted: 14 October 2025
Closed: 11 November 2025
GEM

Tractors (V1)

N/a

Posted: 9 December 2025
Closed: 19 December 2025
GEM

ICAR Indian Council of Agricultural Research Tractors Tender Hyderabad Telangana 2025 ISO/IS 550 Standard

Indian Council Of Agricultural Research (icar)

Posted: 28 November 2025
Closed: 15 December 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Generic Parameters Max Engine Power (HP) 60.1 - 150.0 Or higher
Generic Parameters Maximum PTO Power (HP) 53.9 - 145.0 Or higher
Generic Parameters Operator Station Open station, Close station without AC, Close station with AC Or higher
Generic Parameters Engine Aspiration System Natural
Generic Parameters Type of Wheel drive Two Wheel Drive
Generic Parameters Type of Steering Power Operated

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer