Bid Publish Date
20-Dec-2025, 7:29 pm
Bid End Date
10-Jan-2026, 8:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Petroleum Corporation Ltd invites bids for a 1 unit 450 CFM VFD-based air compressor with a separate air dryer unit and dew point monitoring, for LPG plant operations in Deoria, Uttar Pradesh. The scope includes delivery and installation with a mandatory site visit. Acknowledge an option clause allowing up to 25% quantity variation during or after contracting, at contracted rates. The project emphasizes timely delivery with a strict completion target and requires bidders to plan for on-site installation and equipment integration. The estimated value and EMD are not disclosed in the tender data, but the clause highlights the need for readiness to deploy with dew point monitoring capabilities and LPG plant compatibility.
1 x 450 CFM air compressor with VFD drive
Separate air dryer unit with dew point monitoring
LPG plant operations compatibility
Site visit mandatory prior to submission
Delivery and installation by 25 March
Option clause allowing ±25% quantity variation at contracted rates
Delivery period linked to original order with extended calculation
Site visit mandatory to understand scope and prevent discrepancies
Delivery and installation must be completed by 25 March; extension calculations apply if quantity changes
Purchaser may increase or decrease order quantity up to 25% during or after contract at same rates
Site visit is mandatory before bid submission to ensure accurate scope and prevent discrepancies
Experience in supplying/installing 450 CFM air compressors with VFD and dew-point dryers
Demonstrated ability to install equipment at LPG facilities
Financial capability to undertake delivery and on-site commissioning
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply and Installation of 1 nos of 450 CFM Air Compressor VFD based with Separate Air Dryer Unit
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar air compressor installations
Financial statements or Banker’s certificate
Previous performance certificates (if any)
Technical compliance documents for VFD air compressors and dew-point dryer
OEM authorization or dealer authorization for the specified model
Any site visit reports or pre-bid meeting notes (if available)
Key insights about UTTAR PRADESH tender market
Bidders should first ensure eligibility for BPCL Deoria, register on the portal, and obtain the bid document. Prepare 450 CFM VFD air compressor with dew-point monitored dryer specs, site visit proof, OEM authorization, GST/PAN, and financial statements. Submit technical and commercial bids online before final submission.
Required documents include GST registration, PAN, experience certificates for similar projects, financial statements, EMD evidence if applicable, OEM/authorized dealer authorization for the VFD compressor with dew point dryer, and technical compliance sheets showing capacity and dew point monitoring features.
Technical requirements specify a 450 CFM capacity, VFD drive, and a separate air dryer unit with dew point monitoring suitable for LPG plant operations. Ensure compatibility with plant controls, and provide performance curves, warranty terms, and installation schematics.
The critical delivery deadline is 25 March for completion of delivery and installation. Bidders should plan on on-site commissioning immediately after delivery, coordinate with LPG plant operators, and confirm availability of dew point monitoring integration prior to handover.
EMD details are not disclosed in the tender data. Bidders should monitor tender clarification responses, and be prepared to submit standard EMD as per procurement portal norms when publicized, ensuring compliance with payment terms and bid security requirements.
The tender requires a mandatory site visit before submission to accurately assess installation needs, space constraints, and integration with LPG plant systems. Schedule and confirm attendance with plant officials as directed in the ATC, and include site visit notes in the bid.
The purchaser may adjust the order by up to 25% during or after contract at the same rate. Bidders should price accordingly for scalable orders, factor lead times for potential additional units, and include a clear per-unit price and delivery schedule for incremental quantities.
The installation must integrate a dew point monitored dryer with the VFD compressor, ensuring reliable dew-point sensing, alarm interfaces, and calibration records. Include mounting diagrams, electrical wiring schematics, and commissioning report demonstrating dew point accuracy across operating ranges.