TenderDekho Logo
Closed GEM

Bids are Invited For Safety Relief Valves for CO2 Booster Drive Turbine of Urea-III Plant,packing,forwardin,freight,insu in DIBRUGARH, ASSAM

Bid Publish Date

17-Jun-2026, 9:52 am

Bid End Date

15-Jul-2026, 10:00 am

EMD

₹15,888

Progress

RA
Issue17-Jun-2026, 9:52 am
Reverse AuctionCompleted
Award10-Oct-2026, 3:16 am

Public procurement opportunity for Brahmaputra Valley Fertilizer Corporation Limited (bvfcl) Safety Relief Valves for CO2 Booster Drive Turbine of Urea- III Plant, packing, forwardin, freight, insurance in DIBRUGARH, ASSAM. Quantity: 6 issued by. Submission Deadline: 15-07-2026 10: 00: 00. View full details and respond.

Advertisement

Authority & Contact

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1V-TECH VALVES AND CONTROLS(MSE,MII)   Under PMA Winner ₹3,83,740Item Categories : Safety Relief Valves for CO2 Booster Drive Turbine of Urea-III Plant,packing,forwardin,freight,insu
L2UNI KLINGER LIMITED (MII)   Under PMA₹3,84,680Item Categories : Safety Relief Valves for CO2 Booster Drive Turbine of Urea-III Plant,packing,forwardin,freight,insu
L3RAJU BANIK (MSE,MII)   Under PMA₹11,60,001Item Categories : Safety Relief Valves for CO2 Booster Drive Turbine of Urea-III Plant,packing,forwardin,freight,insu

🎉 L1 Winner

V-TECH VALVES AND CONTROLS(MSE,MII)   Under PMA

Final Price: ₹3,83,740

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Reverse Auction Schedule

Completed

Start

06-Sep-2026, 5:00 pm

End

07-Sep-2026, 5:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

6

Category

Safety Relief Valves for CO2 Booster Drive Turbine of Urea- III Plant

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

12

Past Performance

20 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Safety Relief Valves for CO2 Booster Drive Turbine of Urea- III Plant , packing , forwardin , freight , insurance

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

28

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Dibrugarh

Delivery Pincodes

786623

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pranjal Deep Gogoi786623,BVFCL, Namrup, PO ParbatpurDibrugarhAssam7866232120-

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENT
Advertisement

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9478600.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Safety Relief Valves for CO2 Booster Drive Turbine of Urea-III Plant

safety relief valve

2 nos Delivery: 120 days
#2

packing

safety relief valve

1 lot Delivery: 120 days
#3

forwardin

safety relief valve

1 lot Delivery: 120 days
#4

freight

safety relief valve

1 lot Delivery: 120 days
#5

insurance

safety relief valve

1 lot Delivery: 120 days

Categories 14

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement