TenderDekho Logo
Closed GEM

Open Tender for Leather Safety Shoes with Steel Toe Cap,Leather Safety Shoes without Steel Toe Cap,Leather Safety F in BOKARO, JHARKHAND

Bid Publish Date

10-Aug-2026, 12:58 pm

Bid End Date

20-Aug-2026, 3:00 pm

EMD

₹5,000

Progress

Issue10-Aug-2026, 12:58 pm
AwardPending

A tender has been published for Sail Refractory Unit Leather Safety Shoes with Steel Toe Cap, Leather Safety Shoes without Steel Toe Cap, Leather Safety Footwear Female, Industrial Safety Helmet White, Industrial Safety Helmet Blue, Industrial Safety Helmet Green, Dust Mask, Dust Goggles, Flame Retardant Jacket, Nitrile Hand Gloves Laboratory, Chemical Splash Resistant Goggles, Face Shield, Chemical Mask, High Temperature Resistance Gloves, Insulated Rubber Gloves 440V Class-0, Insulated Rubber Gloves 11 kV Class-3, Insulated Rubber Gloves 33 kV Class-4, Electrical Safety Gum Boot, Eye Wash Shower, 3M Retro-Reflective Tape, Caution Tape Danger, Corded Ear Plug NRR 29 dB, Ear Muff NRR 23 dB, Cut Resistant Gloves Level 5, Cotton Gloves with PVC Dots, Leather Welding Gloves 14, Full Body Harness with Double Lanyard, Retractable Fall Arrestor 10 m, Arc Flash Suit 40 Cal, Helmet Mount Face Visor, Lux Meter, Discharge Earthing Rod 11 by 33 kV, Rescue Rod by Hook, Non-Contact Voltage Detector, Safety Helmet HAT Red Colour with Electrical Insulation 33kv, Insulating Rubber Mat 33 kV 1 into 10 m, Insulating Rubber Mat 11 kV 1 into 10 m, Insulating Rubber Mat 440 V 1 into 10 m, Insulated FRP Ladder 10 ft, First Aid Kit, Heavy Duty Industrial Self Supporting FRP Ladder 21 ft with Rope and Pulley System and Vertical Lifeline Rope Grab Fall Arrester in BOKARO, JHARKHAND. Quantity: 719 by. Submission Deadline: 20-08-2026 15: 00: 00. Check eligibility and apply.

Authority & Contact

Office Name

Sru Sail

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

719

Category

Full Body Harness with Double Lanyard

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

4 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Leather Safety Shoes with Steel Toe Cap , Leather Safety Shoes without Steel Toe Cap , Leather Safety Footwear Female , Industrial Safety Helmet White , Industrial Safety Helmet Blue , Industrial Safety Helmet Green , Dust Mask , Dust Goggles , Flame Retardant Jacket , Nitrile Hand Gloves Laboratory , Chemical Splash Resistant Goggles , Face Shield , Chemical Mask , High Temperature Resistance Gloves , Insulated Rubber Gloves 440V Class-0 , Insulated Rubber Gloves 11 kV Class-3 , Insulated Rubber Gloves 33 kV Class-4 , Electrical Safety Gum Boot , Eye Wash Shower , 3M Retro-Reflective Tape , Caution Tape Danger , Corded Ear Plug NRR 29 dB , Ear Muff NRR 23 dB , Cut Resistant Gloves Level 5 , Cotton Gloves with PVC Dots , Leather Welding Gloves 14 , Full Body Harness with Double Lanyard , Retractable Fall Arrestor 10 m , Arc Flash Suit 40 Cal , Helmet Mount Face Visor , Lux Meter , Discharge Earthing Rod 11 by 33 kV , Rescue Rod by Hook , Non-Contact Voltage Detector , Safety Helmet HAT Red Colour with Electrical Insulation 33kv , Insulating Rubber Mat 33 kV 1 into 10 m , Insulating Rubber Mat 11 kV 1 into 10 m , Insulating Rubber Mat 440 V 1 into 10 m , Insulated FRP Ladder 10 ft , First Aid Kit , Heavy Duty Industrial Self Supporting FRP Ladder 21 ft with Rope and Pulley System and Vertical Lifeline Rope Grab Fall Arrester

