TenderDekho Logo
Closed GEM

Indian Air Force coolant reservoir and related hose assemblies tender Coimbatore Tamil Nadu 2026

Bid Publish Date

30-Sep-2026, 12:54 pm

Bid End Date

10-Oct-2026, 1:00 pm

Progress

Issue30-Sep-2026, 12:54 pm
AwardPending

Key Highlights

  • • Technical scope defined in Buyer Uploaded ATC/Scope of Work documents
  • • 15 item BOQ with unspecified quantities requiring ATC clarification
  • • 100% payment after PRI and completion certificate
  • • LD clause and warranty as per DPM 2025; no extension beyond delivery period

Tender Overview

The Indian Air Force, Department of Military Affairs, invites bids for a comprehensive set of hydraulic and cooling system components, including coolant reservoir, radiator inlet/outlet hoses, oil cooler hoses, bypass hoses, pulley idler assembly, starter motor Lucas, vacuum modulator EGR, pump-to-gear hoses, heater outlet hoses, and related hardware. Located in Coimbatore, Tamil Nadu 641001, the procurement comprises 15 BOQ items with a broad scope spanning intake, cooling, lubrication, and drive-line fittings. The scope emphasizes OEM/approved parts compatible with specified aircraft systems and end-to-end supply, including installation-ready assemblies. The buyer-drafted ATC/Scope of Work requires strict adherence to declared terms with heavy penalties for deviations and a robust post-delivery warranty framework.

Technical Specifications & Requirements

  • No explicit specifications visible in the public snippet; ATC documents house the actual scope of work and technical parameters.
  • Expected items cover coolant reservoir assemblies, radiator hoses (inlet/outlet), oil cooler hoses, bypass hoses, pulley idler/tensioner assemblies, starter motor Lucas, vacuum modulator EGR, pump-to-gear hoses, and heater/outlet hoses.
  • BoQ indicates 15 items; item-level quantities and unit measurements are not disclosed in the provided data, so bidders must rely on the ATC/SOW for exact values.
  • Critical compliance elements likely include supplier certification, alignment with DPM 2025 warranty/LD, and risk of PBG forfeiture for deviations.

Terms, Conditions & Eligibility

  • 100% payment post item delivery and certification (PRI) as per buyer ATC terms.
  • Performance security Deposit (PBG) and LD/warranty as per DPM 2025 directives.
  • Rejection policy assigns responsibility for collection of rejected items to the supplier; all related charges borne by supplier.
  • No delivery period extensions beyond the stated deadline; deviations may trigger penalties.
  • Supplier must certify conformity to all Buyer-added ATC/Scope of Work, with office seal and signature; deviations can lead to blacklist and tender rejection.
  • Documentation to be uploaded per bidder’s compliance with certificates/documents requested in ATC/BDC and Corrigendum.

Key Specifications

  • Product/service names: coolant reservoir assemblies, radiator inlet/outlet hoses, oil cooler hoses, bypass hoses, pulley idler/tensioner, starter motor Lucas, vacuum modulator EGR, pump-to-gear hoses, heater outlet hoses

  • Quantities: 15-item BOQ (quantities not disclosed in data; refer to ATC for exact numbers)

  • EMD/Estimated value: Not disclosed in provided data; rely on ATC/BoQ documents

  • Experience: Prior supply of aircraft cooling and hydraulic hose assemblies preferred

  • Quality/compliance: OEM authorization, ISI/ISO certifications as applicable; warranty under DPM 2025

Terms & Conditions

  • 100% payment after PRI and certification per ATC

  • LD and warranty based on DPM 2025; no extension past delivery

  • Supplier bears responsibility for rejected items and related charges

Important Clauses

Payment Terms

100% payment after PRI completion and issue of item acceptance certificate per ATC; no advance payment mentioned.

Delivery Schedule

Delivery timelines governed by ATC; no extension granted after delivery period.

Penalties/Liquidated Damages

LD clause as per DPM 2025; deviations may trigger penalties and potential blacklist.

Bidder Eligibility

  • Experience in supplying aircraft cooling/hose assemblies or related equipment

  • GST registration and valid financial statements

  • Compliance with Buyer Added ATC/SOW and non-deviation certification

Advertisement

Authority & Contact

Organization

Indian Air Force

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

15

Category

COOLANT RESERVOIR

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

COOLANT RESERVOIR , ASSY HOSE RADIATOR INLET NA , HOSE RADIATOR OUTLET TC , HOSE RADIATOR OUTLET , HOSE RADIATOR OUT TO WATER PUMP , HOSE HEATET INLET , HOSE OIL COOLER , HOSE BYPASS , ASSY PULLEY IDLER N TENSIONER , SARTER MOTOR LUCAS , VACCUM MODULATOR EGR , HOSE PUMP TO GEAR , HOSE RESERVIOR TO PUMP , HOSE HEATER OUTLET , HOSE OIL COOLER OUTLET

Delivery Details

Max Delivery Days

20

Delivery Locations

1

Delivery Cities

Coimbatore

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-CoimbatoreCoimbatore--120-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9967779.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

COOLANT RESERVOIR

COOLANT RESERVOIR

1 pieces Delivery: 20 days
#2

ASSY HOSE RADIATOR INLET NA

ASSY HOSE RADIATOR INLET NA

1 pieces Delivery: 20 days
#3

HOSE RADIATOR OUTLET TC

HOSE RADIATOR OUTLET TC

1 pieces Delivery: 20 days
#4

HOSE RADIATOR OUTLET

HOSE RADIATOR OUTLET

1 pieces Delivery: 20 days
#5

HOSE RADIATOR OUT TO WATER PUMP

HOSE RADIATOR OUT TO WATER PUMP

1 pieces Delivery: 20 days
#6

HOSE HEATET INLET

HOSE HEATET INLET

1 pieces Delivery: 20 days
#7

HOSE OIL COOLER

HOSE OIL COOLER

1 pieces Delivery: 20 days
#8

HOSE BYPASS

HOSE BYPASS

1 pieces Delivery: 20 days
#9

ASSY PULLEY IDLER N TENSIONER

ASSY PULLEY IDLER N TENSIONER

1 pieces Delivery: 20 days
#10

SARTER MOTOR LUCAS

SARTER MOTOR LUCAS

1 pieces Delivery: 20 days
#11

VACCUM MODULATOR EGR

VACCUM MODULATOR EGR

1 pieces Delivery: 20 days
#12

HOSE PUMP TO GEAR

HOSE PUMP TO GEAR

1 pieces Delivery: 20 days
#13

HOSE RESERVIOR TO PUMP

HOSE RESERVIOR TO PUMP

1 pieces Delivery: 20 days
#14

HOSE HEATER OUTLET

HOSE HEATER OUTLET

1 pieces Delivery: 20 days
#15

HOSE OIL COOLER OUTLET

HOSE OIL COOLER OUTLET

1 pieces Delivery: 20 days
Advertisement

Categories 19

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar cooling-system or hose assembly supply

4

Financial statements (balance sheet and profit & loss for last 2-3 years)

5

EMD/Security deposit as specified in ATC

6

Technical bid documents aligned with ATC/SOW

7

OEM authorization letters for third-party manufacturers (if applicable)

Frequently Asked Questions

Key insights about TAMIL NADU tender market

What documents are required for the IAF coolant hose tender in Coimbatore 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD as specified in ATC, technical bid aligned to scope, and OEM authorizations if applicable. ATC mandates office-sealed certs agreeing to scope with no deviations to avoid blacklisting.

How is payment structured for the IAF outage equipment tender in Tamil Nadu?

The contract specifies 100% payment after PRI and item certification as per the Buyer ATC; no advance payment is indicated. Ensure timely delivery and certification to trigger payment, with warranty terms per DPM 2025.

What are the key technical scopes for the IAF 2026 hose assemblies?

Scope includes coolant reservoir assemblies, various radiator hoses (inlet/outlet), oil cooler hoses, bypass hoses, pulley idler/tensioner, starter motor Lucas, vacuum modulator EGR, and heater/outlet hoses; exact quantities are within the 15-item BOQ per ATC.

What are the delivery extension rules for the IAF tender in Coimbatore?

No extensions are granted after the delivery period expires as per ATC; bidders must plan for delivery within the specified timeline and maintain compliance to avoid penalties.

What certifications are required for bidders in this IAF procurement?

Bidders should provide OEM authorizations, and align with any IS/ISO or aircraft-appropriate standards stated in ATC; noncompliance can lead to rejection and blacklisting.

How to prepare for the 15-item BOQ in the IAF Coimbatore tender?

Refer to the ATC for item-wise scope and quantities. Ensure each item aligns with OEM specifications, provide complete technical bids, and certify conformance to SOW; quantities are not disclosed publicly.

What penalties apply for deviations from the IAF ATC Scope of Work?

Deviations can trigger blacklisting and forfeiture of PBG; strict adherence to the Buyer-Uploaded ATC/Scope is mandatory, with noncompliance leading to tender rejection.

When does the IAF 2026 coolant items procurement require supplier warranty?

Warranty terms follow DPM 2025; ensure the goods come with standard warranty and post-delivery support per ATC; LD penalties apply for nonconformance or late delivery.

Advertisement