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Bokaro

Delivery Pincodes

829132

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Jogeswar Guiya829132,SAIL REFRACTORY UNIT BHANDARIDAH, P.O. BHANDARIDAH- 829132, DIST BOKAROBokaroJharkhand8291324445-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9707995.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 41 Items Sign in for GEM prices

#1

Leather Safety Shoes with Steel Toe Cap

As per ATC

44 pair Delivery: 45 days
#2

Leather Safety Shoes without Steel Toe Cap

As per ATC

84 pair Delivery: 45 days
#3

Leather Safety Footwear Female

As per ATC

5 pair Delivery: 45 days
#4

Industrial Safety Helmet White

As per ATC

30 nos Delivery: 45 days
#5

Industrial Safety Helmet Blue

As per ATC

64 nos Delivery: 45 days
#6

Industrial Safety Helmet Green

As per ATC

2 nos Delivery: 45 days
#7

Dust Mask

As per ATC

206 nos Delivery: 45 days
#8

Dust Goggles

As per ATC

136 nos Delivery: 45 days
#9

Flame Retardant Jacket

As per ATC

20 nos Delivery: 45 days
#10

Nitrile Hand Gloves Laboratory

As per ATC

20 pair Delivery: 45 days
#11

Chemical Splash Resistant Goggles

As per ATC

5 nos Delivery: 45 days
#12

Face Shield

As per ATC

5 nos Delivery: 45 days
#13

Chemical Mask

As per ATC

8 nos Delivery: 45 days
#14

High Temperature Resistance Gloves

As per ATC

6 pair Delivery: 45 days
#15

Insulated Rubber Gloves 440V Class-0

As per ATC

2 pair Delivery: 45 days
#16

Insulated Rubber Gloves 11 kV Class-3

As per ATC

1 pair Delivery: 45 days
#17

Insulated Rubber Gloves 33 kV Class-4

As per ATC

1 pair Delivery: 45 days
#18

Electrical Safety Gum Boot

As per ATC

2 pair Delivery: 45 days
#19

Eye Wash Shower

As per ATC

4 nos Delivery: 45 days
#20

3M Retro-Reflective Tape

As per ATC

4 rolls Delivery: 45 days
#21

Caution Tape Danger

As per ATC

4 rolls Delivery: 45 days
#22

Corded Ear Plug NRR 29 dB

As per ATC

4 pair Delivery: 45 days
#23

Ear Muff NRR 23 dB

As per ATC

4 pair Delivery: 45 days
#24

Cut Resistant Gloves Level 5

As per ATC

2 pair Delivery: 45 days
#25

Cotton Gloves with PVC Dots

As per ATC

10 pair Delivery: 45 days
#26

Leather Welding Gloves 14

As per ATC

2 pair Delivery: 45 days
#27

Full Body Harness with Double Lanyard

As per ATC

1 nos Delivery: 45 days
#28

Retractable Fall Arrestor 10 m

As per ATC

1 nos Delivery: 45 days
#29

Arc Flash Suit 40 Cal

As per ATC

1 set Delivery: 45 days
#30

Helmet Mount Face Visor

As per ATC

4 set Delivery: 45 days
#31

Lux Meter

As per ATC

1 nos Delivery: 45 days
#32

Discharge Earthing Rod 11 by 33 kV

As per ATC

1 nos Delivery: 45 days
#33

Rescue Rod by Hook

As per ATC

1 nos Delivery: 45 days
#34

Non-Contact Voltage Detector

As per ATC

2 nos Delivery: 45 days
#35

Safety Helmet HAT Red Colour with Electrical Insulation 33kv

As per ATC

4 nos Delivery: 45 days
#36

Insulating Rubber Mat 33 kV 1 into 10 m

As per ATC

6 pcs Delivery: 45 days
#37

Insulating Rubber Mat 11 kV 1 into 10 m

As per ATC

6 pcs Delivery: 45 days
#38

Insulating Rubber Mat 440 V 1 into 10 m

As per ATC

12 pcs Delivery: 45 days
#39

Insulated FRP Ladder 10 ft

As per ATC

1 nos Delivery: 45 days
#40

First Aid Kit

As per ATC

2 nos Delivery: 45 days
#41

Heavy Duty Industrial Self Supporting FRP Ladder 21 ft with Rope and Pulley System and Vertical Lifeline Rope Grab Fall Arrester

As per ATC

1 nos Delivery: 45 days

Categories 53

Required Documents

1

Experience Criteria

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer